Name : Jhon HitaSaragih Place /
date of birth : Tebing Tinggi, 04 Maret 1968
Nationality : Indonesia
Proposed position: Snr Electrical Engineer, Maintenance Supt
Contact address: 082*********
Email address : *********@*****.***.**;***************@*****.***
Education / degree :
S1 Teknik Elektro, Sekolah Tinggi Teknik Jakarta 1988.
Summary of
qualification: Over Twenty (20) years’ experience Offshore and Onshore for Constructions as Mechanical; Piping/Pipeline; Civil; Structure; Process; Electrical / Instrument; Engineering Design; Construction; Pre-Commissioning; Commissioning; Start-up & Maintenance for Onshore and Offshore Oil and Gas Production Facilities Project and Petrochemical Plant; Able to work within a diverse cultural environment. Familiar with relevant government regulation on oil and gas industries. Organizing manpower staff and supervising, installation and commissioning. Know of all relevant engineering & construction codes and standards. Involved in Project Engineering Control, Procurement Planning and Bidding, Tracking Progress and Productivity During Fabrication and Construction, Project Monitoring, Construction Preparation, such as
: Manpower Recruitment, Sub Contractor’s Negotiation and Construction, Engineering Design Coordination, Detail design and Construction
.
Work experiences:
March 2019-April2024. PT.Prosys Bangun Persada,PMC, Lead Electrical Engineer
OPEN ACCES REFINERY UNIT VII KASIM PT. PERTAMINA (Persero)
With areas: Jetty; 4 units Tank with capacity 110.000 barrel each tank; Pumps station,
16” Pipe line 1.6 Km long; Marine loading arm; Fire water pumps; Metering station
Client: PERTAMINA Refinery Unit VII Papua.
Responsibility:
Lead the project team Electrical
Direct and manage project development, Engineering Detail Drawing; Procurement; Construction; Pre-Com, Commissioning; Start Up.
Monitor progress of the development of engineering design deliverables all disciplines and propose corrective actions to line management in the event of potential schedule overruns
Provide leadership, assistance and support to the project team
Prepare technical and progress reports to support flow of key information to management and joint venture partners to assist in decision making
Define project scope, goals and deliverables that support business goals in collaboration with senior management
Contribute to development of technical and management process
and systems
Undertake the appropriate administration relating to invoice payments in a timely manner (e.g time sheet approval; milestone sign-off etc.). Negotiate price for additional job order to Main contractor/Vendor.
Define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system
Lead and demonstrate the highest HSE Behaviours, HAZOP; HAZID
Ensure compliance with health, Safety and Environment Policy.
Develop a professional working relation with colleagues, supervisor and Stakeholders
Plan and schedule project timelines and milestone using appropriate tools.
Work harmoniously in a diverse multicultural work environment with good communications skills
Tract project milestone and deliverable.
Co-ordinate with the Operations representative in the development of the operations Assurance Plan that describes the operational activities, assurance requirements and deliverables, including plan for readiness for hand over and commissioning and approve same.
Establish the process for the development of operating manuals and ensure that the process is implemented in a quality and timely manner.
Manage the contract with contractor for the provision of technical specialists to satisfy the detailed design and technical assurance requirement.
Provide input to project progress reporting
Manage all technical third party studies
Report to the Project Manager. Etc.
August 2016-Feb 2019 PT. Wasamitra Engineering Jakarta, Senior Electrical Engineer
2.Pertamina Geothermal Power Plant Project 1x 65 MW ( Generator Stem Turbine 65 MW; GCB 13,5 KV; Generator Step up Transformer 13,5 KV; 150 KV Switchyard; Unit Auxiliary Transformer 13.5 KV; Station service Auxiliary Transformer 6.3 KV;MV Switchgear 6.3 KV; MDB 400 V; UPS; Cooling Tower; Fire Station; Hot Water Pump 630 KW; Vacuum Pump 460 KW; Motor pump cooling Tower 160 KW; Compressor; DCS}; FCRS (Fluid Collection and Reinjection System ) as Cluster 1 with 8 ea- Wellheads; Cluster 6 with 3 ea- Wellheads; Cluster 9 with 2 ea- Wellheads; Cluster A reinjection with 3 ea- Wellheads;
Client: Pertamina Geothermal
Responsibility:
Lead the project team Electrical
Direct and manage project development, Engineering; Procurement; Construction; Commissioning; Start Up; Maintenance.
