Post Job Free
Sign in

Manager Engineer

Location:
Sandy Spring, MD
Posted:
August 10, 2011

Contact this candidate

Resume:

*

Curriculum Vitae

Akhmad Erwandono, Bachelor.Eng, Bachelor. Ec

Mobile : +62-815-***-****

Personal mail (1st) : ******.*********@*****.***

Personal mail (2nd): ******.*********@*****.***

Marital status : Single

Gender : Male

Bachelor of Engineering Major Electronic Telecommunication Engineering

Bachelor of Economic Major Economic Science & Development Studies

PROFESIONAL EXPERIENCE SUMMARY

• Organize and Perform installation, commissioning, testing, and integration also acceptance test of UMTS

WCDMA/HSDPA Nokia Siemens Network Element RAS 5.1, RAS06, RU 10 RNC and Flexy/Ultra Node B.

• Implementing Software and Hardware Upgrade for RNC from RAS 5.1, RAS06 and RU 10 and Node B from

WN3.0, WN4.0 and WN5.0 from Local and Remote OSS Support also release upgrades H/W retrofit according to

the SOP's.

• Plan and perform Hardware upgrade of RNC from RN2.1 to RN2.2 RNC196, to RN3.0 RNC450/150 to RNC450/450

also from RNC450 to RNC2600 include WBTS Hardware upgrade for Ultrasite WBTS and Flexy WBTS FSMB to

FSME with double system module and Carrier. Plan and perform Software upgrade of RNC from RN2.1 to RN2.2 to

RN3.0 to RU 10 either RNC & Nemu/OMS Upgrade From Nemu Q2 to OMS 3.38 to OMS 4.43 include WBTS

Software upgrade for Ultrasite WBTS and Flexy From WN3.0 to WN4,0 to WN5.0 Locally and Remote OSS Support

• Implementing Change Delivery installation RNC locally and Remotely from OSS for RN 2.2 CD1.3 to CD2.0,

RN3.0 CD0.0 to CD 3.5,RN 4.0 CD0 to CD 2.1 include NEMU RN2.2 CD2.0 Installation, OMS SW RAS06 corr 0 -

34, RU10 Corr 0 - 41 and WBTS WN3.3 to WN4.0 CD 3 to WN5.0 CD3.2 of Flexy BTS include Hybrid Solution for

Ethernet Node B configuration for data call complement the ATM Also Full IP Solution.

• Implementing IU-CS, IU-PS and IU-B Full IP Solution, Hybrid Solution Between ATM &IP also Full ATM Solution

include Installation & activation Feature file, License File and Parameter File & Mastering IU-CS,IU-PS,IU-B Control

Plane & User Plane Level various protocol as SS7/Sigtran/ATMAAL2/ATMAAL5/TCP/IP for VLAN implementation

• Troubleshooting of Hardware and Software NE RNC, NEMU, OMS, Node B, OSS Netact and IP

switch/Router/NGN/MPLS/ ATM aggregator/Transmission node. NEMU/OMS application & configuration

troubleshooting, Nemu/OMS troubleshooting of Data Performance Measurement send to OSS & Feature test.

• Organize, Conduct swap activities from Existing Vendor Equipment to New Vendor Equipment and Execute cut

over for the swap activities also Monitoring Activity from NMS for RAN/BSS Cutover. Planning and implementation of

Rehoming WBTS, Reparrenting IU-CS and IU-PS to new IU-CS and IU-PS

• Mastering collect Log tracing and Analyze Troubleshoot tools for IU-CS, IU-PS and IU-B such Nethawk M5

protocol analyzer, Perform and Analyze Massage tapping for TCP/IP tracing massage protocol and layer level

massage with Ethereal/Wireshark, Fishing Macro log Collecting and analyze for Call and Performance KPI

troubleshooting , Emil Sacks Protocol Massage analyzer RAS 5.1 , RAS06 and RU 10,Technical Note 38 RNC

Logcol and Zcollecting Log OMS for System detail and Performance KPI troubleshooting, DMX Log Call

Monitoring, HMS Update, Black Box and Service Terminal Extension detail Unit and systems troubleshooting.

