Resume

Sign in

Project Manager Management

Location:
Scottsdale, Arizona, United States
Posted:
May 26, 2010

Contact this candidate

Brian Zavodnik, PMP

**** *. **** **. #* (602) ***-****

Mesa, AZ 85205 Email: cmg5h7@r.postjobfree.com

Summary of Skills/Qualifications

Over 20+ years experience in the Aerospace/Defense Project Management disciplines with respect to Scheduling and Earned Value Management System (EVMS) and a certified PMP. Have worked on over 30 development and production programs, and on teams developing responses to 20 RFPs(proposals) through my career. Strengths include extensive master scheduling functions at Program Office, Engineering and Manufacturing levels. Areas of expertise include Development and Maintenance of the Integrated Master Plan (IMP) and Integrated Master Schedule (IMS) IMP/IMS, Detailed Schedules, Monte-Carlo Analysis (Risk), Resource Loaded Network Scheduling, and Critical Path Analysis (CPM), to determine negative float conditions and corrective action plans, Critical Chain. This also includes Gantt/Pert Chart analysis, integrated network scheduling for horizontal/vertical integration, interface milestones and logic validation. Manage reporting for milestone metrics, manpower forecasting and availability modeling through resource driven schedules with costing capability. Additional experience includes baseline budgets (PMBs), Initial Baseline Reviews (IBRs), Joint Surveillance Reviews (JSRs), implementation and managing of Schedule and cost performance indices, EVM techniques, Program Planning, Work Breakdown Structure (WBS), Cost Performance Reports (CPRs), Cost Account Plans (CAPs), Cost Estimating, Rate Analysis, Cost Accounting Standards. Worked with Contracts, Subcontracts, DCMA, FAR Regulations, NASA and DoD Policies and Procedures. Lead the effort in preparation for various EVMS, DCMA, and internal surveillance audits.

Software Tools: Scheduling/Database/Programming Tools: Over 15 years extensive experience in Microsoft including Project 2003, 2007 and Project Server 2003, Primavera P3, P3e, 5.0 and 6.1, Open Plan Professional (OPP), Fast Track 9.0, Sure Trak, Artemis Project Views, Pert Chart Expert, Pert Master, Milestones Professional, @Risk, Risk Plus, E-reports, RMS/RMP, WGC, Livelink, SharePoint, Access, Excel and Visual Basic. Cost Tools: SAP, Cobra, MPM (Microframe Project Manager 3.0), Artemis Cost Views, WinSight, Crystal Reports.

Professional Experience

December 2009 - Present

Honeywell Corporation – via Lewis & Fowler Consulting, Glendale, AZ

Position: Senior Master Scheduling/EVMS Consultant

Advise, develop and maintain detail as well as a 10,000 line IMS on all elements of the Nine Billion Dollar ORION program with emphasis in Engineering and the PMO to proactively support CAM/IPTs (Integrated Product Teams) with Hardware/Flight Software and provide any metrics/reporting for the Program Office on a fully Earned Value (EVMS) program . Provide IMP/IMS development and analysis of integrated schedules, resource planning, budgets, and current performance and program forecasts. Track and assess program progress, perform continuous risk management and recommend strategies to adjust to proposed program changes. Closely follow financial status, assess performance and establish future budget requirements. Analyze contract requirements and work closely with contracting staff to provide suitable, timely and accurate contract modifications. Plan, lead, participate in and track actions resulting from program reviews (PMRs). Develop schedule structures to ensure horizontal and vertical traceability of integrated schedules. Ensure an accurate, and updated WBS and Period of Performance Alignment (Cost/Schedule) on a per cycle basis. Schedule regular status and working meetings with each engineering group to ensure timely and 100% schedule integrity as well as preparation for various higher level meetings, audits, etc. Extensive usage of Microsoft Project 2003, 2007, Open Plan Professional, COBRA, Microsoft Access and VB/VBA for automation purposes and the Microsoft Office 2007 Suite.

December 2008 - April 2009

General Dynamics – AIS Division via Contract Professionals Inc., Scottsdale, AZ

Position: Senior Scheduling/Planning Consultant

Master Scheduling Consultant working with Microsoft Project and Open Plan to develop the Integrated Master Schedule (IMS) within an EVMS environment to develop metrics and provide analysis on the GPS III program. Worked with Lockheed Martin (Prime Contractor) and with the internal CAMs and Deputy Program Manager to manage and mitigate negative float and establish work around plans in conjunction with with developing the next rolling wave planning phase from PDR through CDR. Proactively was the Master scheduler for the current rolling wave schedule that was in place and was responsible for all of the typical roles and responsibilities of that position, including, Cost/Schedule Status, metrics, PMR preparation, risk analysis/mitigation. Directly held daily meetings with the PMO, most specifically with the Program Manager, DPMO, IPTs/CAMs, REAs, etc for schedule development, or with respect to the master schedule position, typically one-on-one real time interfacing. Other activities included incorporation of ECPs, BCRs, etc.

