Resume

Sign in

Project Manager

Location:
Ontario, California, 91761, United States
Salary:
$75 per hour
Posted:
March 07, 2011

Contact this candidate

CYRIL DELOS REYES AVILA

**** ****** **.,

Mesquite, TX 75149, USA

House Phone: +1(424) ***-****

Mobile No: +1(954) ***-****

E-mail: kslfi0@r.postjobfree.com

CAREER OBJECTIVE:

Extensive experience in international and domestic field of Telecommunications, Engineering, Project Management, design and planning of wind turbine including submarine electrical and optical fibre cables. Willing to travel and be relocated.

CORE COMPETENCIES:

Strategic Planning, Project Leadership, Budget Planning & Cost Control, Client Relations, Design and Engineering, Proposal Development, Project Implementation

SUMMARY:

Telecoms Project Management/Implementation 21 years

• Design and implementation of Microwave towers and equipment

• Submarine, Aerial, underground fiber & copper design and implementation

• Ericsson RF UMTS and LTE cabinet equipment installation and integration

• Design and installation of Cell Site Power Supply Equipment

Civil, Electrical & Mechanical Engineering works 5 years

• Structural & access road design and project implementation of telecoms facilities

• Electrical and standby power design and implementation

• ACU design requirements and implementation

PROFESSIONAL EXPERIENCE:

Glass & Wire Communications, LLC 16Nov10 - Present

801 Hammond St., Suite 350, Coppell, TX 75019

LTE/UMTS Telecom Engineer

Handles UMTS 850 RBS 3206, 4th Carrier Delivery, Installation & Integration Project for AT&T South California up to Ventura. Jan 2011 - present

Handles LTE and UMTS project of Verizon from site preparation, cabinet installations, integrations, troubleshooting, VSWR test, PIM/Sweep and Commissioning of Ericsson LTE RBS 6101, 6102 & 6201 series South California and San Diego, CA market.

Handles T-Mobile project in adding RX & TX Cards for Ericsson RBS, 2206, 3106 & 3206 series, South Los Angeles, CA Market.

Planning and design, Site Acquisition and preparation of Metro PCS LTE turn-key projects central USA.

Cell site power supply equipment installation and design.

Dynamic Temporaries, 05Jan09 – 15Nov10

1513 Viceroy Drive, Dallas, Texas, USA

Telecom Engineer

Plan and execute client telecom projects, i.e., outside plant design and installation of GSM, UMTS, & LTE (4G Wireless – Ericsson RBS series) equipment.

Handles structured cabling and electrical works including computer hardware and software repair and maintenance.

Cell site power supply equipment and design

Project/s Handled:

1. Site preparation, RBS eNode B cabinet installation, troubleshoots/install Alcatel-Lucent 7705 SAR (LTE router), vswr troubleshooting, Integration & commissioning for Verizon LTE (Ericsson RBS eNode B 6101, 6102/6201 Series) Project - California, April 2010 - present.

2. Conduct PIM (Rosenberger Analyzer) & Sweep (Anritsu S331D) test for Verizon LTE RF mainlines and antennae - California, April – July, 2010.

3. Outside Plant survey and AutoCAD drawings for Standard Charter – Riverside, Norco, Rancho Cucamonga, & Mira Loma – June 2010

4. Optical fiber and UMTS Installation and integration of AT&T and T-Mobile UMTS project – California, June 2010

5. Cabinet installation and preparation for AT&T (Ericsson RRU22-0840 & 1940) Project - Oklahoma, November 2009.

6. Outside Plant survey and AutoCAD drawings for KDL Telecom project – Seagoville, Palestine, Jacksonville, Athens, Nacogdoches, Woodville all in Texas, August 2009.

Ericsson, Global City, Taguig, Metro Manila, Philippines Feb – Dec 2008

Shore-End Project Manager

Directly reporting to the Project Director, responsible in project design, status and reporting, project estimates and direct cost, and meeting with the client.

Design of Telecoms submarine Fiber Optic cable including its shore-end facilities.

Supervise and implement shore-end projects including underground and aerial outside plant cables.

Also handles Microwave Projects: Identification of Communications Requirements, Selection System Type, Site Selection and Route Design, Preliminary Path Profiling, Field Path Surveys, Final Path Profiling, Path Propagation & Performance Analysis, RF interference, etc.

Project/s Handled:

1. Design & implementation of Globe Telecoms Optical Fibre Submarine Cable Project FOBN2.

2. Design & implementation of Globe Telecoms Optical Fibre underground network.

3. Installation of Digitel Telecoms RRU22 & RBS 3106, 3206 & 2106 series in Luzon Project.

UPC Renewables, Makati City, Metro Manila, Philippines 2007 – Feb 2008

Associate Director

Directly reporting to the President, forecasting of wind resources and wind farm dispatch including win turbines reliabilities including installation of temporary tower infrastructure.

Implementation of advanced controller for enhanced power production.

Handles the experimental investigation of multi mega watt scale wind turbines, aerodynamics, production, noise and loads under severe wind conditions.

Designed the proposed submarine cable link between the island of Taiwan and Itbayat, Philippines.

Telecoms Infrastructure Corp. of the Philippines, Quezon City, Phil. 1997 – 2007

Maintenance Manager

Report directly to the President and held full profit, loss accountabilities, and other related issues.

Directed and managed the design and implementation of the company’s telecom projects under the microwave tower, fiber optic aerial and underground including the submarine fiber optics cable.