• Handling Emergency Problem resolved immediately In a time manner on response, include Remedy Case

resolved act as L1,L2 and L3 of Local And Global Care Customer (GCC) using troubleshooting tools such Protocol

Analyzer , Call message for Computer Unit DMX/Chorus Unit such ICSU tracing of Network Quality Improvement,

Involved in the Network Optimization for Throughput and Handover issue by using TCPDUMP in RNC and Packet

Network also RF Parameter configuration and Perform tests coordination for Improvement and Optimization and

Performance Measurement to OSS troubleshooting

• Mastering troubleshooting Configuration Management and administration OSS Netact 3.2 to 4.2 to 5.1

application Support for CM Editor and CM Operation of Configuring XML and XML Plan download to for site creation

and parameter adjacencies creation, Network Editor/ Top Level User/ SUM Group/ Network License Manager.

Software Manager Create and configure OSS Object Flexy. Ultra WBTS and HSDPA License download/report

troubleshooting from License Manager and O&M through Top Level User Interface, Node SW upgrade through

Software Manager, Trace viewer for the NE Tracing, Telnet connection to NE through SSH xterm extension in OSS

include setup OSS application setup console and local host terminal, FTP application and NE RNC Topology Upload

and WBTS License Upload Distribution and Integration On OSS for New RNC and Node B.

• Development and implementation of O&M processes coordinate with the technical support of 3rd party equipment,

Support roll-out and performs the tests for the network elements according to the correct documentation in order to

get the network elements accepted by the customer, Multi vendor integration Network Support and having

Knowledge on IP Equipment Such Cisco (Router & Switch), HP & Sun Server, EMC Storage devices

• Customer Interface on Product knowledge, Technical site survey, coordination with customer and Planning

Department, organize need of future expansion and Maintain relationship with customer, Implementation Project

Management and Quality of Nokia Standard, Installation and Implementation Planner of Project, Prepare Bill Of

Quantity and sales package for Project, Draw Floor Lay out on AutoCAD in 2D object and Customized ancillaries mtr

• RNC and IP/ATM Dimensioning for Optimization and Data fill Input to RNC and IP/ATM AXC/DXX/IP transmission

2

WORK EXPERIENCE

July 2008– Present

Company : NSN Do Brazil Ltda , Brazil

Position : Nokia RAS06/RU10 RNC/Node B Care Engineer

Scope of Work :

1. Organize and Conduct installation, commissioning, testing, and integration also acceptance test of UMTS

WCDMA/HSDPA Nokia Siemens Network Element RAS 5.1, RAS06, RU10 RNC and Flexy Node B.

2. Implementing Software and Hardware Upgrade for RNC from RAS 5.1, RAS06 and RU 10 and Node B

from WN3.0, WN4.0 and WN5.0 from Local and Remote OSS Support also release upgrades H/W retrofit

according to the SOP's.

3. Plan and perform Hardware upgrade of RNC from RN2.1 to RN2.2 RNC196, to RN3.0 RNC450/150 to

RNC450/450 also from RNC450 to RNC2600 include WBTS Hardware upgrade for Flexy WBTS FSMB to

FSME with double system module and Carrier.

4. Plan and perform Software upgrade of RNC from RN2.1 to RN2.2 to RN3.0 to RU 10 either RNC &

Nemu/OMS Upgrade From Nemu Q2 to OMS 3.38 to OMS 4.43 include WBTS Software upgrade for Flexy

WBTS From WN3.0 to WN4,0 to WN5.0 Locally and Remote OSS Support

5. Implementing Change Delivery installation RNC locally and Remotely from OSS for RN 2.2 CD1.3 to

CD2.0, RN3.0 CD0.0 to CD 3.5,RN 4.0 CD0 to CD 2.1 include NEMU RN2.2 CD2.0 Installation, OMS SW

RAS06 corr 0 -34, RU10 Corr 0 - 42 and WBTS WN3.3 to WN4.0 CD 3 to WN5.0 CD2.1 of Flexy BTS

include Hybrid Solution for Ethernet Node B configuration for data call complement the ATM Also Full IP

Solution.