Monitor progress of the development of engineering design deliverables all disciplines and propose corrective actions to line management in the event of potential schedule overruns
Provide leadership, assistance and support to the project team
Prepare technical and progress reports to support flow of key information to management and joint venture partners to assist in decision making
Define project scope, goals and deliverables that support business goals in collaboration with senior management
Contribute to development of technical and management process
and systems
Undertake the appropriate administration relating to invoice payments in a timely manner (e.g time sheet approval; milestone sign-off etc.). Negotiate price for additional job order to Main contractor/Vendor.
Define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system
Lead and demonstrate the highest HSE Behaviours, HAZOP; HAZID
Ensure compliance with health, Safety and Environment Policy.
Develop a professional working relation with colleagues, supervisor and Stakeholders
Plan and schedule project timelines and milestone using appropriate tools.
Work harmoniously in a diverse multicultural work environment with good communications skills
Tract project milestone and deliverable.
Co-ordinate with the Operations representative in the development of the operations Assurance Plan that describes the operational activities, assurance requirements and deliverables, including plan for readiness for hand over and commissioning and approve same.
Establish the process for the development of operating manuals and ensure that the process is implemented in a quality and timely manner.
Manage the contract with contractor for the provision of technical specialists to satisfy the detailed design and technical assurance requirement.
Provide input to project progress reporting
Manage all technical third party studies
Report to the Site Manager. Etc.
June 2015-Feb 2016 PT.Raga Perkasa Ekaguna EPC-Snr Electrical Engineer
1.Onshore Receiving Facilities (ORF) Oil & Gas project PDM PERTAMINA Bekasi (Indonesia Oil and Gas) Construction; Pre-Commissioning; Commissioning with: Production separator; Chiller package; Condensate stabilization unit; Gas metering; Crude storage tank; Crude oil metering; pipeline distribution 10”; Fuel gas system; Produce water system; Vent & Flare system; Fire water system; Service water system; Instrument air system and Utility air system; Power system as 3 units Gas Engine Generator 1850KVA ; 2 Unit Gas Compressor; 1 unit Diesel Engine Generator 810 KVA; 2 units Switchgear; UPS; HVAC; 3 unit MCC; CPP; 2 Unit Metering; 8 unit tanks station; Fire pumps; ICSS; 6”Pipeline long16 Km . Provide as Pre-Comm and Commissioning Procedures; Startup Procedures and to be approved by client; Prepare leak test procedures and folders Lead Machinery Solo tests run; Consinyering meeting with engineering team and subcontractor; Progress schedule; Problem solving; Etc
2. Senoro LNG Jetty Topside Facilities JOB PTM/Medco Tomori Sulawesi project (Offshore project) and 16 “pipeline distribution gas 12 Km; Construction; Pre- Commissioning; Commissioning; Start up; Provide as Precomm and Commissioning Procedures; Startup Procedures and to be approved by client;
Client: Onshore Receiving Facilities (ORF) Oil & Gas project PDM PERTAMINA
Responsibility:
Lead the project team Electrical
Direct and manage project development, Engineering; Procurement; Construction; Commissioning; Start Up; Maintenance.
Monitor progress of the development of engineering design deliverables all disciplines and propose corrective actions to line management in the event of potential schedule overruns
Provide leadership, assistance and support to the project team
Prepare technical and progress reports to support flow of key information to management and joint venture partners to assist in decision making
Define project scope, goals and deliverables that support business goals in collaboration with senior management
Contribute to development of technical and management process and systems
Undertake the appropriate administration relating to invoice payments in a timely manner (e.g time sheet approval; milestone sign-off etc.). Negotiate price for additional job order to Main contractor/Vendor.
Define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system
Lead and demonstrate the highest HSE Behaviours, HAZOP; HAZID
Ensure compliance with health, Safety and Environment Policy.