August 2008 – November 2008

Raytheon Corporation – Missile Systems Division via Geologics Consulting Corporation, Tucson, AZ

Position: Senior Scheduling/Planning Consultant

Provided RAM Block 2 Program as a Master Scheduling Consultant, providing hands-on experience working with Microsoft Project to improve the Integrated Master Schedule (IMS) as well as the individual detail level schedules, within the confines of EVMS. Responsible for new process which led to reduction of all negative float scenario’s which included resource issue resolution, duration analysis and risk review. Utilized the Raytheon patent approved RPM Scheduling/Planning Tools that run within the Microsoft Project 2003 Environment which automates analysis such as cost and Earned Value exporting, path traceability and scorecard metrics. Also worked on the HDD Proposal using Open Plan for submitting an RFP and Monte-Carlo based schedule which aligned with cost data period of performance (POP).

April 2005 – May 2008

Northrop-Grumman Corporation Space Technologies Division, Redondo Beach, CA

Position: Senior Scheduling Manager/Project Manager

Provide Senior Scheduling (EVMS) Management, systems programming and developing IMP/IMS. Role included devising and implementing a strategy to effectively transfer schedules to our prime contractors, as well as receive schedules from our subcontractors on several multi-billion dollar programs. Designed a strategy to segregate integrated schedules so that the user community could benefit from multi-user access with record by record usage through the master file. Master Scheduling included integrating detailed schedules to develop a fully integrated IMS on large development programs within the Space Technology Division and developing Metrics/Customer reporting. Daily activities include managing staff, reporting to the customer and the Program Office schedule related issues. Able to develop and analyze schedules under pressure in order to complete deadlines. Automation efforts improved efficiency through custom programming using Visual Basic for Applications within the MS Project and Excel. Implemented systems and processes throughout various programs using Primavera 6.1 and Open Plan on various programs. SSBI, DoD Clearances required.

August 2001 - April 2005

Raytheon Corporation Space and Airborne Systems Division (SAS), El Segundo, CA

Position: Scheduling/Project Manager

Supported various multi-billion dollar Radar and Electro-Optical Programs & Proposals for various detailed and IMS Development and Maintenance.. Proactively performed in a Lead/Master Scheduler capacity to facilitate detail/summary level planning and scheduling via Microsoft Project. Developed macros using VBA to help efficiency for scheduling processes and reporting. Work also included: Earned Value reporting, milestone metrics, buffers, network and critical path analysis, Monte Carlo Analysis, Risk analysis, CAM schedule status, and managing exchange milestones. Helped to prepare for various audits including IBRs, Program Reviews, DCMA Audits. SSBI, DoD Clearances required.

December 1998 - August 2001

Boeing Space and Communications via Tim Wallender and Assoc. - El Segundo, CA

Position: Master Scheduler/Consultant

Supported PMO and Engineering function on various multi-billion dollar commercial and military Satellite Programs including Joint Strike Fighter Proposal (F-35). Created and Maintained Program Schedules via Microsoft Project and provided cost/schedule integration for various Integrated Product Teams (IPTs) including System Engineering, Integration and Test (I&T), Design, Software, etc… within the Program Planning and Controls (PP&C) function. Integrated, analyzed and reported program performance against plan (EVMS) and supported gate process. Provided analysis of program status, monitored and maintained baseline control, developed automated enhancements for streamlining scheduling processes. Analyze procedures, control systems and work measurements to provide continuous improvement for effective planning and cost control. Generated Program Master Schedule and identified Giver/Receiver relationships and performed Risk Mitigation and analysis (SRA). EVMS included ETCs, EACs, VACs and SPI/CPI/TCPI analysis related to schedule delays.

October 1994 - December 1998

Boeing Corporation - Rocketdyne Divison, Canoga Park, CA

Position: Master Scheduler/Senior Programmer – International Space Station Program

Senior Programming position which included using the Artemis 9000EX system to integrate, analyze, and provide IPT’s and Program Management with summary as well as detailed analysis on program health. Used MS Project to develop lower level schedules for various Integrated Product Teams within the International Space Station Program. Provided EVMS analysis of program status, monitored and maintained baseline control. Provided program management reports for various metrics, queries, and real-time feedback on different “what-if” and “was/is” analysis for mitigating negative float.

February 1992 - October 1994

Northrop-Grumman Corporation - West Complex, El Segundo, CA

Position: Engineering Planner/Scheduler/Manufacturing Planner/Scheduler - F/A 18 E/F Program

Through programming requirements using the Artemis 9000EX system, the schedule was to integrated, analyzed, and provided IPT’s and Program Management with detailed analysis on program health. Usage of MRP, Artemis, Primavera, in the manufacturing environment to set-up a system that ensured the manufacturing need dates we’re being supported by the engineering deliveries. Mismatches to these we’re presented, and work-around plans were coordinated to ensure successful on-time completion dates.

PRIOR AEROSPACE WORK EXPERIENCE (1983-1992) AVAILABLE UPON REQUEST

Education

University of California - Irvine, CA: Graduated: 1990 BA Degree - BA Social Sciences/Economics

Rolling Hills High School - Rancho Palos Verdes, CA: Graduated 1983 - Diploma

Special Awards and Certifications

Dec 2008 PMP Certified

2004-Present Member of Project Management Institute (PMI)



Contact this candidate