OLLEN RIVERS
Houston, Tx *****
OBJECTIVE
PLANNER\SCHEDULER...TECH.SERVICE SPECIALIST...SYSTEM ANALYSIST
SUMMARY
Extensive analysis and management experience in the petro\chem industry with strong oral and written skills. Broad range of functional experience, including system management, production planning, field evaluation and project plan development.
Skilled in B31.3 and B31.1, P3, P6, CAD 2000, Oracle, Suretrak, PMM, IPIM’s, Excel, Word, Wintergrate.
EXPERIENCE
INNOVATIVE TURNAROUND CONTROL 8/18/08 – 11/08/08
•Primary responsibility, review engineering packages for scope definition. Develop a detailed plan using P3, and integrate logic in Master Schedule.
•Develop and maintain commodity tracking curves and prepare reports for weekly meetings to discuss areas of concern and progress reporting.
Scheduler ( Dynamic Ind Houston, Texas )
Aerotek Energy Services 3/2008- 8/11/08
Planner\ Scheduler ( Amec Paragon Houston, Texas )
• Primary responsibility, develop a detailed Engineering\ Procurement schedule using P3 for offshore Platforms and pipelines, and integrate logic in Master Schedule
• Develop and maintain commodity tracking curves and prepare reports for weekly meetings to discuss areas of concern and progress reporting.
INNOVATIVE TURNAROUND CONTROLS 2/2007 ¬¬ - 12/2007
Planner\Scheduler (Valero Energy Corporation Paulsboro, Nj)
•Primary responsibility, review engineering packages for scope definition. Develop a detailed plan using P3, and integrate logic in Master Schedule.
•Develop and maintain commodity tracking curves and prepare reports for weekly meetings to discuss areas of concern and progress reporting.
S & B ENGINNEERING (LYONDELL) 9/2006 – 12/2006
Mechanical Planner, Houston, Tx.
•Primary responsibility, review engineering packages for scope definition. Develop a detailed plan using P3.
•Create work folders with associated documents such as ISO’s, P&ID’s location plan DWG.’s, orthro’s, cad dwg’s, and digital photo
•Set up a timeline and manpower to perform scope of work
•Draft RFI’s - field evaluation in detail what is necessary to keep the schedule a driving force
•Draft field change orders - developed resource loaded “P3” plan and integrate into master schedule – establishing charge codes
•Redline P&ID’s-documenting all changes
•System walk down – verifying all component install per P&ID’s
•System turnover – transferring care custody and control to client
S & B ENGINEERING (LYONDELL) 3/2006 – 9/2006
Tech. Service Specialist Houston, Tx.
•Primary responsibility, to design Hydro Test packages, define boundaries of each test, conduct system walk downs and analysis to ensure all components are with in compliance and installed. Developed and maintained hydro tracking charts for progress.
•Draft RFI’s – identifying, documenting and addressing issues
•Involving installation of materials
•Redlining P&ID’s tracking changes in system
•Developed System Turnover Packages. Presenting to client the care, custody, and control of the systems as they are completed.
S & B ENGINERING (INNOVENE) 1/2006 – 3/2006
QA\QC Texas City
•Inspection of piping – installation and testing of pipe
•NDE testing – PT welds, visual inspection for fit-up,
•System walk down – inspecting and signing-off piping packages
•System analysis – monitoring the systems for installation per P&ID’s
S & B ENGINEERING (EVALCA) 2/2005 – 12/2005
Tech. Service Specialist Laporte, Tx
•Primary responsibility, to design Hydro Test packages, define boundaries of each test, conduct system walk downs and analysis to ensure all components are with in compliance and installed. Developed and maintained hydro tracking charts for progress
•Developed work packages for civil, structural, I&E, and piping – developed resource loaded “P3” plan and integrate logic into master schedule.
•Redline P&ID’s - tracked and documented changes made by engineering
•Developed System Turnover Packages. Presenting to client the care, custody, and control of the systems as they are completed.
S & B ENGINEERING (SHELL) 10/2001 – 12/2002
Planner\Scheduler Deer Park, Tx.