Attendance FAT for Gas Engine Generator and Diesel Engine Generator; Switchgear; MCC; Transformer; Wellhead Control Panel; PLC; Power cables, Metering skid, Etc.
Develop a professional working relation with colleagues, supervisor and Stakeholders
Plan and schedule project timelines and milestone using appropriate tools.
Work harmoniously in a diverse multicultural work environment with good communications skills
Tract project milestone and deliverable.
Co-ordinate with the Operations representative in the development of the operations Assurance Plan that describes the operational activities, assurance requirements and deliverables, including plan for readiness for hand over and commissioning and approve same.
Establish the process for the development of operating manuals and ensure that the process is implemented in a quality and timely manner.
Manage the contract with contractor for the provision of technical specialists to satisfy the detailed design and technical assurance requirement.
Provide input to project progress reporting
Manage all technical third party studies
Report to the Site Manager. Etc.
Jul 2014 - June 2015 PT.Prosys Bangun Persada – Project Manager
1.Gas Distribution Pipe Line16”; 13,5 Km with metering system Project IPP Millenium Fase 2 Tangerang and Bekasi Power Gas Distribution Pipe Line 16”; 6 Km with metering system
Client: MINISTRY OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA
Responsibility:
Lead the project team
Direct and manage project development, Engineering; Procurement; Construction; Commissioning; Start Up; Maintenance.
Monitor progress of the development of engineering design deliverables all disciplines and propose corrective actions to line management in the event of potential schedule overruns
Provide leadership, assistance and support to the project team
Prepare technical and progress reports to support flow of key information to management and joint venture partners to assist in decision making
Define project scope, goals and deliverables that support business goals in collaboration with senior management
Contribute to development of technical and management process and systems
Undertake the appropriate administration relating to invoice payments in a timely manner (e.g time sheet approval; milestone sign-off etc.). Negotiate price for additional job order to Main contractor/Vendor.
Define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system
Lead and demonstrate the highest HSE Behaviours, HAZOP; HAZID
Ensure compliance with health, Safety and Environment Policy.
Develop a professional working relation with colleagues, supervisor and Stakeholders
Plan and schedule project timelines and milestone using appropriate tools.
Work harmoniously in a diverse multicultural work environment with good communications skills
Tract project milestone and deliverable.
Co-ordinate with the Operations representative in the development of the operations Assurance Plan that describes
the operational activities, assurance requirements and deliverables, including plan for readiness for hand over and commissioning and approve same.
Establish the process for the development of operating manuals and ensure that the process is implemented in a quality and timely manner.
Manage the contract with contractor for the provision of technical specialists to satisfy the detailed design and technical assurance requirement.
Provide input to project progress reporting
Manage all technical third party studies
Report to the General Manager. Etc.
Dec 2012-Jun 2014 Manhattan Kalimantan Investment Ltd (Singaporean Oil Company), Through PT.Sinergi Mitra Jaya Abadi (PMT) – Lead Engineer
1.Well Area; 2. CPP Bayan Gasplant; 3. Receiving Facility Binalatung; 4.Lingkas terminal; 5. Trunk line pipe size 6” for gas and 3” for Condensate 13,5 Km long and Flow line 6” for gas and 2” instrument air line 1.5 Km long Provide FEED Detail engineering; Lead Engineering team; Consinyering meeting with Engineers and subcontractor; Procurement; Construction; Commissioning; Start up; Maintenance. Produced Gas and condensate
2.Gas metering; Crude storage tank; Crude oil metering; 6” Pipe line distribution 15 Km offshore and onshore); Tanks station area; Metering area; Wellhead area; Plant support Facilities area, Flowline wellhead 3”Pipe line 6 Km; 2 units Gas engine Generator 400 KVA and 1 unit Diesel Engine Generator 300 KVA; F&G Panel; DCS; ESDP:WHCP; Consinyering meeting with MIGAS(Indonesia Rep Oil and Gas) and Contractor; Progress schedule; Problem solving; Etc
Client: Manhattan Kalimantan Investment Ltd
Responsibility:
Lead the project team
Direct and manage project development, Engineering; Procurement; Construction; Commissioning; Start Up; Maintenance.