6. Implementing IU-CS, IU-PS and IU-B Full IP Solution, Hybrid Solution Between ATM and IP also Full ATM

Solution include Installation and activation Feature file, License File and Parameter File

7. Troubleshooting of Hardware and Software NE RNC, NEMU, OMS, Node B, OSS Netact and IP

switch/Router/NGN/MPLS/ ATM aggregator/Transmission node. NEMU/OMS application & configuration

troubleshooting, Nemu/OMS troubleshooting of Data Performance send to OSS & Feature test.

8. Implementing IU-CS,IU-PS,IU-B Control Plane and User Plane Level on Various protocol such

SS7/Sigtran/ATM AAL2/ATM AAL5/TCP/IP for VLAN Implementation

9. Performing collect Log tracing and Analyze Troubleshoot tools for IU-CS, IU-PS and IU-B such Nethawk

M5 protocol analyzer, Perform and Analyze Massage tapping for TCP/IP tracing massage protocol and

layer level massage with Ethereal/Wireshark, Fishing Macro log Collecting and analyze for Call and

Performance KPI troubleshooting , Emil Sacks Protocol Massage analyzer RAS 5.1 , RAS06 and RU

10,Technical Note 38 RNC Logcol and Zcollecting Log OMS for System detail and Performance KPI

troubleshooting, DMX Log Call Monitoring, HMS Update, Black Box and Service Terminal Extension detail

Unit and systems troubleshooting.

10. Handling Emergency Project and Care Problem resolved immediately In a time manner on response,

include Remedy Case resolved act as L1,L2 and L3 of Local And Global Care Customer (GCC) using

troubleshooting tools such Protocol Analyzer , Call message for Computer Unit DMX/Chorus Unit such

ICSU tracing of Network Quality Improvement, Involved in the Network Optimization for Throughput and

Handover issue by using TCPDUMP in RNC and Packet Network also RF Parameter configuration and

Perform tests coordination for Improvement and Optimization.

11. Mastering and troubleshooting Configuration Management and administration OSS Netact 3.2 to 4.2 to 5.1

application Support for CM Editor and CM Operation of Configuring XML and XML Plan download to for site

creation and parameter adjacencies creation, Network Editor/ Top Level User/ SUM Group/ Network

License Manager. Software Manager Create and configure OSS Object Flexy. Ultra WBTS and HSDPA

License download/report troubleshooting from License Manager and O&M through Top Level User

Interface, Node SW upgrade through Software Manager, Trace viewer for the NE Tracing, Telnet

connection to NE through SSH xterm extension in OSS include setup OSS application setup console and

local host terminal, FTP application and NE RNC Topology Upload and WBTS License Upload Distribution

and Integration On OSS for New RNC and Node B.

Project Handle Achievements

1. Implementation of 3G/HSDPA RNC (Radio Network Controller) RAS 5.1 RN2.2 upgrade to RAS06

RN3.0 upgrade to RU10 RN4.0 upgrade to CD2.1, Nemu upgrades to OMS and OMS Upgrade to CD3.0

2. Implementation of 3G/HSDPA RNC (Radio Network Controller) RN 3.0 150/300/450 RAS06 & RN4.0 2600

3. Implementation of 3G/HSDPA Nokia Flexy Node B in City area W.N 4.0 with Ethernet configuration for Data

Call and WN5.0 Full IP Configuration with RET Antenna

4. Implementation of IP MPLS/S-AXC/Tellabs ATM Cross Connect, PMP, MSR for 3G Transmission .

November 2007 – June 2008

Company : Zain , Kingdom of Saudi Arabia

Position : Nokia Second Line Maintenance RNC/RAN Engineer

Scope of Work :

3

1. RNC RAS 5.1 and RAS06 and Flexy Node B installation, commissioning and integration,

troubleshooting, S/W and H/W Upgrade for RNC and Node B, release upgrades, CD installation and

H/W retrofits according to the SOP's

2. OSS Netact Support for Configuring XML and XML Plan download to CM Manager .Create OSS

Object and configure through Network Editor Citrix OSS. Flexy BTS and HSDPA License download

from License Manager and O&M through Top Level User Interface.

