Post Job Free

Resume

Sign in

Civil Supervisor Truck Driver

Location:
Tripoli, Libya
Salary:
3000
Posted:
April 14, 2023

Contact this candidate

Resume:

Curriculum Vitae

Personal Data:

Full name: BACHAR MHD KHALED SID

Nationality: Syrian

Date & Place of Birth: 31st July 1974, Damascus/Syria Gender: Male

Marital Status: Married with 4 children

Mobile No.: 001218 – 91-3700110

Email: adwjz7@r.postjobfree.com

Address: Abu Hraida Area, Tripoli - Libya .

Scientific Qualification:

1- University Certificates: Graduation Year: June 1992, International Scientific Center – Intermediate Institute, University of Damascus, Syria, Topography Surveying. 2- Dar Al-Elem University/Faculty of Economics, Tripoli – Libya, B.Sc. in Accounting & Administration, May 2005.

3- English Language Course.

4- Computer Course.

Practical Experience:

1- Worked as General Manager of Beit Alteeb for Import of Cosmetics, Beauty and Perfumes from 2013 – 2019 including Marketing and follow-up of all sections.

2- From 2007 – 2011

- Ben Ghashir site Manager + all civil and constructional works inside and outside Co.’s sites in Tripoli and maintenance works.

- Ben Ghashir site, residential place and warehouses.

- Tripoli Site, Personnel residence and Administration.

- Office Site or General Administration.

- Local Procurement Department.

3- From 2004 – 2007

- Execution of (VAOS Austrian Co. General Management Project) in Tripoli city on a land of 8000 M2 Area. This includes:

1- Concrete & Wooden Buildings.

2- Electric Generators

3- Internet & telephones networks.

4- Cars Parking.

5- Paving the location with asphalt.

6- Including all facilities from guard room, cars’ washing station and service workshop.

4- Worked with VAOS OIL FIELD SERVICES AUSTRIAN

CO. LTD. from 1992 – 2011 (job included: various fields such as:

- Projects & Construction Works Manager

- Project Supervisor

- Site Manager

- In Management of Projects.

- In managing procurements & Human Resources.

- Executed set of projects in various locations in Oil Sector.

- The Most important companies I have worked with:

(Ras Lanuf for Oil & Gas Manufacturing), – (Veba Oil Co.), Zweitena Oil Co.) & Arabian Gulf Co.).

Work Experience with VAOS OIL FIELD SERVICES CO. LTD.

(in details from 2000-2004): CIVIL ENGINEER/SUPERVISOR Managed Engineering Projects and Company Camps:

BEN GHASHEER CAMP: Co. Camp included Accommodation Blocks for European Staff’ Engineers, Employees and other Manpower, Warehouse Building, Containers’ Storage Area, European Staff Mess hall, Camp Boss House and Mechanical Workshop, Project finished after 18 month from start. GENERAL MAINTENANCE FOR THE MAIN OFFICE:

Included replacement of floor tiles, complete new toilets with all accessories, internal & external painting, and building new extensions for the Main Office including 6 new offices completely with all their furniture.

Also the project included installation of new Pre-Fabricated 6 Flats for the staff employees who they work in the Head Office. All Flats delivered with complete furniture and electric facilities. NEW HEAD OFFICE BUILDING:

ON THE YEAR 2005, the Company Management decided to construct new building at its new location and I was assigned for this task as the Site Supervisor.

The work included site reparations, leveling and backfilling, compacting, projecting of the building plans on the ground, Excavation works for the foundations and installing of the three pre-fabricated Office Buildings (European Style).

And also, the 2 floors’ concrete building which will be assigned for the Co. Manager and the leading Staff of the Co. and the project is still on-going.

1998 -2000 ACTING SITE SUPERVISOR

AT RAS LAUF TERMINAL

I was managing the maintenance works for repairing of Fiber- Glass Water Line at the Utility Plant in the Sea Water In-Take location.

All the cracked areas were repaired according to the latest procedures and techniques of the Concrete Foundation Repair. Other Civil Works like replacement of concrete foundation at the Polyethylene Production Unit. The works were executed with extreme safety Regulations.

All the works in this Project were finished before the planned date of Completion.

VEBA OIL OPERATIONS WAREHOUSE AT RAS LANUF

TERMINAL:

I managed the Project of the complete replacement of the Galvanized sandwich panel roof and 700 Square Meters from the side walls with all necessary facilities like Rain Gutters and sewage pipe system.

1995-1998 TOBRUK REFINERY (AGOCO):

AS A CIVIL SUPERVISOR/SURYEYOR for the project of

installation of the desalination plant and the water disposal line, control building for the Plant. Works included site reparation works; foundation works’ installation for the equipments, installation of the Pipe Line with all its works, like: welding, G. Blasting, Painting Works, Pipe Supports’ Fabrication, Casting and installation works.

