Certified Comp Ex Inspector (Electrical & Instrumentation) from Intertek UK
RÉSUMÉ Samuel Jebaraj
Address: */*** *&T colony, 5th street
3rd Mile Tuticorin 628008
Tamil Nadu, India
Work: +968-********
Home: +914*********
Email: : ******@*****.***
QUALIFICATIONS
• 3 Years Electrical & Electronics Engineering, Tamilnadu,India
• Bachelor of Science in Industrial Electronics Engg
• Certified Comp Ex Inspector from Intertek UK
KEY COMPETENCIES
• More than 18 years of experience in Electrical and Instrumentation Installation, Inspection, Testing& Commissioning and Hook UP and design review.
• Installation, Inspection,Testing,Commissioning and Hook Up in Offshore Plat Form all Electrical Work
• Installation, Inspection, Testing, Commissioning in 132KV GIS Substation(Toshiba) all Electrical Work
• Installation, Inspection, Testing, Commissioning in OLNG all Electrical Work in Utility, Process and Off Plot
• Installation, Inspection, Testing, Commissioning in 132&33KV Over Head Line all Electrical Work
• Installation, Inspection in Oil&Gas Plant including Compressor(Gas Injection, Instrument Air, Gas Lift),Glycol Regeneration, all Electrical Work
• Installation Inspection Testing, Commissioning and Operation& Maintenance in Coal Handling Plant in Thermal Power Station
• Provision of inspection technique and expertise to construction supervision to aid and expedite compliance with specified quality and technical requirements
• Prepared Flaws in the Q electrical (Integrity) and involved in implementing the mitigating action in ITPS and Work procedure
• Involved in flawless start up initiative (FSI) and prepared Flaws list and mitigation plans
• Specialist skills in risk mitigation and quantitative risk assessment.(QRA)
• Direction, supervision and guidance to inspection personnel / Subordinate.
• Presently involved in QMS and internal quality audit.
• Knowledge of Ebms
• Confident leader and mentor.
• Approved BP-Azerbaijan International Operating Company E&I Inspector
• Approved Shell Petroleum Development of Oman E&I Inspector
WORK HISTORY
APR 2012 – TILL DATE
RAY INTERNATIONAL OMAN FOR THEIR PROJECTS WITH VARIOUS SITES IN PETROLEUM DEVELOPMENT OF OMAN AND OMAN LNG
COMP EX INSPECTOR
Responsibilities include:
• Carry out inspection based on IEC 60079-17
• Install the Electrical and Instrument equipment based on the IEC 60079-14
• Carry out the repairing work
• Necessary training provide for the technicians
• Maintain Ex Electrical and Instrument equipment inspection register
NOV2006 – MAR2012
HARWEEL CLUSTER PHASE II FACILITY PROJECT, PETROLEUM DEVELOPMENT OF OMAN
KAUTHER DEPLETION COMPRESSION PROJECT, PETROLEUM DEVELOPMENT OF OMAN
ELECTRICAL AND INSTRUMENT ENGINEER / QA/QC
Responsibilities include:
• Familiarization in DEP, SP’s, Shells PR and GU and Win Pcs
• Review of all documents associated with Electrical Installation including Inspection Test Plan, Method Statement, Procedure and Vendor Documents
• Preparing Flaws & mitigation action for Q Electrical and Instrument Integrity in FSI
• Conducting FSI(flawless start up initiative) Induction Programme
• Review and approval of material specification system,
• Supplier selection and Vendor management and review, Contract negotiation
• Preparation and review of data sheet for Electrical Equipments
• Participate in the clarification meetings with contractors and Vendors to ensure compliance with technical specifications & requirements
• Very good knowledge in material and equipment selection in Potentially Hazardous area Zone0.Zone1,Zone2
• Construction design review
• Planning and Scheduling
• Involving in Safety and Environmental implementation
• Test Pack Preparation
• Marking up System and Sub System
• Test report preparation
• Coordinate with other discipline engineers to solve site construction issues
• Very good knowledge in IEEE,IEC,BS
• Incoming Material Inspection, Site management and logistics
• Periodic inspection and Witnessing of all Electrical Activity, Review of all test result
• Liaise with Completions department, Senior Certification Engineer & Construction departments
NOV2004 – NOV2006
