Post Job Free
Sign in

Engineer Power Plant

Location:
Houston, TX, 77521
Posted:
June 14, 2012

Contact this candidate

Resume:

Jimmy R. Wright

**** *** ****** **.

Baytown, TX. 77521

832-***-****

****************@*****.***

OBJECTIVE

To secure a wireless or wire line installation position for a communications carrier in the southwest.

SUMMARY OF QUALIFICAITONS

1 Twenty five years’ experience in the wireless and wire line Telecom Industry.

2 Responsible for:

o New turn ups

o Orders going through local switches

o Maintenance and installation of DSO’S, DS1’S, DS3’S, OC3’S, 12’S,48’S

o Installation of Fiber Optic Node with Cisco forerunner

o Drafting prints for installation packages

3 Supervision of:

o Switch installation: Northern Telecom10, 100, 200, 500 plus all related equipment

o Transmission equipment installation: T1 channel banks and fiber optic equipment

4 Local Number Portability matters; working with technicians, sales, engineer, customers, and vendors to insure LNP cuts went as smoothly as possible.

5 Installation of power plant including rectifiers, batteries, running and sewing power cable up to 750 mcm, HTAP, CTAP, and any related ac including light fixtures and outlets.

WORK HISTORY

Teksystems 6/11 to 11/11

Lead Contractor on walgreens and h.e.b. projects

installed and tested hewlett packard photo kiosks for walgreens

changed out card readers at all registers at heb.

Teksystems 1/11 to 6/11

Lead Contractor for eltek power systems

installed batteries and rectifer bay for city of houston radio towers.

Revak 08/07 to 12/10

ON Site IT Technician.

1 Responsible for Revak’s network including Intertel PBX at firms120 offices.

2 Responded to trouble tickets that came in from any of the offices.

3 Trouble shooted networking or hardware issue and brought to resolution.

4 Equipment handled included Cisco Routers, Linksys, ATT Switches (24 and 48 port), PCs, and other office equipment.

5 Maintained HVAC, power, fire detection and suppression system

6 Wired cabinets per specifications on turbine skids for Exxon,Shell,and Dow Chemical.

Tek-Systems 01/07 to 07/07

Installer

5 Install and turned up Ericsson equipment at ATT cell sites.

6 Installed 3107 and 3207 cabinets.

7 Installed and turned up power to the cabinets.

8 Installed and turned up T1 lines.

9 Installed all associate cabling.

10 Equipment types included racks associated with UMTS and LTE.

ADEX Corporation Atlanta, GA. 10/06 to 01/07

11 Facility test and turn up technician

12 Installing and configuring Cisco MGX 8880 and BTS 10200 switch, Cisco Centest CT 6500 and Tellabs 5500 DACs at Comcast facility.

13 Responsible for testing and turn up of DS3’S, T1’S, Trunks.

Butler Telecom/Tek Systems Houston, TX 2/05-9/06

Level III Installer

1 Responsible for installation, testing, and turn up of Nortel and Nokia radios at Cingular and Sprint BTS sites in and around Houston metropolitan areas

2 Installed new battery strings.

Birch Telecom Houston, TX 1/03-2/05

Field Engineer III

1 Responsible for installation of T1 Routers, DSL, ISDN, and troubleshooting of Lucent AD switches at customer premises.

Cable and Wireless, Inc. Houston, TX 4/00-1/03

Level III Technician

2 Responsible for new turn ups and maintenance of DSO’S, DS1’S, DS3’S, OC3’S,OC- 12’S, 48’S, Nortel 192 Optera, Tellabs Titan 5500 3/1 DACS, Fiber Optic Node with Cisco Forerunner and Nortel Core Director Routers. Ericsson switches

MCI WorldCom Houston, TX. 5/97-6/99

S.P.O.C.

3 Responsible for all orders going through local switches, and all LNP matters. Worked with technicians, Sales, customers, and vendors to insure LNP cuts went as smoothly as possible.

MCI WorldCom Houston, TX 5/92-5/97

Lead Contractor

4 Responsible for installation of all Fiber Equipment including; Fujitsu FLM 150, 600, 2400, Alcatel OC-3, OC-12, OC-48, and OC-192s.

GTE of the Southwest Houston, TX 2/82-4/92

Level III Installer

5 Responsible for installation of transmission equipment such as T1 Channel Banks, and fiber optic equipment.

6 Installation of switches such as Northern Telecom 10, 100, 200, and all related equipment.

7 Installed the GTD5, switch in Mont Belleview, Texas. The first of its kind for GTE of the Southwest.

Education

1 GED united states army 1976

2 Technical schools include

3 Basic Telephony

4 AC/DC Theory

5 Digital Electronics

6 Advance Digital Electronics

7 Centest

8 Ocptical Carrier- Fujitsu-Alcatel-Nortel



Contact this candidate