Sebastian Salinas
**** ***** **., ********, ** Email: ************@*****.***
Phone: 956-***-****
EDUCATION
Bachelor of Science in Rehabilitative Services Graduation Date: May 2017 The University of Texas Rio Grande Valley Edinburg, TX WORK EXPERIENCE
Transportation Partners and Logistics Vestas 100s, 110s, 120s, GE 2.3s
• Lead Wind Technician December 2021- September 2022
• Service and Maintenance
Annual and Monthly Maintenance
• Trouble Shooting
• Onyx InSight EcoCMS install and Troubleshooting
• GE Retrofits
Progressive GE Siemens Gamesa 145s
● Quality Inspector July 2021 – December 2021
Inspection of components upon arrival.
● Pre-Assembly walks.
● MCC walks
● MCC Verifications walks.
● UCC walks
● Reliability inspection and 72 hour walk.
● Use of Ultrasonic Bolt Extensometer before and after bolts have been tensioned to verify that they are within tolerances.
Sky Climber Vestas 110s, 120s, & 136s
● Service and Maintenance December 2020 – July 2021 Annual and Monthly Maintenance
● Trouble Shooting
World Wind & Solar Vestas 110’s & 120’s
Wind Turbine Technician November 2020 - Present
● Foundation grounding and conduit installations
● Tower Wiring (Up and Down Tower)
● Medium voltage terminations and splicing (Up and Down Tower)
● Low Voltage terminations (Up and Down Tower)
● Nacelle Preparation, FAA light installations
● Fiber optic installations and terminations (Up and Down Tower) Wind Turbine Technician July 2020 – November 2020
Sentry Electeical Group, INC. Vestas 110s & 120s
● Foundation grounding and conduit installations
● Tower Wiring (Up and Down Tower)
● Medium voltage terminations and splicing (Up and Down Tower)
● Low Voltage terminations (Up and Down Tower)
● Nacelle Preparation, FAA light installations
● Fiber optic installations and terminations (Up and Down Tower) Wind Turbine Technician January 2020-July 2020
FairWind Inc. Acciona
• Top-Out T2, T3, Nacelle, Blade stabbing (Acciona)
• Base preparation and erection
• Rotator Hub Prep and stabbing on to the Nacelle.
• Blade Rotation
• Replace damaged blades, nacelle, gear box, rotor drop, main bearing.
• Transportation, on-loading & offloading.
• Base Cabinet erection. Cabinet stand assembly.
• Nose Cone assembly and stabbing on to Hub.
Wind Turbine Technician July 2019 - January 2020
Bennett On-Site Services Crane & Rigging
Vestas 110s & 120s
• Top-Out Erection
• Replace damaged blades, nacelle, gear box, rotor drop, main bearing
• Transportation, on-loading & offloading
• Nacelle preparation and Cooler top assembly.
• Base-Mid assembly and erection
• Storage and installation of parts
Wind Turbine Technician October 2018 - May 2019
Wanzek Construction
• Top-Out Erection
• Replace damaged blades, nacelle, gear box, rotor drop, main bearing
• Transportation, on-loading & offloading
• Nacelle preparation and Cooler top assembly.
• Base-Mid assembly and erection
● Storage and installation of parts
Certifications
● Global Wind Organizations Certifications
● Fire Aid
● Fire Awareness
● Manual Handling
● Working at Heights
NFPA70E
● Arc Flash Electrical Safety
Vestas BTT Training
Siemens Gamesa BTT Training
OSHA 10
First Aid/CPR
Texas Electrical Apprentice