Post Job Free
Sign in

3D/2D Piping Designer

Location:
randburg south africa
Salary:
R380 per hour
Posted:
September 14, 2012

Contact this candidate

Resume:

CURRICULUM VITAE OF KIM LANGE

PERSONELL DETAILS

Surname: Lange

First Name: Kim

Date of Birth: 17/01/1960

I.D. No. 600**********

Nationality: South African

Home Language: English

Material Status: Separated

Dependants: 2

Residential Address: 46 Catalina Close, Kelly Street

Bromhof

Randburg,

South Africa

Postal Address: P.O. Box 982

Sundowner

2161

Contact No. 082-*******

Email: ********@****.**.**

EDUCATION

School: Edenvale High

Highest Grade: Std 8

College: Belgravia Business College

Highest Grade: Matric

Highest Qualification: Matric

HOBBIES / SPORT

Art, computer technology, creative design

EXPERIENCE / SKILLS

In House Training at Gencor 1983, Trained by a Professional Engineer in Technical Drawings

Worked on a drawing board for several years

Ultimate Cadd

AutoCAD 2010

Auto Plant (Intelligent P & I.D Design Package)

Proficiency in Cadworx Plant 2009

Proficiency in Isogen and Iso Extraction

Proficiency in Microstation (V8.5)

Proficiency in Microstation Plant Space Design Series

Proficiency in Microstation Plant space P & I.D

Proficiency in Bently Iso Extractor Manager

Proficiency in Autoplant 3D Piping Design Package

11 years AutoCAD experience

14 years Microstation experience

DMS

Microstation Support

Computer literate

Smartplant

Course in PDS

Elsys (Intelligent Electrical Design Package)

Pisys (Intelligent P&ID Design Package)

Course in Fundamentals of Project Management

Course in Auto Plant P & I.D

Course in Plant Space P&I.D (Intelligent Design Package)

Course in Spec Maker

Course in Plant Space design Series

EMPLOYMENT

CONTRACTING

DRA Minerals

(Janurary 2011 – September 2012) Reason for leaving – contract ended

Piping Designer

3D Piping Designer,

Modeling of Piping Layouts utilizing Autoplant 3D Design Series and Isogen, with Autocad 2011 package,

BOM Reports, running Isometrics. General Arrangement”s

Worked on Kibali, Konkola and Booysendal Projects.

Aqua Engineering

April 2010 – (December 2010) Reason for leaving Project was coming to an end and got offered a better contract.

Piping Designer

3D Piping Designer, Modeling of plant, running Isometrics and BOM from Cadworx Design Series, and General Arrangement Layouts. Layout of Mechanical, Civil and Structural steel supports, as it was a smaller company and we had to do all disciplines. Worked on the Medupi Project.

VWS Engineering

(February 2010 – April 2010) Reason for Leaving – Offered a longer term contract

Piping Designer

3D Piping Designer, modeling of plant, running Isometrics and BOM from Cadworx Design Series, and General Arrangement Layouts. Worked on the Ambitovi Project (Madagascar) .

EP&C

(April 2008 – September 2009) Reason for Leaving: Retrenched due to lack of Projects

Piping Designer

3D Piping Designer, 3D Modeling Design and General Arrangements, Isogen extractions. Worked on the Kayelekera Uranium Mine project and the Kouilou Potash Project. Packages worked on Autocad 2009, Cadworx 2009 and Isogen.

M.T.O estimate of Kouilou Plant. Longitudinal sections of pipe line, road and bridge crossings, general arrangements of mechanical, piping layouts, and Isometric extractions.

HATCH

(August 2005 – April 2008) Reason for Leaving: Project was coming to an end, received a job offer that was more stable

Technologist/Piping Designer (PDG Piping Dept.)

3D Plant Space Design Series Modelling V8.1; Modelling, General Piping Design.

Iso-Extractor

Plant Space intelligent P & I D’S

Autoplant intelligent P & ID’s

AutoCAD 2005, Microstation V8.5,

Projects worked on - Impala Platinum Ambatovy Refinery Feasibility study, Highveld Steel, Impala Platinum Retrofit, Katanga,Tati and General Projects.

FLUOR DANIEL (South Africa) )

(Oct 2002 - August 2005 ) Reason for Leaving: Running out of work, received a better job opportunity

Cad Designer II (Piping, Process, Instrumentation)

Mainly Flow Diagrams – P&ID’s, Mfd’s, Pfd’s, Isometrics

Worked on Site Layouts,

Worked with Microstation J (V7) and AutoCAD 2000, P&ID’s MFD’s, PFD’s. Used Excel to produce line lists.

Used Microsoft Access Database to control Isometric Progress and ran reports of Projects.

Completed a PDS & Smartplant course.

Worked with Visual Basic to do basic Diagrams.

ANGLO AMERICAN

(April 97 – October 2002) ) Reason for Leaving: Design Office was closing down, Project was shelved

Cadd Drafts lady (Electrical)

Worked on Microstation 95 / J, & AutoCAD 14 / 2000, mainly Microstation.

Cable Racking & Routing, Lighting & Small Power Layouts; Schematic Diagrams; Marshalling & Single Line Diagrams, Site Layouts, Mechanical Layouts & General Layouts of Drawings.

Worked with Elsys Design Systems, using Foxpro Database.

