CURRICULUM VITAE
Roberto C. Anoc Jr.
Nationality Filipino
Date of Birth 16 February 1958
Education Bachelor of Science in Architecture
University Of Pangasinan, (Graduated October1979)
Home Address Block 6, Lot 13 Sta. Barbara Villas 2,
Silangan, San Mateo, Rizal, Philippines
Contact Numbers Mobile: +601********
E-mail Address ***.****@*****.***
SKILLS AND QUALIFICATIONS
More than (20) years experienced in the design and engineering work for Oil and Gas Projects (Onshore and Offshore) Crude and gas Gathering stations, Pipelines, Flowlines ,had worked in Saudi Arabia, Qatar, Brunei ,Tripoli, Libya and Malaysia
Ten (10) years experience as Designer/Sr. Draftsman for various Water Supply, Sewerage, and Plumbing for High Rise Bldgs. and infrastructure projects.
With knowledge in the use of AutoCAD 2011,PROCAD 3D Smart Modeler, CADWorx Plant 3D, AVEVA PDMS
Familiar with Saudi Aramco Engineering Standards & Shell Design and Engineering Practice(DEP)
With knowledge in Equipment and piping modeling using PDMS and CADWORKX 3D
PROFESSIONAL EXPERIENCES
September 2011 – Present
TOYO Engineering and Construction SDN, BHD., Kuala Lumpur, Malaysia
SR. Piping Designer: Project: BIO-ETHANOL PLANT, Juhor Bahru, Malaysia
Study and preparation of plot plan and equipment layout, pipe loading at rack and preliminary routing of pipes. Attend coordination meeting with clients and other discipline involve in the project. Prepared piping layout using PDMS..Assign drawings to be produce to Piping designers and cad operators, Checking of drawings. Prepared layout of under ground piping and fire water system.
Project:PIPING SUPPORT ADEQUACY CHECKS FOR MNLG 1&2(PETRONAS, BINTULU MLNG PLANT)
Prepared Piping supports, isometric piping details and update Piping general arrangements, attend coordnations meeting with clients.
March 2011 – August 2011
CPD Engineering Company, Pasig City, Philippines
Lead Piping Designer: Projects Completed: PETRON BATAAN REFINERY (Propylene Storage and Loading Facilities), PILIPINAS SHELL PETROLEUM CORPORATION (Tabangao Depot Expansion Project)
Preparing engineering design of piping systems related to the assigned projects including plot plan, piping layouts, isometrics, pipe supports as per applicable industry codes and standards. Checking of drawings and prepare material take-offs Attend inter-discipline and client coordination meetings. Preparation of Engineering manhour requirements, Undertakes site visits to identify tie-in locations.
April 2007 – February 2011
AMEC/MAPEL-Libya, Tripoli, Libya
Piping Designer, seconded to Zueitina Oil Company (Formerly Occidental Petroleum of Libya) Projects and Technical Services Department.
• Do piping layout study, Piping General Arrangement Drawings, Piping Isometrics, pipe supports using AutoCAD on company in house projects, preparation of material take-offs. Identify Tie-In points and pipe routing with Construction and Fabrication group during installation.
• Carry out piping and P&I Diagrams as built works on Production and Gas Plant Facilities.
• Do piping layout, Piping Isometrics, pipe supports using AutoCAD of wellhead hook-ups and tie-ins to production and test header, preparation of material take-offs.
• Responsible for day to day activity of Concession 103A Design and Drafting Office.
• Field verify tie-in locations and prepared layout study and finalized general arrangement and isometric piping details for LP compressor project.
• Prepared well head piping layout for gas lift and water injection for E Lease gathering station.
• Responsible for replacement of C lease production and test manifold and well inlet, produce necessary piping arrangement ,isometric piping detail and pipe supports.
• Responsible for Piping .design and drafting of additional Separation train at 103A
• Prepared proposed routing of flowlines from wellheads to production manifold.
• Attend weekly Operations meetings.
• Manage Drawing Files for Concession 103A
• Prepare conceptual and detailed architectural drawings of 103A airport lounge ,and Insrtument workshop buildings
July 2001 – March 2007
AMEC/MAPEL-Libya, Tripoli, Libya
Piping Designer, seconded to WAHA OIL COMPANY Engineering Department, Design and Drafting Section
Prepares Plot Plan, piping general arrangement, isometric piping details, pipe supports using AutoCAD on company in house projects.
Do piping as built prior to start of design work.
Prepares material take-offs.
Do Piping and P&I Diagram as- built work for Gas Oil Separator Plant and update drawings on Cad
September 2000 – July 2001
AMEC/ King Wilkinson Saudi Arabia Ltd.
Piping Designer,
Project Completed: Berri NGL-Ethane Recovery Plant
Prepared Design layout of Piping general /area arrangement drawings of offsites facilities, Arrangement of additional equipments. Do isometric piping details sketches; prepare material take-offs, checking of drawings prepared by Cad operators and verification of tie-ins.
