Resume

Sign in

Engineer Training

Location:
United States
Posted:
March 23, 2011

Contact this candidate

M.FAROOQ ZUBAIR

H # ** / H-* Phase -* Wapda Town Lahore Pakistan,

Cell Kurdistan: +964-750-*******

Cell Pakistan: +92-300-*******, +92-300-*******

Email: k4odsl@r.postjobfree.com,k4odsl@r.postjobfree.com

EDUCATION

1995- 1997 SSC, Wapda High School, Tarbela Dam Project.

73 % ( A Grade )

1997 – 1999 FSC, Wapda Degree College, Tarbela Dam Project.

78% ( A Grade )

Jan 2001 - Nov 2004 BSc. Petroleum and Gas Engineering, UET, Lahore.

Year Ist Year 3rd Term 4th Term 5th Term 6th Term 7th Term 8th Term

Total Marks 1250 625 625 625 625 550 700

Marks Attained 835 397 451 437 438 432 524

Marks (%) 66.8 63.5 72.16 69.92 70.08 78.5 75

Overall Percentage: 72%

PROFESSIONAL/COMPUTER SKILLS

Tube Move Analysis Software

MS OFFICE

INTERNET BROWSING AND SURFING

PRACTICAL EXPERIENCE

Currently working as Service Tools & CHC Team Leader in Eastern Oilfield Solution Erbil Kurdistan Branch and looking after for Business Development, Tech Sales, Operational activity Ordering of Tools and Maintaining the inventories for Erbil Branch.

Design the Mechanical Solution for OMV Erbil Branch by providing them the 20” & 16” Compression set Packers to run with velocity string of Underbalanced Drilling (UBD).

Performed the 4-1/2” Permanent Bridge Plug (PBP) job with Wire Line at MOL well,

Bijell-1.

Performed the 4-1/2” Permanent Bridge Plug (PBP) job with Hydraulic Setting Tool (HST)

at MOL well, Bijell-1.

Performed the 7” Permanent Bridge Plug (PBP) jobs with Mechanical Setting Tool (MST)

at Heritage well, Miran West-2.

Performed the 7” Permanent Bridge Plug (PBP) jobs with Wire Line at Heritage well, Miran

West-2.

Performed the 9-5/8” Permanent Bridge Plug (PBP) jobs with Wire Line at Heritage well,

Miran West-2.

Worked as OPERATIONS SUPERVISOR in WEATHERFORD COMPLETION & PRODUCTION SYSTEMS, since 1st of April 2008 to 30th of Aug-2010 and looked after for Business Development, Tech Sales and Operational activity for Pakistan Branch.

Worked as FIELD SERVICE ENGINEER in WEATHERFORD COMPLETION & PRODUCTION SYSTEMS, since 1st of February 2007-31st of March 2008.

Performed the 4-1/2” Permanent Bridge Plug (PBP) jobs with Wire Line at OMV well,

SAWAN-11.

Performed the 5” Permanent Bridge Plug (PBP) jobs with Wire Line at DEWAN

PETROLEUM wells DEWAN-5A & DEWAN-2.

Performed the 6-5/8” Permanent Bridge Plug (PBP) jobs with Wire Line at DEWAN

PETROLEUM well DEWAN-2.

Performed the 7” Permanent Bridge Plug (PBP) jobs with Wire Line at OPI well SAKHI

SARWAR-1, OMV well LATIF-1, PETRONAS well SAQIB 1-X.

Performed the 9-5/8” Permanent Bridge Plug (PBP) job with Wire Line at OMV well

DINANSHAH-1.

Performed the 9-5/8” Permanent Bridge Plug (PBP) jobs with Hydraulic Setting Tool (HST)

at DPL well Dewan-3.

Performed the 7”Composite Bridge Plug (CBP) jobs with Wire Line at DEWAN PETROLEUM wells ABN-1, Dewan-3.

Performed the 7” & 9-5/8”Permanent Cement Retainer (PCR) jobs with Mechanical Setting Tool (MST) at CRESCENT Petroleum DUBAI, Well K-2ST3 & OGDCL wells (BOBI-3, DHODAK DEEP-1, Kal-3) and OPI well SAKHI SARWAR-1.

Performed the 9-5/8”Permanent Cement Retainer (PCR) jobs with Wire Line and squeeze the Cement using SSA (Snap out Seal Assembly) at, OGDCL well, DHODAK DEEP-1.

Performed the 7”Permanent Bridge Plug (PBP) jobs with Mechanical Setting Tool (MST) at PETRONAS well REHMAT-3 and 9-5/8” PBP job at POL well Azim-1.

Performed the DLT Packer c/w V111 UNLOADER jobs at PETRONAS well REHMAT-3 & OGDCL wells (BOBI-3, DHODAK DEEP-1, and QADIRPUR-33) and Dewan Petroleum Well (Dewan Shallow-1).

Performed the Completion jabs at POL well PINDORI-5A, DHULIAN-43, OGDCL wells DAKHNI-10, PANJPIR-6, JHAL MAGSI SOUTH # 2, DAKHNI DEEP-2, Qadirpur HRL-3, HRL-4, HRL-5 & Dhodak Deep-1, MGCL well KOONJ I-A, Khoost -1, Khoost-2, OPI Well Ratana-2 and Dewan petroleum well Dewan Shallow-1.