3. OSS Application Setup for Console and Local Host Terminal

4. Correcting RNC faults and performance degradations in the managed network

5. Responsible for Care activity & the technical support, S/W maintenance and other NW care tasks

6. Collection and analysis using Netact Tools and Nethawk and Generate parameter into Datafill

7. RNC and ATM Dimensioning for Optimization & Datafill Input to RNC and ATM AXC transmission

8. Network Monitoring and surveillance of Nokia Radio Access Network

9. Troubleshooting of Alarm and Faulty NE Of Nokia RNC, SDH and PDH Transmission and Node B

10. Manage the in-depth network element technical support for the RNC or related equipments in the

network operation.

11. Involved in the Network Optimization, Network Quality Improvement

12. Perform site visits and drive tests coordination for Improvement and Optimization.

13. Development and implementation of O&M processes.

14. Support roll-out and performs the tests for the network elements according to the correct

documentation in order to get the network elements accepted by the customer.

15. Supporting Nokia OSS Netact 4.1 Implementation & Performance Measurements data collecting.

Project Handle Achievements

1. Implementation of 3G/HSDPA RNC (Radio Network Controller) S/W Version 2.1 CD 2 Hardware RN 2_1

Step 5 Capacity

2. Implementation of 3G/HSDPA RNC (Radio Network Controller) RN 2_2 196 RAS 5.1 and RN3.0 450

3. Implementation of 3G/HSDPA Nokia Flexy Node B in City area W.N 3.2 , W.N 3.3 W.N 4.0 with RET Ant

4. Implementation of S-AXC/Tellabs ATM Cross Connect, PMP, MSR for 3G Transmission in City Area

September 2007 – November 2007

Company : Ericsson Indonesia (Outsource)

Position : RNC/UTRAN Engineer

Scope of Work :

1. RNC 3810, RXI 820, Node B (RBS3206, RBS3202, RBS3303 Installation, commissioning and

integration, troubleshooting, S/W and H/W Upgrade for RNC and Node B, release upgrades,

H/W retrofits according to the SOP's.

2. IMA Implementation for Node B (RBS3206, RBS3202, RBS3303) using OSS-RC.

Upgrade E1 into 8 E1 IMA for RBS3206 and RBS3202 and License update and hardware

adjustment for Node-B, RXI, RNC.

3. Monitoring Alarm Radio Network Controller (RNC) 3810 and Upgrade Extension

Sub rack until ES-5 for (RNC) 3810

4. Generate and Modify XML and MOs script

5. Implementation 2nd Carrier on 1 Sector for RBS3206 and RBS3202

6. Rehoming Sites to another RNC and RXI or different Extension Subrack

October 2006 – End Of August 2007

o Company : Saudi Telecom Company Al Jawal , Saudi Arabia

o Position : Nokia RNC/UTRAN Engineer (Southern Region)

o Scope of Work :

1. RNC installation, commissioning and integration, troubleshooting if needed, release upgrades, CD

installation and H/W retrofits according to the SOP's

2. Correcting RNC faults and performance degradations in the managed network

3. Responsible for Care activity & the technical support, S/W maintenance and other NW care tasks

4. Collection and analysis using Netact Tools and Nethawk and Generate parameter into Datafill

5. RNC and ATM Dimensioning for Optimization & Datafill Input to RNC and ATM AXC transmission

6. Network Monitoring and surveillance of Nokia Radio Access Network

7. Troubleshooting of Alarm and Faulty NE Of Nokia RNC, SDH and PDH Transmission and Node B

8. Manage the in-depth network element technical support for the RNC or related equipments in the

network operation.

9. Involved in the Network Optimization, Network Quality Improvement

10. Perform site visits and drive tests coordination for Improvement and Optimization.

4

11. Development and implementation of O&M processes.

12. Cooperating with the technical support of 3rd party equipment.

13. Support roll-out and performs the tests for the network elements according to the correct

documentation in order to get the network elements accepted by the customer.