April 1998 – June 2000
Baharuddin &Associates Consulting Engineers, Brunei Darussalam
Sr. Mechanical/Piping Designer,
Projects Completed: Brunei Shell Offshore Projects
• Champion 7 Debottlenecking Project
• Champion 3 Deep Gas Development Projects
• Offshore Well Tie-Ins
Duties and Responsibilities includes preparation of equipment layout, do piping layout study, verification of tie-ins, preparation of isometric piping detail and pipe support sketches, prepared material take off, checking of piping drawings done by Cad Operators, attend clients and inter- discipline meetings. Review equipment vendor drawings and answer queries of fabrication contractor.
Projects Completed: Brunei Shell Onshore Projects
• Muara Jetty Loading and unloading Facilities
• Seria Crude Oil Terminal Drainage Segregation Project
• Muara Firewater System
Duties and Responsibilities include preparation of Piping layout, plot plan, equipment layout drawing, Isometric piping details and pipe supports. Checking of drawings, attend clients and inter- discipline meetings.
January 1998 – April 1998
J&S Consultancy Services, Manila, Philippines
Piping Designer,
Project Completed: Formosa Plastics (Taiwan) Butadiene Extraction Unit (BDU4)
Duties and Responsibilities includes preparation 0f design Layout of piping general arrangement, Isometric piping details and pipe supports and checking of drawings.
June 1996 – December 1997
Brown & Root Energy Services, Doha, Qatar
Piping Designer,
Projects Completed: Dukhan Arab D Gas Recycling Plant, Messaieed Storage
And Export Facilities
Duties and Responsibilities includes Design and drafting of Piping General Arrangement, plot plan equipment layout drawing, Isometric piping details and pipe supports, site verification of tie –ins at various locations and prepare design layout. Prepared piping arrangement and isometrics of Scraper Launcher and receiver and wellhead piping using AutoCAD. Review Equipment Drawings.
October 1995 – June 1996
Fluor Daniel Inc., Manila, Philippines
Sr. Piping Designer,
Projects Completed: EQUATE Petrochemical Complex (Kuwait)
Duties and Responsibilities includes preparation of Design layout of piping general arrangement, plot plan, Isometric piping details and pipe supports of glycol storage facilities and Demineralized Water using CAD Intergraph. Checking of drawings and prepare material take-offs.
January 1990 – June 1995
Arabian Consulting Engineering Center (ACEC) an affiliate of Stone & Webster Eng’g. Corp., Al-Khobar, Saudi Arabia
Piping Engineer: Projects Completed are Fluid Catalytic Cracking Unit (FCCU) Jeddah Refinery, Polypropylene Catalyst Manufacturing Plant (SABIC), Saudi Strategic Storage Program Facilities, Abqaiq AXL Segregation, Ibn Sina Feedstock Pipeline, Abu Safah Metering Upgrade, Platformer and Refiner Unit (BAPCO) Abqaiq and Riyadh Refinery Firewater System, Petrokemya Feedstock Pipeline, Flowline Projects.
Duties and Responsibilities include preparation of Design layout of piping general arrangement, plot plan, Isometric piping details and pipe supports. Checking of drawings and prepare material take-offs. Prepared plan and profile of pipelines, piping arrangement and isometric details at tie-ins and scraper launcher/receivers. Attend inter-discipline and client coordination meetings. Review Vendor Drawings.
June 1988 – January 1990
DCCD Engineering Corp. Manila, Philippines
Sr. Draftsman,
Projects Completed: Local Water Supply Projects, High Rise Commercial and
Residential Plumbing Projects
Duties and Responsibilities include preparation of Design layout of plumbing and drainage system.
Drafting of Architectural and Mechanical drawings of pump house, plan and profile of pipelines.
May 1987 – June 1988
M. Al-Mojil Group, Dammam, K.SA.
Sr. Draftsman,
Projects Completed: ASSIR Power Plant and Water Desalination Project
Prepared modification drawings of off plot piping, boiler and instrument air, fuel oil lines and firewater system. Drafted isometric piping details of piping modified at site and as-built drawings.
February 1982 – May 1987
DCCD Engineering CORP., Manila, Philippines
Draftsman,
Projects Completed: Metro Manila Sewerage Project, Eastern Samar Road Project.
Duties and Responsibilities includes drafting of Architectural, Structural and Mechanical Drawings of pump stations and lift stations, plan and profile of sewerage pipeline, roadway plan and profile, structural drawings of bridges and concrete culverts.
May 1980 – February 1982
ACOJE Mining Company. Manila, Philippines
Draftsman,
Projects Completed: Office Buildings and Staff Houses
Duties and Responsibilities includes drafting of Architectural and Structural Drawings, prepared material take –off and cost estimates.