AZERI-CHIRAG-GUNASHLI OFFSHORE OIL FIELD PROJECT IN AZERBAIJAN
AZERBAIJAN INTERNATIONAL OPERATING COMPANY – BP EXPLORATION (SHAH&DENIZ)
LEAD ELECTRICAL AND INSTRUMENT INSPECTOR
Responsibilities include:
• Familiarization with the job specification and review all documentation associated with Electrical installation including Inspection & Test Plans (ITP), Procedures, Method Statements, Vendor Documentation and Maintenance and Operations Manuals
• Familiarization in Guidance of Certification(GOC) and Win Pcs
• Periodic Inspection of all Plant Electrical equipment to be installed for topsides operation
• Pre-run checking and punch-listing of equipment, system and component shortfalls
• Circuit testing preparation and witness pre-commencement power / signal checks
• Very good knowledge in Potentially Hazardous area E&I equipment Inspection Zone 0,Zone1,Zone2
• Perform inspection of all equipment during equipment pre-commissioning / commissioning/Start Up & Normal
• Prepare and review test documentation, submit results to Certification engineers
• Direction, supervision and guidance to inspection personnel during the tenure the Shah Deniz Azeri Project
• Allocation and management of inspection personnel during routine installation and testing activities
• Test Pack Preparation
• Marking up System and Sub System
• Coordination of resources and liaison with construction management and supervision to ensure adequate coverage of ongoing activities
• Provision of inspection technique and expertise to construction supervision to aid and expedite compliance with specified quality and technical requirements
• Coordination of resultant inspection records with Certification Clerks in the provision of data for entry to Quality Control System (QCS) [certification database]
• Ensure continuous accurate QC records maintenance by inspection personnel
• Liase with Completions department, Senior Certification Engineer & Construction departments to ensure seamless transfer of QC records and knowledge transfer between disciplines
• Perform inspection duties as required to verify compliance to project stipulated procedures, specifications and noted standards
• Verify test results, Provision of daily summary report, weekly report input and monthly report inputs to line manager.
APRIL 2002 TO JULY 2004
1. NORTHERN OMAN GAS PROJECT FOR OCCIDENTAL OF OMAN INC.,
2. AL SHUWEIHAT S1 POWER AND WATER PROJECT IN ABU DHABI FOR SIEMENS.,
3. DUBAI ELECTRICITY AND WATER AUTHORITY IN DUBAI FOR ENEL POWER SPA.,
ELECTRICAL ENGINEER/SUPERVISOR/INSPECTOR
Responsibilities include:
• Handle team of Skilled Technician/Un skilled manpower to work out jobs as per project schedule and standard specification, for timely completion Of project, in accordance with project HSE & PTW plans,
• Very good Knowledge in reading all kind of Electrical construction drawings
• Co ordination with client /owner, Subcontractor, for materials, manpower, progress, schedule, Interface activities & planning department.
• Review of all Electrical drawing and giving input to design department
• Development and updating of the cost estimates and schedules for the works.
• Site surveys of existing facilities to establish and identify the actual requirements.
• Review of SLD (Single Line Diagram)
• Test Pack Preparation
• Marking up System and Sub System
• Test report preparation
• Conducting loop test
• Co ordination with Consultant and Engineering for design review
• Testing,Commissioning of all electrical Equipment
• Ensure effective corrective action on the NCRs and Site Instruction.
• Technical and Commercial correspondence with Vendors.
• Making as built all construction drawings.
• Making recons illation of all site construction material.
• Conducting tool box talk
• Generating work permits and required field isolations, conducting toolbox talk and risk assessment on job.
MAY 2000 TO MARCH 2002.
TUTICORIN PORT TRUST.,
ELECTRICAL MAINTENANCE ENGINEER
Responsibilities include:
• All kind of electrical equipment maintenance.
• Attending Periodical maintenance.
• Attending all kind of electrical equipment shut down maintenance.