14. Supporting Nokia OSS Netact 4.0 Implementation & Performance Measurements data collecting.

15. Support Nokia NMS200 for central monitoring network

o Project Handle Achievements

1. Implementation of 3G/HSDPA Nokia Ultra Site Node B in City area WN 3.0 with RET Antenna

3. Implementation of S-AXC/Tellabs ATM Cross Connect and ADM for 3G Transmission in City Area

4. Implementation of 3G/HSDPA RNC (Radio Network Controller) S/W Version 2.1 CD 2 H/W Version RN

2_1 Step 5 Capacity

August 2006 – September 2006

o Company : Wataniya Telecomm @ Kuwait

o Position : UTRAN and BSS Consultant

o Scope of Work :

A. Ericsson Project ( City Area )

1. Organize, Site Quality Checking, Supervise and doing activities of acceptance test of BTS

GSM/GPRS/ EDGE/WCDMA/HSDPA equipment as RBS Indoor 2206 and 3G 3206, RBS Outdoor

Macro 2106 and 3G 3107, RBS In building 2207 and 3G 3303 Equipment, Minilink E Classic

Transmission, Minilink High Capacity, Minilink Traffic Node TMR 9650.

2. RNC 3810, RXI 820, Node B (RBS3206, RBS3202, RBS3303 Installation, commissioning and

integration, troubleshooting, S/W and H/W Upgrade for RNC and Node B, release upgrades, H/W

retrofits according to the SOP's

3. IMA Implementation for Node B (RBS3206, RBS3202, RBS3303) using OSS-RC.

Upgrade E1 into 8 E1 IMA for RBS3206 and RBS3202 and License update and hardware adjustment

for Node-B, RXI, RNC

4. Organize swap activities and cut over from Siemens SRAL (Siemens Radio Access Low Voltage)

Microwave to new Ericsson Minilink Traffic Node Microwave Transmission, Site Quality Checking,

Supervise and doing activities of installation, commissioning, Testing, integration and acceptance test

of Siemens SRAL to Minilink E Classic Transmission, Minilink High Capacity, Minilink Traffic Node

TMR 9650

B. Nokia Project ( Suburb Area )

1. Organize, Site Quality Checking, Supervise and doing activities of installation, commissioning, testing,

and integration also acceptance test of BTS GSM/GPRS/EDGEWCDMA equipment as US, Supreme,

Optima, Metro site 50, BSC, TCSM, RNC 2.1, Flexi Hopper Transmission and Metro Hub Node.

2. Organize swap activities and cut over from Siemens SRAL (Siemens Radio Access Low voltage)

Microwave to new Nokia Flexi hopper Microwave Transmission, Site Quality Checking, Supervise and

doing activities of installation, commissioning, testing, integration and acceptance test of Nokia Flexi

hopper Microwave Transmission and S-AXC Traffic Node

3. Customer Interface on Product knowledge, site survey, coordination with customer and Planning

Department, organize need of future expansion and Maintain relationship with customer, Implement

Rehoming BTS, Reparrenting BTS and BSC, EDGE Implement and Upgrade TRX BTS and Also

Upgrade capacity BSC, SGSN, MGW, MSS and HLR.

4. Support Implementation of Network Element monitoring of NMS2000 with OSS for RAN/BSS

Monitoring under Nokia Netact Platform. Coordinate with VAS Team for OSS 4.0 implementation.

Conduct monitoring activity from NMS2000 for RAN/BSS cutover.

o Project Handle Achievements

1. Swap HSDPA Node B from Ericsson to Nokia Supreme and Metrosite 50

2. Implementation 480 HSDPA Node B Ericsson RBS 3206,3106 and 285 HSDPA Node B Nokia Supreme

and metro site

3. Implementation of 500 Hops Ericsson Minilink TN for 3G Transmission

4. Implementation of 40 Hops Nokia Flexi hoppers for 3G transmission.

5

November 2004 - August 2006

Company : Nokia Networks Indonesia

o Position : Project Engineer of Core and Radio Network

o Scope of Work :

A. Telkomsel Project (Biggest Operator in Indonesia)

1. Organize , supervise and installation, commissioning, testing, integration and acceptance test of Nokia

GSM/GPRS/EDGEWCDMA equipment as US, Supreme, Optima, Metro site 50, RNC 2.1,WN 3.2,S –

AXC, 3G Circuit Switch Release 4 ,2G & 3G SGSN,CG,BG,DNS, Nokia IPSO Platform.

