Resume

Sign in

Project Manager

Location:
United States
Posted:
July 01, 2016

Contact this candidate

Resume:

Rodney C. Reid Sr.

*** ********* *****, *******, ***** Carolina 29657

Home: 864-***-**** / Cellular 864-***-****

E-mail: mi7yu1@r.postjobfree.com

Objective

Seeking a challenging position that offers the opportunity to utilize my Project Management and Engineering skill sets and experience along with my business education to assist an organization in meeting its goals and objectives.

Profile:

• Background encompasses extensive professional experience in the following key positions of responsibility: Process Engineer, Project Engineer, Predictive Maintenance Engineer, and Senior Software Consultant

• Strengths: Proven technical experience; proven management experience in non-union environment; proven change agent; highly responsible; dependable; team player; mentor to junior management. Multi-cultural experience and International Business experience allows me to work effectively with people from diverse backgrounds at all levels within an organization.

• Computer experience: Microsoft Office, MS Project, CATIA, AutoCAD, Visio, SAP, RobCad, MINITAB, and Quickbooks.

Selected Accomplishments:

Datran US:

• Used Lean Sigma methodology (DMAIC) as problem resolution tool to identify rootcause of contamination in paint layers, presented findings to plant manager, and began implementing corrective actions.

• Performed PFMEA on hydrographics tank in effort to reduce defects and achieve a higher first run past rate.

• Developed downtime logs for each department and complied information into a detailed spreadsheet, presented information to department heads, and rootcauses were determined and corrective actions put in place.

• Implemented 5S in maintenance shop and production areas.

• Accepted additional responsibility of managing production preparation and assembly departments.

BMW Manufacturing Corporation:

• Managed installation of automated color measurement cell, that included three different technologies on one robot, and conveyor integration. Developed programs to check for correct color match, for correct film thickness and for overall appearance of painted surface. Provided necessary training and guidance to facilitate

successful on the job training for involved associates. Developed work instructions and safety procedures.

• Developed and implemented a plan to reduce cleaning cost for the pretreatment vehicle carrier system for a cost savings of 75,000 per year.

• Performed detailed risk analysis on suppliers for potential product change over. Developed matrices, analyzed production capacities and capabilities, logistic concerns and environmental regulations to assist Senior Management in the decision making process.

• Developed and implemented a plan to reduce material, parts, waste and associate costs involving cross functional production processes for a savings of $300,000 per year.

DataStream Systems Inc:

• Accepted a project with status of being over budget and behind schedule and led a team comprised of Specialists and Consultants to completion with minimal loss and within specified time period designated by upper management.

WestPoint Stevens:

• Managed installation of a $500,000 finishing dye dispensing and a $600,000

print color dispensing systems.

• Assisted Plant Engineer with design and installation of a $1.2 million cloth finishing machine and a $500,000 dye dispensing system.

• Planned and developed a predictive maintenance program and audit program which aided in meeting corporate goal of reducing and keeping down time to 2% or less.

• Increased plant through put by implementing TPM principles and improving equipment availability.

• Managed development and construction of dye delivery and mixing center. Project included all piping, pumping systems, electrical and area preparation tasks. Completed on time and with in budget constraints given.

Professional Experience:

Datran US, Piedmont, South Carolina 2009 to 2009

Process Engineer (Facilities)

• Managed maintenance group, robot programmers, robot operators, assembly associates and grounds maintenance crew.

• Coordinated critical systems preventative maintenance.

• Implemented 5S methodology in maintenance shop.

• Prepared all process sheets, maintenance schedules, and cleaning schedules.

• Arranged for part testing and assisted with production tooling and fixtures.

• Coordinated with various suppliers and vendors and began scheduling repair efforts and modifications for equipment and production areas.

BMW Manufacturing, Greer, South Carolina 1999 to 2008

Process Engineer Specialist (2000 to 2008)

• Managed projects ensuring compliance with plans and specifications.

• Prepared cost center budget and monitored all activities involving cost center to ensure all GL accounts were being charged correctly and year-end requirements were met.

• Developed and implemented production processes and improvements that affected quality, throughput, and capacity.

• Communicated status of new projects on departmental and plant levels.

• Encouraged employees to make suggestions to improve production processes by leading and/or participating in Kaizen events, listened to suggestions, and promoted two-way open communications among employees, co-workers, peers and management.

• Worked with other departments to resolve quality issues using different problem solving methodologies.

• Supported New Model planning and launch for Product Engineering.

• Supported optimization of paint application pertaining to paint layers to achieve color and appearance for all new models prior to Start-Of-Production (SOP).

• Generated daily/weekly progress reports and presented results to management team.

• Designed, analyzed and reversed engineer fixtures (metal and plastic) using CATIA V5 and AutoCad design software.

• Conducted test, monitored, and analyzed oven data information using Datapaq Oven software to ensure ovens operate within specified parameters.

• Performed paint process capability computer simulations using eM-Power (Robcad).

Production Associate (1999 to 2000)

• Responsible for outer surface vehicle quality.

• Programmed automation to correct defects and to ensure paint layer thicknesses were within specification.

• Assisted Equipment Services with preventative maintenance task during shutdowns, weekends and early production termination.

DataStream Systems Inc, Greenville, SC 1997 to 1999

Senior Consultant

• Provided end-user training and consulting services to organizations migrating from a manual to a computerized maintenance management.

• Supported Marketing group with pre-sales technical consulting efforts.

• Analyzed customer systems and department daily operating functions and determined paths to be taken to ensure customer needs are meet through software functionality.

• Performed network installation and peer-to-peer installations of software.

• Instructed customers on procedures used to operate Access, Oracle and Paradox maintenance management software to exceed customer’s expectations.

• Provided end-user training and consulting services to organizations migrating from a manual to a computerized maintenance management.

• Performed Level I systems administration support.

• Provided support for all add-on products.

WestPoint Stevens Inc, Clemson, SC 1990 to 1997

Predictive Maintenance Engineer (Facilities)

• Coordinated critical systems preventative maintenance.

• Provided on-site management and quality control to ensure capital projects met time and budget requirements, and built in accordance to contract documents.

• Coordinated and scheduled subcontractors and suppliers.

• Upgraded hardware and installed software on workstations and used troubling shooting skills to repair workstations.

• Responsible for drawings creations and updating (AutoCAD).

Thomas & Hutton Engineers, Mt. Pleasant, SC 1987 to 1990

Engineer Technician

• Assisted engineers in drafting and designing functions. Specifically designed wetland permits, sew layouts and road layouts, and mortgage plats.

• Responsible for drawings development and detailing from conception stage through final stage (board and AutoCAD).

• Performed cost estimates/take-offs, site inspections and water table testing.

Education:

Webster University School of Management Greenville, South Carolina

Master in Business Administration (MBA) GPA 3.4/4.0

Concentration in Business

S.C. State University Orangeburg, South Carolina

Bachelor of Science in Mechanical Engineering Technology GPA 2.9/4.0

Universal Accounting

Professional Accounting and Bookkeeping (2006)

Clemson University Clemson, South Carolina

Engineering, math and business courses (1992-1993)



Contact this candidate