Monitor progress of the development of engineering design deliverables all disciplines and propose corrective actions to line management in the event of potential schedule overruns
Provide leadership, assistance and support to the project team
Prepare technical and progress reports to support flow of key information to management and joint venture partners to assist in decision making
Define project scope, goals and deliverables that support business goals in collaboration with senior management
Contribute to development of technical and management process and systems
Undertake the appropriate administration relating to invoice payments in a timely manner (e.g time sheet approval;
milestone sign-off etc.). Negotiate price for additional job order to Main contractor/Vendor.
Define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system
Lead and demonstrate the highest HSE Behaviours, HAZOP; HAZID
Ensure compliance with health, Safety and Environment Policy.
Attendance FAT for Gas Engine Generator and Diesel Engine Generator; Switchgear; MCC; Transformer; Wellhead Control Panel; PLC; Power cables, Metering skid, Etc.
Develop a professional working relation with colleagues, supervisor and Stakeholders
Plan and schedule project timelines and milestone using appropriate tools.
Work harmoniously in a diverse multicultural work environment with good communications skills
Tract project milestone and deliverable.
Co-ordinate with the Operations representative in the development of the operations Assurance Plan that describes the operational activities, assurance requirements and deliverables, including plan for readiness for hand over and commissioning and approve same.
Meeting at SKK Migas for progress and Dirjend Migas for licence of Metering system and certificate for SKKP and SKPI projects
Establish the process for the development of operating manuals and ensure that the process is implemented in a quality and timely manner.
Manage the contract with contractor for the provision of technical specialists to satisfy the detailed design and technical assurance requirement.
Provide input to project progress reporting
Manage all technical third party studies
Report to the Project Manager. Etc.
Jan 2012-Dec 2012 PT.Adhikarya Div O&G –Snr Electrical Engr
1.FEED Donggi/Senoro LNG projects & FEED Refinery RFCC Cilacap Power plant; Lead Engineering teams, Consigner Ing meeting with Engineers.(Engineering Oil and Gas Div Company)
Client: LNG projects & FEED Refinery RFCC Cilacap Power plant
Responsibility:
Lead the project team Electrical
Direct and manage project development, Engineering; Procurement; Construction; Commissioning; Start Up; Maintenance.
Monitor progress of the development of engineering design deliverables all disciplines and propose corrective actions to line management in the event of potential schedule overruns
Provide leadership, assistance and support to the project team
Prepare technical and progress reports to support flow of key information to management and joint venture partners to assist in decision making
Define project scope, goals and deliverables that support business goals in collaboration with senior management
Contribute to development of technical and management process and systems
Undertake the appropriate administration relating to invoice payments in a timely manner (e.g time sheet approval; milestone sign-off etc.). Negotiate price for additional job order to Main contractor/Vendor.
Define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system
Lead and demonstrate the highest HSE Behaviours, HAZOP; HAZID
Ensure com**Develop a professional working relation with colleagues, supervisor and Stakeholders
Plan and schedule project timelines and milestone using appropriate tools.
Work harmoniously in a diverse multicultural work environment with good communications skills
Tract project milestone and deliverable.
Co-ordinate with the Operations representative in the development of the operations Assurance Plan that describes the operational activities, assurance requirements and deliverables, including plan for readiness for hand over and commissioning and approve same.
Establish the process for the development of operating manuals and ensure that the process is implemented in a quality and timely manner.
Manage the contract with contractor for the provision of technical specialists to satisfy the detailed design and technical assurance requirement.
Provide input to project progress reporting
Manage all technical third party studies
Report to the Site Manager. Etc.
Jan 2011-Dec 2011 PT.Singgar Mulia- Snr E&I Engineer
1.Total E&P (Brown Field) Balikpapan East Kalimantan and Premier Oil Gajah Baru (Green Field) Batam
Client: Total E & P; Premier Oil
Responsibility:
Lead the project team E&I
Direct and manage project development, Engineering; Procurement; Construction; Commissioning; Start Up; Maintenance.