2. Planning & Implementation for Rehoming BTS, Reparrenting BTS and BSC,EDGE Implementation,

Upgrade TRX/Carrier capacity for 2G & 3G BTS Also Upgrade NOKIA H/W & S/W BSC S10.5/RNC RN

2.1, PS 2G SGSN SG3 and SG 5 & CS Core MSC M12 and MGW U3A,CS Core Release 4 Impl.

3. Customer Interface on Product knowledge, Technical site survey, coordination with customer and

Planning Department, organize need of future expansion and Maintain relationship with customer.

4. Implementation Project Management and Quality of Nokia Standard, Installation and Implementation

Planner of Project, Prepare Bill Of Quantity and sales package for Project, Draw Floor Lay out on

AutoCAD in 2D object and Customized ancillaries material.

5. Support Implementation of Network Element monitoring of NMS2000 with OSS for RAN/BSS

Monitoring under Nokia Netact Platform. Coordinate with VAS Team for OSS 3.1 implementation.

Conduct monitoring activity from NMS2000 for RAN/BSS Cutover.

B. Indosat Project (Partial support Multi vendor Integration Ericsson Project)

1. Installation, commissioning, testing, integration and acceptance test of RBS Indoor

2. Multi vendor integration Support for Installation, Commissioning, testing, Integration and acceptance

test of Ericsson BSC AXE Platform APG 40 & RAN Cello Platform, RBS Indoor 2206 & 3306, RBS

Outdoor macro 2106, RBS Indoor 2206 and 3306, RBS Outdoor Macro 2106 and 3G 3107, RBS In

building 2207 and 3G 3303 Equipment

3. Customer Interface on Product knowledge, site survey, coordination with customer and

4. Planning Department, organize need of future expansion and Maintain relationship with

5. Customer Implement Rehoming BTS, Reparrenting BTS and BSC, EDGE

6. Implementation and Upgrade TRX BTS.

7. Support Implementation of Network Element monitoring of NMS2000 with OSS.

Customer Project Handle and achievement:

1. Telkomsel GPRS Expansion and Transmission Troubleshooting Of 3 SGSN at Smg,BJMSN,SBY

2. Indosat CG,GGSN, 3G Release 4 CS Core, Indosat MSC/VLR Transmission and Indosat GPRS Expansion

3. Telkomsel Swap Project Motorola BTS, BSC, TCSM, Hop TRS , at West Java Area & JABODETABEK

4. Telkomsel IP Core, MMS ICD,NTMS, Nokia IPSO Platform,OSS 3.1 and NMS2000 at Batam and Jakarta

5. Excelcom 3G RAN include 158 Node B, 3 RNC, 3 S-AXC and Core Network include MGW, MSS,CDS,GCS

implementation Roll out

April 2004 - November 2004

o Company : Huawei Technologies Investment Co., LTD, Shenzhen PRC China

o Position : BSS GSM/CDMA2000 Engineer

o Scope of Work :

1. Doing site survey, coordinate with customer and organize need of future expansion

2. Organize and supervise installation, commission, Integration and Acceptance testing of GSM/CDMA 2000

equipment on a basis of region

3. Maintenance, Data configuration, Alarm, Traffic Statistic, Integration of BSC/BTS expansion,

Troubleshooting, Insure progress and quality of project

4. GSM BSS Spare part Inventory Management in Warehouse (Huawei and Excelcom Warehouse)

5. BSS CDMA 6600 Training in Shenzen PRC & BSS GSM M900 Training

o Customer Project Handle :

1. Excelcom GSM BSS Expansion Sumatra, Kalimantan, Sulawesi, Irian/Papua, Nusa Tenggara.

2. Esia CDMA 200 BSS Expansion in Bandung

6

January 2004 - April 2004

o Company : PT Motorola Indonesia (Telecommunication Company)

o Position : Field Test Engineer

o Scope of Work :

1. Do field test of company product handset in Indonesia Cellular Environment.

2. Make report of test result after doing the test and Benchmark with Standard

3. Upload, Upgrade, Download Software and Doing the procedure given by superior

2003

o Company : PT Satelindo (Telecommunication Company)

o Position : Final Assignment in General Packet Radio Service Core Network Dept.

o Scope of Work :

1. Analyze GPRS quality of service parameter

2. Collect and proceed data GPRS quality of service

2003

o Company : PT Siemens Indonesia (Telecommunication Company)

o Position : Information Communication Mobile Network Business

Development Department Technical Sales Division

o Scope of Work :

