PRADEEP KUMAR REDDY JUTURU
**** ****** *****, *** **** Email: *******.******@*****.***
Irving, TX-75038 Phone: 870-***-****
KEY SKILLS
• Prolog Manager: professional in project management software Prolog Manager. Worked as an administrator.
• Primavera P6: Efficient in Scheduling software Primavera P6.
• Exceptional organizational, problem solving, team-building, leadership and negotiation skills.
• Strong Scheduling, Planning and Cost Management skills.
EDUCATION
Master of Science in CIVIL Engineering GPA: 3.6/4.0
Major: Construction Engineering and Management Dec 2010
Clemson University, Clemson, SC, USA.
Bachelor of Technology in CIVIL Engineering GPA: 3.4/4.0
Sri Venkateshwara University, Tirupati, AP, India. May 2008
WORK EXPERIENCE
Project Controls Assistant: January 2011 – Present, Foster Construction Management Group at Parkland Hospital in Dallas.
Responsibilities: Ensure timely creation and maintenance of project schedules. Use resource loaded schedule for staffing forecasting and reporting of earned value. Schedule coordination with project management, engineering, procurement and construction. Provide critical path analysis, identify problem areas, and create work-around solutions. Establish project budgets from proposal estimate, track actual costs and committed costs, and forecast remaining costs for engineering, construction and equipment procurement. Develop and maintain project funding and cash flow. Prepare and submit monthly reports for internal and external clients. Develop and maintain Construction change management system. Create change order requests, including estimated cost and schedule impacts. Interfacing with Project Managers, Contractors, procurement and Finance to ensure cost management. Maintain the database of budget transfer forms and Change order log. Ensure the Change orders and budget transfer forms are processed according to Client’s policies and procedures. Create and submit RFIs and Transmittals.
Field Engineer: May 2008-December 2008, Balaji Constructions, Pune, India.
Responsibilities: Planning of the construction site day to day activities. Responsible for quantity take off, site supervision and maintaining of records on daily basis. Responsible for Quality Management and ensuring the work is done according to the drawings and specifications. Maintained the schedule of the project associated with costs. Develop and Maintain document control system. Requisitioning of equipment and materials.
Research Assistant: August 2009-May 2010, Clemson University, Research on warm mix asphalt technology. Focused on heat loss in transportation from plant to site.
Graduate Student Hourly: February 2009-April 2009, Clemson University, Data collection of pavement markings project. Using reflect meter, collected the reflectivity of pavement markings across South Carolina.
COMPUTER SKILLS
Operating Systems: MS Windows 98/ 2000/ XP/Vista/7, OS X
Proficient in : Primavera P6, MS office, Prolog Manager.
ACADEMIC PROJECTS
Haiti Project: Clemson engineers for developing countries. Converting of shipping containers into residential homes for earthquake effected people in Haiti. Deals with cost and feasibility of the project (CEDC).
Sustainability regarding Energy and Emissions: Study on energy, emissions of buildings and other infrastructure. Concentrated on methods and equipment to reduce the energy consumption and new ways of energy productivity (LEED).
Quality Management: A study on Quality Management in Construction Industry. Study on importance of Quality Management in Construction Industry regarding time, cost and safety.
Case Study on Chinese Drywall: Case Study on Chinese Drywall issue in Florida. Discussed the contractual and legal aspects and probable solutions.
RFID in Construction Industry: Study of RFID technology in construction industry. Studied pros and cons of usage of RFID in construction industry. Compared RFID technology with bar coding.
Adaptive Reuse: Analyzed the technical and methodological considerations of adaptive reuse. Analyzed its relationship with sustainability.
MSP: Worked on MS Project in house and church projects in scheduling in CPM. Resource allocation in Microsoft Project. Scheduled the activities. Calculated the durations of the project. We have calculated the Critical Path Method of the project.
Rural Haiti Development Plan and Plan Guidelines: Working Document produced as a team exercise utilizing concepts of sustainability and CII reference materials.
Real Estate Development: Worked on developing project in North Main Street in Greenville. Prepared the cost estimate and feasibility of the project.
EXTRA-CURRICULAR ACTIVITIES
• Presented a paper titled “Low Cost Masonry Cement by using Fly Ash as admixture” at Nirmitte, a National Level technical paper presentation contest at MIT, Pune, Maharashtra, India.
• Participated in State level Shepherd talent search examination and placed in A level (2000).