Post Job Free
Sign in

Welding Power Plant

Location:
Patna,Gopal ganj (Bijaipur,), BR, 841508, India
Salary:
6000 USD
Posted:
August 18, 2012

Contact this candidate

Resume:

RESUME

PERSONAL DETAILS

Name : RAJESH DHAR DUBEY

Date of Birth : 6th August, 1972

Marital Status : Married

Religion : Hindu

Address : C/O Sanjay Dubey RP Mobile shop Rajesh Dhar Dube,

Near Patil chaok,

Post – Ghansoli,

Thane, Belapur Road,

Navi Mumbai-400701

Contact no: 009***********

Permanent Address : S/O Markanday Dhar Dube,

Vill; Sarupai Tola Khape,

Post: Jagdishpur, Bijaipur,

Dist: Gopal ganj, Bihar

Contact No : 009***********- (mombay-009***********

E-Mail- dubey983 @gmail.com 002***********

PASSPORT DETAILS

Passport No Place Of Issue Date Of Issue Date of Expiry

A-5013017 PATNA 10/02/1998 09/02/2018

EDUCATION QUALIFICATION

• Diploma in Mechanical Engg. From State Board of Technical Education, Bihar

• Naveen Rajkiya Poltechnic,Patna In Nov 2000

• 12th ISC P.P.G College,Chaomukha,Bihar

ADDITIONAL QUALIFICATION

ASNT LEVEL II in RT’ UT’MT’PT in2007

AWS Examination appeared in June 2010 (mark is 38%)

WORK EXPERIENCE IN ABROAD &INDIA

PERIOD

16 Dec 2011 to still working.

25 Nov2008 to26April 2011

DESIGNATION

QA/QC Inspector Fabrication &Welding

Welding QC

ORGANIGATION

Group Five(south Africa&DRC)

MISA(KSA) Jubail

Feb 2007 To March 2008 Welding QC EXTERRAN, Belleli Energy, Dubai.

8 March 2006 to 17 June 2006 Welding QC Kharafi National KNPC, Kuwait.

26 Jan 2004 to 26 Jan 2006 Welding QC Saudi Cranes Steel (Saudi KSA.)

22nf Feb 2003 to 27th Aug 2003 Welding QC Mohammad Al- Mojil Group(MMG).AJMAN-UAE

05 Dec1999 to 06 Nov 2003 Welding & Feb- QC Chemical Process piping Pvt .Ltd.(Mom)

400088 (INDIA)

STRUCTURAL, PIPING AND VESSELS WELDING INSPECTION.

1. Check Welding procedure specification and Inter pass temp During Welding.

2. Check the Joint (root gap Bevel Angle) filler metal pre heat before Starting Welding as per WPS.

3. Check consumable item and approved WPS and weld map preheat temp on the joint before start welding.

4. Check preparation welding joint and welding process qualified welder.

5. Before start welding, check the welding equipment calibration date, (W.P.S) and I.T.P (inspection procedure Test).

6. After welding check the joint No. and the Welder ID No. on the joint after verifying any welding defects of weld surface(Visual Inspection)

7. Before welding check bevel and the clean o f the joint preparation(root gap including angle)

PROJECT HANDLED IN ABROAD

1. EXTERRAN Belleli Energy FZE (SHARJAH) 125 mmL.P.G Recovery Plant of Offshore Project NO 4856 STRUCTURAL and Piping Welding Inspection process-as GTAW, SMAW, FCAW, SAW for Jamshoro Project Plant 2, Pakistan.

2. Skid piping welding Inspection for OFFSHOR. Project`.

3. HANOVER Belleli Energy FZE Piping welding Inspection as per process SMAW, GTAW, FCAW, SAW for Mass – Project 4859piping skid in PTTEP Northern ARTHIT FIELD OFFSHORE EMASS OFFSHORE CONSTRUCTION PTE LTD. THAILAND

4. Kharafi National as a subcontract Piping Welding Inspection in K.N.P.C (Kuwait), Shuaiba Refinery.

5. HANOVER Belleli Energy as a sub contractor for maintenance work welding Inspection DEWA (Dubai Electricity Water Authority) Power Plant.

6. Repair and new job fabrication welding Inspection in Dishalation plant.Dubai.

7. Welding Inspection vessel and piping project in MISA (KSA) jubail.

Duties and Responsibilities

QC Engg (INSPECTOR).

• TO Check Welding Progress and welding profile according the weld joint symbols.

• TO check, welding consumable Filler metal, Base Metal, Bevel angle and root gap Before welding.

• To monitor Daily surveillance reports in during Welding as per W PS and Map.

• Before start weld check welding joint cleanse root gap preheat, filler /Electrode consumable condition.

• To monitor welder Qualification test report and PQR welding Process and filler/Electrode classification according to the WPS

• TO check visual Inspection after welding according to code requirement.

• TO Check joint fit up as pre Drawing Requirements

• IN Vessel Check long seam, circ seam fit up and nozzle orientation, mean Hole fit up Inspection.

• IN Piping Check Elbow joint, Tee joint, pipe to pipe joint, and joint Elevation.

• TO Check Heat NO and MRV NO, on the Pipe/plate according to Drawing.

• Check MTC NO according to code requirement Drawing

• TO Check NDT (UT, RT PT MT) as per code and section or client requirement.

• TO Check Stores consumable in store room temp

• TO Check mechanical equipment and piping, structural Installation in plant and mining plant .

OTHER ORIENTATION

Reading Writing & Speaking : English, Hind

Date-30-Jun 2012

RAJESH DHAR DUBEY

Place



Contact this candidate