1. Having introduction of mobile telecommunication system (GSM )

2. Prepare and presenting Siemens Mobile Telecommunication Network Technology

2002

o Company : PT Satelindo (Telecommunication Company)

o Position : Operating Satellite System Division Spacecraft Engineering

o Scope of Work:

1. Having introduction of satellite system communication

2. Maintain satellite regular activity and control satellite parameter from Earth station

3. Check list ground station, check list parameter satellite and Collecting

CERTIFICATION AND PROFESIONAL DEVELOPMENT

November 9 -13 2009 Nokia RU10 RNC and Node B Commisioning and Integration of All IP Solution IPA 2800

September 12 -16 2009 Nokia RU 10 RNC and Node B Hardware and Software Upgrade of IP Solution IPA2800

August 25 -29 2008 Nokia Solution on Disaster recovery software support of the IPA2800 & DX200

July 3 – 7 2006 Nokia Solution for 3GPP R4 Core – MSS System & System Features, Certified

June 19 – 23 2006 Nokia Solution for 3GPP R4 Core - MSS, GCS & CDS Architecture, Certified

May 1 – 5 2006 Nokia RNC Architecture & Functionality, Certified, NTCJakarta, Nokia Oyj Indonesi

April 17 – 21 2006 Nokia 3G RAN Transmission Certified, NTC Jakarta, Nokia Oyj Indonesia.

March 15 -31 2006 MSC VLR, HLR MSS Operation and Maintenance, Nokia Oyj Bandung.

March 1-7 2006 Nokia 3G US Supreme and S - AXC I,C,I, Nokia Oyj Indonesia

February 1-3 2006 3G ATM and TCP/IP On Nokia, Nokia Oyj Malaysia

January 9 – 13 2006 Nokia 3G Release 4 Technologies, Certified, Nokia oyj Indonesia

Nov 27 – Dec 3 2005 Training, DX 200 Switching System Operation & Maintenance, Nokia Oyj Singapore

October 10- 15 2005 Nokia RAN04 Features, Certified, NTC Bandung, Nokia Oyj Indonesia

September 19 – 24 Nokia 2G US Installation, Commissioning, Integration, Nokia Oyj Indonesia

Aug 2005 - Sept 2005 Understanding GSM Nokia System, Certified. Nokia Oyj Indonesia

July 2005 - Aug 2005 Nokia 3G Release 4 Architecture, Certified. Nokia Oyj Indonesia

July 1 – 6 2005 Nokia 3G System, Certified, NTC at Kuala Lumpur, Nokia Oyj Malaysia

May 15 -20 2005 Training, Project Management Process and Tools , Nokia Training Centre at Bangkok (Thailand), Nokia Oyj

Thailand

March 14 – 18 2005 Edge System Overview ( S11.5 ), Certified, Nokia oyj Indonesia

January 3 – 7 2004 Introduction to IPA 2800 packet platform, Certified, Nokia Oyj Indonesia

September 6 – 24 2004 Training, CDMA 2000 BSS 6600 Training, Huawei University at Shenzen (PRC), Certified, Shenzen, China.

Apr 16 – May 14 2004 Training, Huawei - Excelcom Base Station Subsystem Training (BSC, BTS,PCU,Power Supply Unit,OMC) by

Huawei Training Centre, Shenzen, China.

February 17 – 21 2003 Training , PLMN SBS System Overview BR 6.0, Siemens Jakarta

August 19 – 20 2002 Training , Satellites Communication System ; Introduction

Computer Skills

Business Application : Auto Cad, Microsoft Office , Math Cad, Maple, Visio Technical, Corel Draw, Ms. Internet Explorer, SPSS, E –

Views, Corel , Adobe Page Maker

Operating System : MS. DOS, MS. Windows XP, UNIX

Programming Language : Visual C++, Visual Basic, HTML

Language Skills

English (Active of Spoken and Written)

Portuguese ( Active of spoken and written)

Spanish ( Passive of Spoken and Written )

Mandarin (Passive of Spoken and written)

Arabic ( Active of spoken and written)



Contact this candidate