Project was finished one month early than the planned date of completion.

THE OTHER PROJECT was interconnecting of pipe line of 8 tanks including foundation works, road crossing, manholes and valve pits.

The Pipe Line was from the jetty to the Tanks Farm. ALSO the project included construction of new concrete ring beam for three 55000 BBL Tanks, replacement of Bottom Plates, Roof Plates, welding, Blasting and Painting works.

ANOTHER PROJECT was replacement of the Flare Line

Concrete Foundation completely (Works commenced while the line is under operation).

1994 – 1995 IN TRIPOLI:

I was supervising construction of a new swimming pool for A VIP: The area of the pool was of 200 Sq. M. and the pool was designed according to the latest technologies of construction modern swimming pools.

Construction of the new pool included construction of pump house, sand filters, chloride unit, underwater lighting and heating system.

1992 – 1994 IN TRIPOLI:

I worked in the Batching Plant as Batching Plat Supervisor and I was monitoring each amount of the concrete ordered by the Contractor and testing it according to the latest standards. At the same area of foundation reinforcement was pre-fabricated according to the client’s requirements and approved drawings prior casting them on the site.

Details of Voest-Alpine Oil Field Service Ltd.:-

1992-1993

Civil Foreman

VOEST-ALPINE OILFIELD SERVICE

Project handled

Cement Lining 3,5 km. 60” Pipleline Ras Lanuf Oil & Gas 1993-1994

Civil Foreman

VOEST-ALPINE OILFIELD SERVICE

Project handled

Fabrication & Installation of Pipe

Sleepers for 2,8 km. “natural Gas

Line”

Ras Lanuf Oil & Gas

Processing Co.

1994-1995

Civil Foreman

VOEST-ALPINE OILFIELD SERVICE

Project handled

Roof Repair Work,

Replacement of sandwich Panels,

Eaves, Gutters, with total of 22.000 M2

Ras Lanuf Oil & Gas

Processing Co.

1995-1996

Civil Supervisor

VOEST-ALPINE OILFIELD SERVICE

Project handled

Construction of Tower Foundation

between Dahra & Bahi Field.

Waha Oil Co.

1996

Civil Supervisor

VOEST-ALPINE OILFIELD SERVICE

Project handled

Construction of 500 m3 swimming

pool including installation of all

Zahra, Tripoli

(Seawater Intake Processing Co., Inc.

N.B.: Able to work in team under pressurized conditions. Experience Summary in Voest Alpine Oil Field Services Ltd., Libya as Construction Supervisor from 1992 onwards:

- General Construction Experience in both large and small organizations within the Oil & petrochemical industries: Initially trained as a surveyor and developed experience in mechanical & Civils progressing to the foreman, then acting supervisor.

For the past 6 years, constructing water treatment plants, tanks repair petrochemical and oil installations, process pant, pipelines jetties, through construction phases to eventual testing, commission and handover.

Successfully demonstrating efficiency and sound working knowledge of all trades, whilst achieving quality, objectives and accustomed to working with strict cost and time restraints in a pressured environment. Possessing the ability to communicate effectively at all levels and motivate a multi-national workforce, displaying leadership and supervisory hands-on qualities whilst adapting flexibly to suit the characteristic requirements of a particular contractor’s organization.

MOST RECENT KEY-ASSIGNMENTS:

TOBRUK EINERY EXPANSION PROJECT – LIBYA

Responsible as an intrinsic part of a major Oil Production accessories.

Facility Contractor’s site management team for supervising mechanical and civil construction and maintenance

contracts for tank/vessel erection and ring beam

foundations, compressors, pumps, pipelines/work,

desalination plant, control room, power station, gas bottling plant and fire fighting systems.

Routine duties also include Quality Control, Surveying and reporting.

- RASCO TERMINAL – RAS LANUF/LIBYA

Cement Lining for an area of 500 m2 of 108” sea water pipe including tank repair, sledge removal, grit blasting of tank internal, ring beam foundation, concrete pipe sleepers, construction of swimming pool and others.

VEBA OIL OPERATIONS GHANI/LIBYA

Repair works at Ghani Airstrip, including cutting out al cracked areas and replacing with new Emcol repair

Asphalt.

Upgrading Company’s own camp facilities.

N.B.: I have experience certificates for all the above works)

LANGUAGES:

Arabic: Mother Tongue (Excellent: Spoken & Written) English: Excellent Spoken & Written

N.B.:

For the jobs I have been involved in, more details can be provided upon your kind request.



Contact this candidate