Worked with Visual Basic to do reports & queries; Cable Schedules using Excel; Used Microsoft Outlook to correspond with clients.

Assisted Colleagues with Microstation, Excel & Visual Database; Worked with the DMS System.

ESKOM (SIMMERPAN)

(December 96 – March 97) ) Reason for Leaving: Long Distance, better job opportunity

Cad Draftslady (Electrical/Instrument Telecommunications)

Worked with Microstation 95

Layouts of Telecommunications of the Power Stations & general Electrical & Instrumentation drawings.

ESKOM (MEGGAWATT PARK)

(February 94 – December 97) ) Reason for Leaving: Politics and project coming to an end.

Cad Draftslady (Electrical/Mechanical)

Worked with Microstation version 4

Electrical: System Schematic Diagrams, Relay Circuits, A/C D/C key Diagrams

Mechanical General Mechanical Layouts, P & I D Diagrams, worked on the Hydro Pump Storage & Gas Turbine Stations, Layout of Conveyors.

BABCOCK )

(October –December 93) ) Reason for Leaving: Part time assignment.

Cadd & Drawing Board Draftslady (Electrical, Instrumentation & Piping)

Electrical Schematic Diagrams, Single Line Diagrams & Marshalling Diagrams

Instrumentation/Piping Process & Piping Flow Diagrams

Piping Isometric Layouts, Worked from various drawings to gather information to create the Isometric layouts.

WATSON & EDWARDS INCORPORATED

(February 92 – September 92) ) Reason for Leaving: Project coming to a closure, received another job offer

Cadd & Drawing board Draftslady (Electrical, Instrumentation, Mechanical & Architectural)

Mainly worked on Projects for Office Blocks, Shopping Complexes, Hotels, Recreation Centers, Schools & Retirement Villages. Mechanical & Electrical Installation of Ducting and the Ventilation System, Power & Lighting Layouts, General Architectural Layouts.

EHL CONSULTING ENGINEERS

(August 91 – December 91) ) Reason for Leaving: Project coming to a closure, Received another job offer

Drawing Board Draftslady (Electrical)

Worked directly with an Electrical Engineer, drawing Cable Routing & Racking Layouts, Lighting & Small Power Layouts & Schematic Diagrams, mainly worked from rough sketches.

NORDBURG

(June 91 – 93 & Partime until 1999) ) Reason for Leaving: part time assignment

Drawing Board Draftslady (Electrical, Mechanical, Instrumentation)

Flow Diagrams, Schematic Diagrams, single Line Diagrams, Marshalling Diagrams, Mechanical Layouts & General drawing work.

P.T.I COMMUNICATIONS

(April 91 – July 91) Reason for Leaving: part time assignment

Cadd/Drawing Board Draftslady (Electronics/Mechanical)

Drawing PC Boards, circuit Diagrams, Isometric 3D Drawings, Mechanical & Electrical Layouts.

IMPALA PLATINUM REFINERIES (SPRINGS)

(March 90 – March 91) Reason for Leaving: striking at mines, which had an effect of the design office

Cadd/Drawing Board Draftslady (Electrical P&ID Layouts)

Drawings of Electrical Maintenance Substations & Equipment.

Schematic Diagrams on Cadd / Drawing Board. Layouts of Reticulation, Drawing from sketches, positioned & sketched Emergency Lighting Layouts

Worked with Dbase III, Flow Charts, using Harverd Graphics & First Choice, worked with the NC Rotring Scriber.

Worked on P&ID’s and Flow sheets.

EHL CONSULTING ENGINEERS

(October 89 – March 90) Reason for Leaving: part time assignment

Drawing Board Draftslady (Electrical)

Worked directly with an Electrical Engineer, drawing Cable Routing & Racking Layouts, Lighting & Small Power Layouts & Schematic Diagrams, mainly worked from rough sketches

GENCOR

(December 86 – December 88) Reason for Leaving: Pregnant

Drawing Board Draftslady (Instrumentation, Piping & Electrical)

Piping & Instrumentation Flow Diagrams produced from A3 sketches, gathered information with types of valves & sizes.

Layouts of Cable Racking & Routing, Lighting & Small Power Layouts, Schematic & Single Line Diagrams.

TITACO

(January 86 June 86) Reason for Leaving: Received better job opportunity

Draftslady/Admin

Drawing of Flow Diagrams and assisted the Project Manager in Admin work.

GENCOR

(December 83 – January 86) Reason for Leaving: Pursue further into my career

Draftslady/Admin

In house Training

Trained by a Professional Engineer in drawing of Mechanical, Structural, Civil & Piping Drawings. Assisted the Section Leader in General Admin & assisted him in Tenders.

PERMANENT

NEDBANK LTD

(May 80 – February 83) Reason for Leaving: Pregnant

Computer Controller

Registration of Shares & Dividends, dealt with the Brokers at the Stock Exchange.

COMPUTICKET LTD

(April79 – April 80) Reason for Leaving: Better job opportunity

Computer Operator

Data Captured & Enquiries.

METAL INDUSTRIES

(June 78 – December 88) Reason for Leaving: Accident

Secretary

Typing, Shorthand, Accounts, Filing, Answering the phone & taking messages for 2 Managers.

Arranging Meetings & General Admin Work.

Assisted the Manager of the Department.



Contact this candidate