Khaled Mohamed Reda

***** ********* ****, ****: 703-***-****

Fairfax, VA 22033 *************@*******.***

Summary of Qualifications

• Civil Engineer with over 10 years of experience in Construction Industry.

• Proficient in Primavera P3, P6, and Auto-CAD.

• Passionate worker with an eagerness to learn new technologies and construction techniques.

• Self-motivated team member capable of sharing new ideas.

• Easily adapting to new work environments. .

• Ability to convey technical information at all levels.

Education

Bachelor’s degree in Civil Engineering Sciences

Obtained an equivalency report from (I.E.R.F Institute) USA Aug.2009

Zagazig University (http://english.zu.edu.eg/) Egypt July 2001

Graduation grade: good

Certification

• Project Management Institut-Scheduler Professional (PMI-SP)

Certification No.:1416726 June 2011

• FE ( Fundamentals of Engineering) expected completion April-2012

Experience

Rizzani De Eccher USA Sterling, VA 20166 –USA April 2010 till present

http://www.rizzanideeccher.com/

Dulles Corridor Metrorail Project

Field Engineer

• Inspect rebar cages of bridge segments upon placing in molds according to the bar bending list and the reinforcement distribution stated in shop drawings.

• Inspect integrity of forms and any added accessories required to produce exact shape and design of bridge segments.

• Inspect the proper placement and secure positioning of all inserts required and supplied by main contractor (Dulles Transit Partners) to fulfill erection and design purposes. For example; lifting devices, Sound Wall inserts, electricity trays and drainage sleeves.

• Order and Inspect the proper placing of third party components in each segment required for post tension system. For example: Anchor heads, Post Tension bars and plates and Tendons ducts.

• Inspect bridge segments after pouring to report for any required repair, missing inserts, malfunction of accesosries that might occurred during conrete pouring of segment.

• Document any changes requested by main contractor and design representatives to the shop drawings in order to handover the As Built drawings of each bridge segment before shipping segment to the erection site .

Arab Contractors Company Middle East countries Feb 2002 to Dec 2009

www.arabcont.com/english

Potable Water Treatment Plant ($110,000,000.00) 10th of Ramadan–Egypt Oct. 2009 to Dec 2009

Project Engineer Assistant

• Prepare Progressive Financial Statements regularly of both client and subcontractors

• Control all documents and layouts coming and going to project.

• Develop spread sheets and graphs for Quantity Survey of all contract items.

• Create Shop Drawings for any details or modifications to the master drawings.

Algerian Business Centre (ABC) ($30,000,000) Algiers- Algeria April 2008 to Sept 2009

Project Engineer Assistant

1-Scheduler

• Create the master and baselines schedules of project using Primavera.

• Highlight the Milestones of each functional department in the project (HVAC- Electrical-Plumbing )

• Maintain schedule with actual progress updates focusing on Time more than resources because of the nature of the project

• Communicate between functional managers regarding intersecting deliverables between them ( such as the erection of fall ceiling )

• Assign resources and constraints of vendors and suppliers to related activities

• Report the predicted estimates of time and cost periodically, according to each change of project scope, and after applying any corrective action made in project.

2-3D AutoCAD Coordinator

• Draw a 3D Skelton structure and all the utilities networks involved {Electrical, Plumbing,..}.

• X-ref Networks of different department to catch any interferences between networks.

• Analyze and suggest solutions to these interferences through periodic meetings between correspondents functional managers

3-Financial work

• Prepare Progressive Financial Statements monthly to both Owner and Subcontractors.

• Prepare the Financial Working plan and Cash Flow to produce a uniform distribution of the profit over the project life cycle.

• Create any necessary illustrating spreadsheets and graphs regarding financial progress against cost and profit baseline.

Ground Water Tanks 5000L each (5,000,000 $) Sinai- Egypt Sept. 2007 to Apr. 2008

Subcontractors Manager

• Supervise, guide and control the subcontractor execution in sites to meet the client specifications stated in correspondent structures.

• Prepare Progressive Financial Statements Regularly of both client and subcontractors according to the work progress in the site.

• Manage the work activities to achieve equilibrium between Income & Expenses of each project during its whole life cycle.

• Plane ahead Human, Material and Equipment Resources for correspondent operations to meet the needs of every operation in time.

1308 Residential Units ($43,000,000) Blida- Algeria Aug. 2006 to Sept.2007

Project Engineer Assistant.

• Shop Drawings for any details or modifications to the master layouts when needed in site.

• Valuing the Work in Progress on Site, Adjustments to Provisional Sums and Prime Cost Sums, Re-measurements of Quantities and Recommending Amounts of Interim Payments.

• Measuring Progressive Financial Statements regularly during the construction period

• Quantity Surveying of all aspects of contract.

Potable Water Treatment Plant ($45,000,000) Sinai- Egypt Feb. 2002 to Aug.2006

Field Engineer

Responsible For: 4 ground Water Tanks (5000L), Pumps Station and Filters constructions to:

• Supervise the execution in site according to the code and contract specifications.

• Survey the quantities of all executed elements in the structure.

• Plan detailed time schedules within the range of master plan of structure.

Technical Expertise

• Primavera P6 Self learnt about new features in the modern version of primavera scheduling tool.

• Primavera P3 Used in previous project to develop and maintain schedule along life cycle of the project.

• AutoCAD Frequently used to develop shop drawings, sketches needed in the site

• AutoCAD Architectural Used to build 3D model of structure to coordinate interfering utilities in any complex area of structure (inside fall ceiling, raised floor,..)

• Microsoft Excel Used for Monthly financial statements, Quantity Survey, Budget reports, progressive and presentation Graphs.

• Microsoft Word Used for formal letters to Client, Administration, Subcontractors,

Personal

Recently moved to US for family reasons.

Authorized To work for any emplyer (Green Card).

Arabic is Native language.

Good in English.