FRANK A. PRIOR
**** ********** ***** ~ Kingman, Arizona 86409
928-***-**** *****.*****@*****.***
QUALITY ASSURANCE INSPECTOR
Project Management ~ Quality Audits ~ Continuous Improvement
Over 25 years of experience in the evaluation of fossil fuel boilers, nuclear power plant piping and associated systems in accordance with multifaceted standards and then recommending cost-effective corrective actions or improvements. More than 20 years of journeyman welding experience and AMSE B & PV codes. Highly organized with an ability to manage multiple projects, tasks and priorities effectively and in a timely manner. Superior communicator, easily interacts with executives, regulatory agencies, clients, vendors and staff. Core competencies:
• Customer Communications • Standards Compliance • Risk Assessments
• Strong Work Ethic • MS Office • Detail Oriented
• Innovative Problem Solver • Field Service & Support • Blueprint Reading
CERTIFICATIONS
Certified Welding Inspector, American Welding Society – QCI (#02090131)
High Pressure Welder, American Society of Mechanical Engineers/American Welding Society
HIGHLIGHTS
Expert with various codes including ASME B31.1, AWS D1.1, API 1104, API 650 and 653.
Successfully and safely performed demanding in-process inspections of welds on piping, boiler tubes and structural steel.
Served as the Welding Supervisor in charge of Project Management for many short- and long-term assignments, including all aspects of budgeting and scheduling.
Designed innovative curriculum for the training and eventual certification of apprentice welders in classroom, shop and field environments.
Well trained in all aspects of industrial safety and safe work practices.
Excels at proactively identifying errors and recommending immediate, practical and cost-effective solutions on site.
PROFESSIONAL EXPERIENCE
TRANSALTA, Centralia, Washington 4/2009-6/2009
Chief Quality Assurance Inspector
• Oversee two major contractors’ QA departments in the execution of a large-scale boiler overhaul.
• Review all documentation and MTR’s on the replacement and expansion of the economize in a 750MW boiler, Water Wall tube replacement and SH Platen dissimilar metal welds.
• Verify all WPS, WQR and field weld data sheets to ensure compliance with owner specifications.
Continued …
FRANK A. PRIOR Page Two
PROFESSIONAL EXPERIENCE
(continued)
KINDER-MORGAN PIPELINE, INC. Carson, California
Mechanical and Welding Inspector 1/2009 – 3/2009
• Performed inspections of all welds and mechanical installations on a storage tank project.
IRWIN INDUSTRIES, INC. Long Beach, California 9/200810/2008
LEAD Certified Weld Inspector
• Lead CWI on the successful replacement of the outlet Secondary Superheater Header, Front and Rear Water Wall Headers, and miscellaneous boiler repairs including the bottom ash hopper.
• Assessed project requirements to ensure strict compliance with client specifications.
HARDER MECHANICAL CONTRACTORS, INC., Milwaukee, Oregon 6/2008 – 9/2008
QC Certified Weld Inspector
• Performed in-process inspection on a Hydro-cracker expansion project for Conoco-Phillips.
• Compiled and ensured the accuracy of turnover packages for the new construction of a Solar Grade Silicon Plant in Moses Lake, Washington.
WOOD GROUP POWER SOLUTIONS, INC., Tulsa, Oklahoma 12/2007 – 5/2008
Lead QA / QC, Certified Weld Inspector
• Flawlessly managed QA/QC activities on the construction of two LM-6000 and Balance of Plant installation.
• Assessed project requirements to ensure compliance with client specifications.
• Responsible for mechanical and weld inspections during the commissioning of a new power plant in Northwest Arizona.
.
WOOD GROUP HIT SERVICES, Houston, Texas 4/2007 – 11/2007
Certified Weld Inspector
• Served on the construction of a GE gas turbine power plant; wrote Welding Procedure Specifications and Procedure Qualification Record.
• Oversaw the qualification of Welders and Weld Operators, including contract Welders.
• Organized and performed field investigations and assessments.
• Ensured readiness and proper calibration of field equipment and instrumentation.
• Developed the organization’s Quality Control Manual and R-stamp application.
SOUTHERN CALIF. EDISON CO. Rosemead, California 1980 – 2006
High Pressure Welder Mohave Generation Station (1980 – 2006)
• Worked on forced and planned outages, including coordination with other crafts to insure a safe, timely and cost-effective work program.
• Supervised up to 50 diverse technicians with an emphasis on training, positive motivation and active listening.
• Performed planner duties for day-to-day activities, including such major projects as the replacement of the rear reheat tube assemblies on unit #2 and installation of the flue gas conditioning system