• Preparing monthly/weekly maintenance sheet as required adequately,
• Execute maintenance works as per HSE & PTW of plant in operation,
JUNE 1998 TO MAY 2000
1. OMAN LIQUEFIED NATURAL GAS PROJECT IN OMAN FOR SHELL GROUP
2. MAWELAH 132KV&33KV TRANSMISSION SYSTEM/GIS SUBSTATION IN OMAN FOR MUSCAT ELECTRICITY AND WATER AUTHORITY
ELECTRICAL ENGINEER
Responsibilities include:
• Handle team of Skilled Technician/Un skilled manpower to work out jobs as per project schedule and standard specification, for timely completion Of project, in accordance with project HSE & PTW plans,
• Very good Knowledge in reading all kind of Electrical construction drawings
• Co ordination with client /owner, Subcontractor, for materials, manpower, progress, schedule, Interface activities & planning department.
• Making requisition for all kind of project materials.
• Prepare technical documents including data sheets and requirements for material, testing and requisitions.
• Preparation of Project planning
• Raising and Attending punch list work.
• Review of all Electrical drawing and giving input to design department
• Testing,Commissioning of all electrical Equipment
• Ensure effective corrective action on the NCRs and Site Instruction.
• Technical and Commercial correspondence with Vendors.
• Making as built all construction drawings.
• Making recons illation of all site construction material.
• Review the Project planning Schedule
• Attending Weekly Progress meeting with client and Sub contractor
• Generating work permits and required field isolations, conducting toolbox talk and risk assessment on job.
DECEMBER 1994 TO MAY1998
1.TUTICORIN THERMAL POWER PROJECT FOR TUTICORIN THERMAL POWER STATION.,
2. SURAT LIGNITE POWER PROJECT FOR GUJARAT INDUSTRIAL POWER COMPANY LTD.,
M/S KRUPP INDUSTRIES INDIA LTD
ELECTRICAL ENGINEER
Responsibilities include:
• Co ordination with client /owner, Subcontractor, for materials, manpower, progress, schedule, Interface activities & planning department.
• Review of all site construction drawing
• Technical and Commercial correspondence with Vendors and Client.
• Making as built all construction drawings.
• Making recons illation of all site construction material.
• Testing,Commissioning of all electrical Equipment
• Conducting Cable High Voltage test
• Attending Weekly Progress meeting with Client and Subcontractor
• Preparing Project planning Schedule
• Mobilization and Demobilization of all Site equipment and initial set up
• Preparing Completion Pack and Handing Over the Project to Client
MAY1994 TO DEC 1994
TUTICORIN THERMAL POWER PROJECT FOR TUTICORIN THERMAL POWER STATION
M/S JEYACHITHRA CONSTRUCTION COMPANY
SITE ENGINEER
Responsibilities include:
• Handle team of Skilled Technician/Un skilled manpower to work out jobs
• Arranging material to site
• Making as built all construction drawing and Reconciliation of all site material
• Generating work permits & Conducting toolbox talk and risk assessment on job.
APPENDICES
TECHNICAL EXPERIENCE
• Kauther Depletion Compression Project – 132KV 5 Nos Switch yard bay extension, 2x17MW Synchronous motor, VFD system, Instrument air system, 132/6.6KV Transformers, 6.6/415V Station Transformers, 132/11/6.6KV convertor Transformers, up to 1core 400Sqmm HV cable laying and termination work, Harmonic Filter station, Condensate Pump system, Earthing, Lighting work, etc.,
• Harweel Oil&Gas (EOR Project) - 132 & 33Kv Over Head Line ( Single and Twin ELM),132/33Kv GIS Substation,132/33KV,33/11KV,33/415v,63MVA,17MVA,15&2MVA,125MVA Transformer, Plant Earthing, Cathodic Protection for Tank and Pipe Line, Providing Temporary Cathodic Protection for Pipe Line, Main Booster Station, 33KV Substation, Control Station,11KV Substation, Up to 33KV cable laying, Fibre optic cable laying along with pipe line and plant, Motor up to 11MW,Electrical&Instrument Cable Glanding and Termination, Tray work,
