Post Job Free
Sign in

Project Manager

Location:
Oakville, ON, L6H 4N5, Canada
Salary:
$25.00/hour
Posted:
June 21, 2011

Contact this candidate

Resume:

BIENVENIDO B. GUINTO JR. **** Golden Briar Trail Oakville Ontario Canada L6H4N5 +1-289-***-**** (mobile)

mailto:********@*******.***

Professional Experiences

Prestige Telecoms June 19, 2010 up to Present

SENIOR AERIAL TECHNICIAN/RIGGER

Assigned Bell Project, Tower erection, Pinwheel installation, Microwave Antennae installation, Antenna Mounting bracket Installation, GSM antennae installation, Antenna re-orientation, Wave guide cable installation, LDF 45 cables installation, Microwave Radio installation, Grounding wires & Plates installation.

Assigned Rogers Project, Tower erection, Pinwheel installation, Microwave Antennae installation, Antenna Mounting bracket Installation, GSM antennae installation, Antenna re-orientation, Wave guide cable installation, LDF 45 cables installation, Microwave Radio installation, Grounding wires & Plates installation.

Assigned Huawei & ZTE Project, Tower erection, Roof top Tower installation, Microwave Antennae installation, Antenna Mounting bracket Installation, GSM antennae installation, Antenna re-orientation, Microwave Radio installation, Radio & Battery Cabinet Installation, Grounding wires & Plates installation.

Assigned PMI Project, Tower erection, Roof top Tower installation, Microwave Antennae installation, Antenna Mounting bracket Installation, GSM antennae installation, Antenna re-orientation, Microwave Radio installation, Radio & Battery Cabinet Installation, Grounding wires & Plates installation.

INFRATEL NETWORK INC. April 21, 2009 up to June 2, 2009

SENIOR RIGGER

Assigned VODAFONE Project New Zealand, Installation of Nokia BTS & RBS radios, Panel antennae, Coaxial cables, Groundings and Hard wares. Commissioning and Integration of RBS / BTS site.

EXI TELECOMS INC. October 21, 2008 up to Dec. 22, 2008

SENIOR RIGGER/TEAM LEADER

Assigned DIGICEL Project Papua New Guinea, Antenna installation, feeder cables, termination of Cable, connectors and 2G RBS radio installation.

Assigned DIGICEL SDH Project, Fabrication of Mono-pole Tower, Installation of Lattice / Self supporting tower, Installation of non penetrating tower and O&M.

JOHN CLEMENTS CONSULTANTS INC. October 12,2007 up to October 21, 2008

SENIOR RIGGER/TEAM LEADER

Assigned Ericsson NRO-PMO, Smart 3G Node B WCDMA project RBS 3107, Mini-link E transmission installation and O&M.

Supervised RBS 3206 installation, O&M, testing, commissioning and rectification of out-door / in-door installation.

Assigned Ericsson NID, Smart Telecom 3G WCDMA 850 Node B project .

Supervised WCDMA 850 3G Node B installation, O&M, testing, commissioning and rectification of out-door / in-door installation.

Assigned Ericsson NDI, supervised installation of Marconi equipment, in-door & out-door installation and Antennae.

TelicPhil NDTN March 2006 up to December 2006

SENIOR RIGGER

Assigned microwave radio maintenance, AGC check and antennae link of north to south Luzon.

Assigned microwave tower inspection, tower alignment, antenna reliability of TelicPhil microwave stations.

CTEL Telecoms Solutions March 2004 to March 2006

SENIOR RIGGER

Assigned installation of Ericsson RBS 2116, Antennae, 7/8 feeder cables, hard wares and accessories.

Assigned installation of Ericsson mini-link radio’s C & E family for Ericsson- Globe Telecoms 2.5G project.

Assigned Installation of Ericsson RBS 2206 Ericsson- Globe Telecoms up-grading project North Luzon.

TelicPhil NDTN February 2003 to February 2004

RIGGER/TEAM LEADER

Assigned microwave radio maintenance, AGC check and antennae link of north to south Luzon.

Assigned microwave tower inspection, tower alignment, antenna reliability of TelicPhil microwave stations.

Assigned fiber optic maintenance MCQC-NOCC, Western Visayas POI-Cebu (Stm 16) link.

Assigned transmission up-grading (10G) of NDTN microwave & fiber optic nationwide backbone project.