Oversaw the maintenance of the company’s overall nationwide telecom backbone infrastructures.

Bayan Telecommunications, Quezon City, Philippines 1994 – 1997

Operations Manager

Handles the overall design, implementation and supervision of all telecoms network backbone infrastructure of the company,

Manage all types of civil work infrastructures, power and generating units, access road, communication towers, aerial, outside plant and underground cabling facilities.

Responsible for microwave backhaul network design and engineering, working at communication sites/towers to validate and maintain dish alignment, installation quality, and support optimization.

Department of Transportation & Communications, Ortigas, Pasig, Phil. 1984 – 1994

Senior Development Officer

EDUCATION AND PROFESSIONAL QUALIFICATION:

Highest Academic Qualification : Bachelor of Science Degree

Management in Telecommunications

1992 – 1993, Carl Duisberg Gesellschaft, Federal Republic of Germany

Bachelor of Science in Electrical Engineering

1985 – 1987, Far Eastern University, Morayta, Manila, Philippines

Bachelor of Science in Civil Engineering

1979 – 1984, Far Eastern University, Morayta, Manila, Philippines

Civil Engineer, Electrical, Telecommunications Management

Professional Qualification and Certification:

SEMINARS AND PRACTICAL TRAINING:

Local Trainings and Seminars

Philippine Energy Summit – SMX Convention Center, SM Mall of Asia Bay Central

January 29 to 31 & February 5, 2008

Advance Visual Basic (ver. 6) – Genetics Computer Institute, LG Unit 3 Seneca Plaza Building, E. Rodriguez Sr. Avenue, New Manila, Quezon City, Metro Manila

June 16 to July 28, 2001

Optical Fiber Network Engineering – Fujikura Ltd., NTDP Project, Makati, Metro Manila

Jan 12 to 16, 1998

Optical Fiber Cable Engineering – Fujikura/Fujitsu Ltd., Bayantel, Pasig, Metro Manila

March 01 to 15, 1995

Effective Visual Design and Presentation – SGV/DDI (Development Dimensions International, Inc.), Pasig City, Metro Manila. April 01 to 03, 1992

Training Course in Telecommunications Policy – Development Academy of the Philippines, Pasig City, Metro Manila. February 24 to 28, 1992

Computer Systems Standard Operating Procedures, Local and Wide Area Network – Canadian International Development Agency (CIDA), Pasig City, Metro Manila.

February 11 to 17, 1992

Team Improvement and Strategic Planning Program – Development Academy of the Philippines, Pasig City, Metro Manila. February 01 to 08, 1992

Database Training Workshop – Teleconsult, Pasig City, Metro Manila. January 20 to 24, 1992

Cellular Planning Course – International Telecommunications Union conducted at Department of Transportation & Communications (DOTC). April 01 to 17, 1991

Value Added Services in Telecom Network – United Nation Development Program, Roxas Blvd., Manila. June 11 to 22, 1990

Optical Fiber Communications – Telecom Training Institute, Karuhatan, Valenzuela, Metro Manila. June 11 to 22, 1990

GOP Requirements on Project Implementation – Development Academy of the Philippines, Pasig City, Metro Manila. January 15 to 19, 1990

Outside Plant Engineering – Telecom Training Institute, Karuhatan, Valenzuela, Metro Manila

October 12 to December 18, 1987

Basic Computer Course – Telecom Training Institute, Karuhatan, Valenzuela, Metro Manila. April 27 to May 15, 1987

DataBus/DataShare Programming – Telecoms Office, A. Roxas Avenue, Quezon City, Metro Manila. May 02 to 28, 1985

EDP Fundamentals - Telecoms Office, A. Roxas Avenue, Quezon City, Metro Manila.

April 16 to 26, 1985

Foreign Trainings, Seminars and Visits

Integration and commissioning of Ericsson LTE (4G) RBS eNode B 6201 Equipment – Exi-Pasons, California, Aug 12 to 13, 2010

ECI Factory Acceptance XDM Optical Network, NDTN Expansion 2 Project – ECI Telecom Ltd., Tel-Aviv, Israel. October 20 to 26, 2006

FRX-4G and FLX/OPX-15600, 2500 Equipment Enhancement Program – Fujitsu International, Kawasaki, Japan. September 01 to October 31, 1997

FRX/FLX Factory Acceptance, NDTN Project - Fujitsu International, Oyama and Nasu, Japan. August 25 to 31, 1997

Collapsible Structures for Telecom Applications, Factory Inspection – Cell Site Products Corp. Florida, USA. May 01 to 15, 1996

Rectifier Factory Acceptance Test, SDH Bayantel Project – Loraine Products, Chicago, USA. May 16 to 31, 1996

Telecom Software Development – United Nation Development Program/ITU, Islamabad, Pakistan. July 07 to 15, 1992

Disaster Emergency Communications – Teleconsult of Canada Inc., Vancouver, Canada. May 20 to 308, 1992

Disaster Communications Management – US Telecom Training Institute, Washington D.C., USA, May 06 to 18, 1992

JISCOS Digital Switching Course – Jeumont Schneider Telecommunications, JST Training Center, Champagne-sur-Siene, France. September 03 to October 23, 1990

Network Planning and Outside Plant Engineering – Nippon Telephone and Telegraph International (NTT), Tokyo, Japan. February 28 to March 28, 1989



Contact this candidate