• Offshore Oil Field Project – Power Transformer, MV Transformer, Earthing Transformer, Bus Duct,33MW Generator, Water and Gas injection Compressor, Sea Lift Water Package,Core filter package, Instrument Air Compressor, Glycol regeneration System, Manifold,33KV and LV Control room,11KV Capacity drive Water cooling medium, Heat Tracing system, Public address system, Telecommunication system,Fire and Gas system,Lighting,Earthing, Electrical Instrument Cable Glanding and Termination, Tray work,
• Northern Oman Gas Project – 33/415V Transformer, LV Control Room, Glycol Regeneration, Gas Lift Compressor, Gas injection Compressor, Plant Lighting, Plant Earthing, Fin Fan Coolers, Cathodic Protection in Pipe Line, Block Valve Station, Gas metering Station, Fibre optic cable laying along with pipe line and plant, Underground and Above ground cable laying Testing, Commissioning and Hook Up with Existing plant
• Al Shuweihat S1 Power and Water Project – 3 x 100M /h capacity Demineralization plant
• Dubai Electricity and water Authority Power Plant Project – Gas and Steam Turbine, Auxiliary and Waste Heat Recovery Boilers, Bus Duct, Power Transformer, HV and LV Cable Laying and Glanding&Termination,Turbine control room, UPS,Plant Lighting, Plant Earthing
• Mawelah 132/33KV GIS Ring Main Substation Project - Installation, Testing and commissioning of switch switchgears, protection relays, 125 MVA, 132 / 33 KV transformer, 132 KV, 33 KV GIS, outdoor 33 KV switchyard, LV switchboard, Lighting panels, Earthing system, batteries, chargers, control panels, relay panels, 132 KV grid substation
• Oman LNG Project - Gas Turbine Generator 32MW X 4nos, 63MVA Transformer x 4 Nos Under & Above Ground Cable Laying, Glanding and Termination of Power and Control Cable(1.1Kv, 6.6Kv, 11Kv, 33Kv), Heat Tracing system, Telecom, Public address system, Fibre optic cable laying inside the plant, Fire and Gas System, Installation Of Earthing Electrodes, Plant Earthing, Equipment Earthing. Electrical Instrument Cable Glanding and Termination, Tray work, Measuring Of Earth Resistance of Electrodes, Installation of UPS system, Installation of Cable Trays,Cathotic Protection work
• Thermal Power Plant Project – Installation,Testing & Commissioning of 6.6KV Control room,415V Switch Board, HT & LT Motors in Coal Handling Plant, HT & LT Cable Laying, Glanding, Straight through Joints, Plant Lighting, Stacker & Reclaimer(PLC Operation),Cable Tray Work, Plant Earthing,6.6/6.6KV Isolating Transformer,6.6/415V Transformer,Electrical Hoist, Coal Handling Plant all related Equipment Like Crusher, All kind of Conveyors’ drive, Handing over to client & Assistance given for Performance guarantee test to above plants
TRAINING
TECHNICAL TRAINING
1. Installation and Maintenance of Electrical and Instrument Equipment in Potentially Hazardous Area Course
2. Internal QMS Auditor ISO 9001-2000 from LRQA Cert No: 5063NHQ0700112/05
CERTIFICATION COURSE FROM THOMSON C NET
1. Time management
2. E-Mail Etiquette
3. Microsoft outlook 2003 Fundamentals
SAFETY TRAINING
1. Basic first aid course from Gulf technical & Safety Engineering Centre LLC
2. STOP for Supervision from DUPONT
3. Job Hazardous Analysis (JHA) from OTI Oman
4.3 Days Basic Life Support Programme from OTI Oman
5. H2S Entry Permit Course from Safety Technical Services Co LLC.
6. Performing authority Certificate from BP-AIOC
SOFTWARE TRAINING
1.MS Office
2.Win Pcs
3.Auto CAD
PERSONAL BIO
Date & Place of Birth 06 Sep 1976 – Tuticorin, India
Citizenship India
Marital status Married,
Passport Details Pass port no : J3761558
Issued at : Muscat,Oman
Issued On :12-07-2010
Valid up to :11-07-2020
Offshore Medical Certificate No : AA/05.07/.031from UKOOA
Valid up to : 30/06/2008
Offshore Survival Certificate No :BSTO03001 from OPITO
Valid up to : 08/07/2009
(J.SAMUEL JEBARAJ)