•Developed work packages from scope of work issued by engineering and the client piping – developed resource loaded “P3” plan and integrate logic into master schedule.
•Pipe auditor – verified and reported percentage complete to management
•Drafted RFI’s – identified and recommend solutions for changes needed to complete systems
•Redline P&ID’s - documented changes
•Inspected and sign-off hydro\pneumatic test packages
•System walk down – inspected and sign-off system packages
•System turnover – present systems to client for custody
L-CON CONSTRUCTION (ORION) 3/2001 – 10/2001
Pipe Design. Laporte, Tx
•Drafted small bore piping
•Redline P&ID’s – as changes arise
•Set system boundaries and test limits
•Drafted hydro\pneumatic test package
•Drafted and tracked RFI’s
•Drafted field change orders piping – developed resource loaded “P3” plan and integrate into master schedule.
RUBICON (S &B ENGINEERING) 8/2000 – 3/2001
Third Party Inspector Baton Rouge, La.
•Pipe Inspection
Insulation And Paint Inspection
•Steam-trace\Electra-trace Inspection
•Pump Inspection
•Vessel Inspection
•System Sign-Off
S&B ENGINEERING (RUBICON) 5/1999 – 8/2000
Pipe Auditor Baton Rouge, La.
•Report percentage complete of work performed
•Drafted RFI’s for field changes
•System walk down – evaluated work installed per P&ID’s
AUSTIN INDUSTRIAL (PHILLIPS) 3/1999 – 5/1999
Pipe Fabricator Houston, Tx
•Pipe fabrication
•Hydro tested pipe
BELMONT (ENTERPRISE) 1/1997 – 5/1997
Pipe Fabricator Mont Belview, Tx
•Pipe fabrication
S&B ENGINEERING (LYONDELL) 3/1996 – 11/1996
Pipe Auditor\Tech Support Houston, Tx
•Reported percent completion of piping system to management
•Drafted hydro\pneumatic test packages
•Redline P&ID’s – marked various changes to the system
•Drafted as-built drawings
•Piping walk down – inspected piping for turnover to client
H B ZACHRY (LYONDELL) 10/1995 – 3/1996
Pipe Foreman Houston, Tx.
•Drafted hydro\pneumatic test packages
•Red line P&ID’s
•Drafted as-built drawings
H B ZACHRY (SHELL) 12/1994 – 10/1995
Pipe Auditor Houston, Tx.
REPORTED PERCENT COMPLETE OF PIPING TO MANAGEMENT
•Walk down pipe packages
•Drafted as-built drawings
•Material take-off for piping
J E MERIT (LYONDELL) 4/1994 – 10/1994
Pipe Foreman Houston, Tx.
•Managed hydro\pneumatic packages
•System turnover – directed the flow of system packages
J E MERIT 2/1991 – 8/1991
Pipefitter (Baton Rouge, La)
•Pipe fabrication
•Hydro\pneumatic tested piping systems
BROWN AND ROOT (ENTERPRISE) 7/1990 – 10/1990
Pipefitter (Mont Belview, Tx)
•Pipe fabrication
BECON CONSTRUCTION (SHELL) 2/1990 – 7/1990
Pipefitter (Deer Park)
•Pipe fabrication
BECON CONSTRUCTION (CHEVRON) 10/1986 – 2/1990
Pipefitter (Mont Belview, Tx)
MAR’TEX (MULTIPLE LOCATIONS) 01/1985 – 9/1986
Electrical Substations
MYERS CONSTRUCTION (GOODRICH, TX) 01/1982 – 12/1984
GRADUATED HIGH SCHOOL
Goodrich, Tx
REFERENCES
Robert Szymborski: Project Controls Manager / Lead Planner Scheduler
Cell: 443-***-****
Cecil Harmon: Sub Contractor Coordinator / Field Engineering
Cell: 832-***-****
Raul Rodrigious: Lead Scheduler Chevron
Cell: 832-***-****
Leon (Red) Mullinox: Lead Scheduler Exxon\Mobil
Cell: 713-***-****
Mike Nichol: Black & Veatch Construction Consultant
Dan Schlid: Lead Scheduler Chevron