Monitor progress of the development of engineering design deliverables all disciplines and propose corrective actions to line management in the event of potential schedule overruns
Provide leadership, assistance and support to the project team
Prepare technical and progress reports to support flow of key information to management and joint venture partners to assist in decision making
Define project scope, goals and deliverables that support business goals in collaboration with senior management
Contribute to development of technical and management process and systems
Undertake the appropriate administration relating to invoice payments in a timely manner (e.g time sheet approval; milestone sign-off etc.). Negotiate price for additional job order to Main contractor/Vendor.
Define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system
Lead and demonstrate the highest HSE Behaviours, HAZOP; HAZID
Ensure compliance with health, Safety and Environment Policy.
Develop a professional working relation with colleagues, supervisor and Stakeholders
Plan and schedule project timelines and milestone using appropriate tools.
Work harmoniously in a diverse multicultural work environment with good communications skills
Tract project milestone and deliverable.
Co-ordinate with the Operations representative in the development of the operations Assurance Plan that describes the operational activities, assurance requirements and deliverables, including plan for readiness for hand over and commissioning and approve same.
Establish the process for the development of operating manuals and ensure that the process is implemented in a quality and timely manner.
Manage the contract with contractor for the provision of technical specialists to satisfy the detailed design and technical assurance requirement.
Provide input to project progress reporting
Manage all technical third party studies
Report to the Site Manager. Etc.
Jul 2010-Jan 2011 PT.Supraco Enviro – Snr E&I Engineer
1.EPC; Project Caltex Water Disposal CGS 1;3;5;10 Duri, Construction; Pre- com; Provide as Pre-Comm and Commissioning Procedures; Startup Procedures and to be approved by client; Solo Run test Pumps, Consinyering meeting; Progress schedule; Problem solving; Etc
Client: Caltex
Responsibility:
Lead the project team E&I
Direct and manage project development, Engineering; Procurement; Construction; Commissioning; Start Up; Maintenance.
Monitor progress of the development of engineering design deliverables all disciplines and propose corrective actions to line management in the event of potential schedule overruns
Provide leadership, assistance and support to the project team
Prepare technical and progress reports to support flow of key information to management and joint venture partners to assist in decision making
Define project scope, goals and deliverables that support business goals in collaboration with senior management
Contribute to development of technical and management process and systems
Undertake the appropriate administration relating to invoice payments in a timely manner (e.g time sheet approval; milestone sign-off etc.). Negotiate price for additional job order to Main contractor/Vendor.
Define, plan and manage the activities, resources, schedule and quality of the project in accordance with management system
Lead and demonstrate the highest HSE Behaviours, HAZOP; HAZID
Ensure compliance with health, Safety and Environment Policy.
Attendance FAT for Gas Engine Generator and Diesel Engine Generator; Switchgear; MCC; Transformer; Wellhead Control Panel; PLC; Power cables, Metering skid, Etc.
Develop a professional working relation with colleagues, supervisor and Stakeholders
Plan and schedule project timelines and milestone using appropriate tools.
Work harmoniously in a diverse multicultural work environment with good communications skills
Tract project milestone and deliverable.
Co-ordinate with the Operations representative in the development of the operations Assurance Plan that describes the operational activities, assurance requirements and deliverables, including plan for readiness for hand over and commissioning and approve same.
Establish the process for the development of operating manuals and ensure that the process is implemented in a quality and timely manner.
Manage the contract with contractor for the provision of technical specialists to satisfy the detailed design and technical assurance requirement.
Provide input to project progress reporting
Manage all technical third party studies
Report to the Site Manager. Etc.
Jul 2008-Feb 2010 Brunei Shell LNG Company Sdn Berhard through Petrojaya Sdn Berhad - E/Instrument &Control Commissioning Engineer
1. Offshore Central Processing platforms at Champion 7 area; Fairley Central Processing Platforms area; Ampha Central Processing Platforms area and 32” Subsea pipe line From Champion 7 to Onshore receiving Plant
Client: BRUNEI SHELL
Responsibility:
Liaising with the client on day to day basis for project communication, technical and contractual management of the EPCI.
Manage Mechanical; Piping/Pipeline; E/I team and Vendors at onshore site based & Hook up Platforms at offshore
Onshore preparation of offshore construction work packs for pre- commissioning, commissioning.
Prepare pre-commissioning schedule, sequence and priority system / sub-system as per commissioning process priority requirements, keeps up to date pre-comm comm, start up and test run execution plans.