Alcatel Philippines September 2001 to January 2003

TEAM LEADER/RIGGER

Assigned installation of Alcatel SDH antennae and Cables on all relay and Cell site’s of SUN CELL Phase 1 project

Assigned installation Panel antennae, 7/8 feeder cables, hardwares and groundings on all SUN CELL Phase 1 project.

Exi Telecoms February 2000 to September 2001

TEAM LEADER/RIGGER

Assigned installation of Ericsson mini-link radio’s C & E family for Ericsson- Globe project phase 7B Mindanao.

Assigned termination of Transmission cables for mini-link C&E radio’s Globe project phase 7B Mindanao.

Assigned Installation of Ericsson RBS 1800, 1900, 2000, 2100 for Ericsson- Globe project phase 7B Mindanao.

Assigned installation of Davao-Zamboanga Microwave link Ericsson- Globe project phase 4 Mindanao.

August 1995 to February 2000

RCPI-BAYANTEL

TEAM LEADER/RIGGER

Assigned installation of SDH radio’s, antennae, EW-43 wave guide cables, Hardware and groundings.

Assigned installation of PDH radio’s, antennae, wave guide cables, hardwares and groundings. Assigned Tower erection on all Transmission Relay site nationwide.

SMART COMMUNICATIONS January, 1994 to June, 1995

SENIOR RIGGER

Assigned installation of Alcatel PDH microwave radio’s, antennae, wave guide cables, hardware and groundings.

Assigned installation and erection of Self Supporting Tower on Smart Relay Station,.

Supervised installation and erection of Guyed towers on Smart RBS/BTS Metro site’s.

March 1992 to January 1994

LIBERTY TELECOMS

TEAM LEADER/RIGGER

Assigned installation of Telletra Microwave radio’s, microwave antennae, wave guide cables, hardware and grounding.

Assigned installation of GE Trunking radio’s, antennae, Hardware and groundings

Supervised Fabrication and installation of Self supporting towers on relay stations.

EASTERN TELECOMMUNICATION PHIL. INC September 1991 to March 1992

TEAM LEADER/RIGGER

Assigned installation of SRT100 microwave radios, antennae, feeder cables, hardware and groundings.

Assigned fabrication Mono Pole Towers, mounting brackets, horizontal cable bridges, vertical cable ladders on special fast track projects.

1988 to 1989

FEBROE US BASE OPERATING SUPPORT CONTRACT

Diego Garcia B.I.O.T., FPO

ANTENNA MECHANIC

Assigned at project implementation, Transmitter site, Radar, RLPA and preventive maintenance at US communication Diego Garcia, B.I.O.T.

Assigned at project implementation, Receiver site, Rhombic, Radar and preventive maintenance at US communication Diego Garcia, B.I.O.T.

1984 to 1986

GHURMALLAH S. AL GHAMDI EST.

STEEPLEJACK/RIGGER

Assigned ARAMCO pipelines eastern province, installation of Microwave Antennae, radios, waveguide cables and Tower erection.

Assigned ARAMCO East / West pipelines, Installation of Microwave Antennae, radios, waveguide cables and Tower erection.

Assigned ARAMCO Iraqi pipelines, Installation of Microwave Antennae, Radios, waveguide cables and Tower erection..

Education

1967 to 1978

St. Michael’s Institute

Graduate

Elementary & High School

Personal

Birthdates : December 12, 1961

Sex : Male

Religion : Catholic

Civil Status : Married

Height : 5’ 9”

Weight : 175 lbs.

Character Reference

1. Engr. Henry T. Galingan President / General Manager TELICPHIL 3/F RCPI-Annex Bldg. 711 EDSA Cubao, Quezon City Philippines 1109 Tel. No. +63-917*******

2. Engr. Leonardo E. Blay Manager - Operation & Engineering Department TELICPHIL 3/F RCPI-Annex Bldg. 711 EDSA Cubao, Quezon City Philippines 1109 Tel. No. +639**-********

3. Engr. Danny M. Oliva Manager - Operation & Engineering Department ELECTROCOM Room 201, Prince tower 1 condominium, Salcedo village, Makati City Philippines Tel. No. 632-***-****

I certify that the above statements are true and correct to the best of my knowledge and belief

Bienvenido B. Guinto Jr.



Contact this candidate