Performed the Annulus Casing Packer (ACP) jobs at OGDCL well Qadirpur-29, Qadirpur-30.

Run the Schlumberger Completion equipment at OGDCL wells Uch 21 & 25.

Run the 5” Composite Cement Retainer at Dewan Petroleum Well Dewan 5-A.

Run the 7” X 4-1/2” Optiset Valve at ENI well K-23.

Worked as Team Leader DST at China National Logging Corporation (CNLC) Pakistan Branch, from 1st of December 2006 to 31st of January 2007 in Testing Department (SWT and DST DEPARTMENTS).

Worked as ASST ENGINEER at China National Logging Corporation (CNLC) Sudan branch, from September 2006 to November 2006 in Testing Department (SWT and DST DEPARTMENTS).

• Performed EPF job at CNPC wells Moga 31, Moga 22-1, Moga25.

• Performed Testing job (DST & SWT) at WNPOC well Mirmir-1.

Worked as ASST ENGINEER at China National Logging Corporation (CNLC) Pakistan branch, from April 2005 to August 2006 in Testing Department (SWT and DST DEPARTMENTS).

• Worked at patrons (Mehar-2 Field) as Petroleum Technician in SURFACE Testing Department and DST Department with C.N.L.C crew.

• Performed clean up job at Rehmat-1 (PCPL) with SWT crew.

Work with DST Department

• Worked on Super Safety Valve (SSV), LPR-N Tester valve, OMNI valve, SLIP Joints, RD Sampler, GAUGE Carriers (INTERNAL AND EXTERNAL), RD Safety Circulating Valve, RD Circulating Valve, Packers (RTTS, PT, Straddle), Safety joint, Drain Valve, SSV, Hydraulic Bypass, Big John Jar, Reversing tools (Impact Circulation Valve, Pump Out Circulation Valve), Hydraulic Bias, in DST DEPARTMENT.

• Maintenance, Redressing, Pressure Testing and Function Testing Of all these DST tools.

• Program and Run in EMR Gauges with DST String.

• Practical Knowledge about DST CROSSOVERS and Hand Tools.

• How to prepare the DST job (Tool String) and mobilize the Equipment to Well Site.

• Hydrostatic Calculations, Nitrogen calculations for OMNI and LPR-N Tools.

Work with SWT Department

• Worked on Flow Head, Choke Manifold, Data Header, SSV (ESD), Separator, Gauge tank, Surge tank, Piping, Hydrometer, in SURFACE WELL Testing Department.

• Rig up of Surface Well Testing (SWT).

• Calibration of Barton Recorder, Pressure and Temperature Gauges.

• How to Hook up ESD and Ignition System.

• How to change the choke and Choke operations.

• How to change the Orifice Plate and Gas calculations from Orifice.

• Practical Knowledge about SWT CROSSOVERS and Hand Tools.

• PVT Sampling for Gas and Oil.

Attended an internship program of four weeks under the professional environment provided by TULLOW PAKISTAN DEVELOPMENTS LTD.

Visits to O.G.D.C.L fields at FimKassar (experience drilling activity at rig site and the production mechanism of some other fields). .

TRAININGS CONDUCTED at CNLC (Pakistan Base)

Basics of Petroleum Engineering.

Basics of Reservoir Engineering.

Basics of Drilling Engineering.

Basics of Well Testing.

Basics of Surface Well Testing (SWT).

Basics of Drill Stem Testing (DST).

Practical Training about DST Tools to all the DST, SWT and S/L employee.

TRAININGS & COURSES

H2S Training by RUTLEDGE E&P Pte. Ltd.

HSE Training by CNLC (Pakistan Branch).

Fire Fighting Training by Haseen Habib Trading Company.

Well Bore Dynamics – Weatherford Completion Systems

WEATHERFORD SAFESTART course.

Packer 1– Weatherford Completion Systems

Packer Service Tools 1– Weatherford Completion Systems

Weatherford Online API Training (40 Courses).

First Aid Training by Pakistan Red Crescent Society.

SLICK PLUG-1- Weatherford Completion Systems.

Completion Applications- Weatherford Completion Systems.

Defensive Driving Training by Occupational Safety and Loss Prevention (OSALP).

ACHIEVEMENTS & AWARDS

Prepare Manual on Basic DST Training

Got achievement award (Employ of the Month) from CNLC on Preparing the Technical

Manual for CNLC (Pakistan Branch)

Got award of Best Bowler from UET Lahore

Got the Core behavior award from Weatherford Pakistan.

Introduced the FracGuard Composite Cement Retainer in Pakistan and performed the Successful jobs.

Introduced the Weatherford Model OptiSet Valve in Pakistan and performed the Successful jobs.

Topped Packer-1, Packer Service Tools-1 & Slick Plug-1 with Weatherford Completion

Systems.

PROJECTS

Reserves Estimation of Abnormally Pressured Reservoir using Material Balance and Simulation Technique

Well Test Analysis using “Well test 200TM” (Eclipse Module)

EXTRA-CURRICULAR ACTIVITIES

Internet surfing.

Reading poetry, novels etc.

Sports: Cricket, Badminton, and Football.

PERSONAL

Marital Status: Married Date of Birth: 15th April, 1981

Religion : Islam N.I.C # : 13301-3321072-5



Contact this candidate