Prepare manpower organization to fulfil the pre-commissioning scope and schedule.
Prepare tools and equipment to fulfil the execution plan and schedule Assessment
Set and organizes documentation per system/sub-system
Follows-up & ensures clearance of punch list on regular basis
Reviews the test run procedures and the operating manuals prepared by the project Process leaders
Support construction Supt during construction execution phase and reports to commissioning site leader during preparation and execution of Pre-commissioning and Commissioning.
Organizes commissioning engineer and technicians to execute in the field
ICAPS (Integrated Commissioning & Progress System) & preparation of punch lists for pending items.
Ensure safe Construction, Pre-commissioning and Commissioning activities
Interface with project management team, discipline engineer and operations
Assist in interfaces between the project work packages during the preparation and the execution of the commissioning
Participation in system/sub-system punch list verification and acceptance
Supervises and guide contractors pre-commissioning personnel where necessary
Carry out both onshore dynamic commissioning and assist other disciplines where necessary
Assists services purchasing & subcontracting department for the definition of subcontractors scope of work
Take part in the project review meetings to make sure that the commissioning requirements have been duly complied with
Participate and lead risk assessments and toolbox talks when on site project
Support the HSE Manager for the aspects falling within his area of responsibility and for the preparation of the general HSE plan,
Ensures that HSE policy and management systems are adhered to by the construction and commissioning teams and that safe working practices are carried out at all times.
Ensures the preparation and checking of the purchase requisition and technical evaluation falling with his sphere of responsibility
Ensure plant is pre-commissioned and commissioned as per company standard specification and in line with clarifications/instruction of the commissioning site leader
Ensures the issue of work progress reports for the part he is responsible for weekly reports to the home office
Involved direct commissioning Mechanical; Piping/Pipeline; Electrical; Instrument with contractor
Verifies that the pre-commissioning, commissioning & start up requirements are accounted for into engineering documents.
Jan 2008-Jun 2008 PT.Punj Loyd Samarinda - Pre-Comm Comm Lead Engineer
1. EPSC 05 Tunu field 11 platform SUP Power Plant 2unit Diesel Generator
1.4 MVA
Client: TOTAL E & P
Responsibility:
Preparation of Project Study Report as per standard format.
Preparation of Material Log
Preparation of Budget
Collection and study of shop drawings.
Floating enquiries and obtain back-up quotations from suppliers for material finalization.
Obtaining approvals of drawings / material submittals from concerned authority / consultant.
Raising RFIs (Request for Information) in coordination with drafting and Project Manager.
Manpower planning.
Verification of materials received at site.
Raising Purchase Requisitions as per specification / drawings.
Arrangement of material for use on site for smooth continuation of work.
Attend regular coordination / progress meetings.
Supervision of works at site, and progress of work
Arrange/Schedule inspection of works by the Consultant at site upon raising of RFI.
Maintaining proper records of testing & commissioning of individual systems for onward submission.
Ensure compliance to handing over snags.
Preparation & submission of O&M manuals.
To hand over the marked up drawings as per site conditions to the drawing department.
Submission of As Built drawings.
Ensure timely submission of attendance cards to the PM for onward submission.
Ensure healthy working condition between supervisors / foremen and workers.
Prepare and submit the Engineering calculations required as appropriate for the following upon obtaining approvals from the respective HOD’s and process for further approvals from Client, Consultants and Authorities
Report to Site Manager
Sept 2006-Jan 2008 JPKenny Wood Group Shanghai China LNG - Project Engineer
Provide FEED detail engineering 32” subsea pipeline 16 Km from Simentang Island to Shanghai through offshore. Lead Engineering team and subcontractor; Consinyering meeting with Engineers
Client: CHINA LNG
Responsibility:
Preparation of Project Study Report as per standard format.
Preparation of Material Log
Preparation of Budget
Collection and study of shop drawings.
Floating enquiries and obtain back-up quotations from suppliers for material finalization.
Obtaining approvals of drawings / material submittals from concerned authority / consultant.
Raising RFIs (Request for Information) in coordination with drafting and Project Manager
Manpower planning.
Verification of materials