Pulled in temporary service cable for powering terminated wires for transformer. Responsible for job trailers – power services and terminating.Helped install control panels for new machines for dialysis filter plant. Pulled power in and terminated wires to panel and machines. Ran cable tray 6” to 36” for machines.Helped with removing old sub-station. Pulled in new wire to new sub-station.
Responsible for putting up 24” cable tray and pulling wire to power the machines.
Installed control panels. Terminated wires.