Name: OZER YILMAZ ( CORPORATE QHSE MANAGER )
Address: * *********** **** ****** ** Dublin / Ireland
Telephone: +353-**-***-**-** / +90-534-***-**-** /
Email: ********@*****.*** / *******@*****.***
Skype ID ozerylmz_1
B.Sc Civil Technical Engineer, QMS, (IRCA-UK), ISO 9001:2008
Internal Auditor – EMS (Environmental Management System) ISO 14001:2004
HSE Preparation ( Health & Safety Management ) OHSAS 18001:2007
PROFILE
As my profile professional work start 30 years ago (1991 year ). Construction Engineering and Pharmaceutical / design and including Manufacturing. I start first time with International projects 1994 ın Turkey and My overseas projects start. In 2002, with Ireland
Gama Construction IRELAND invite me to IRELAND from Turkey for Road Project. My Experience over Construction Overseas work life IRISH Construction companies installation Precast continuous with Heavy Steel for improvement the Project over Quality and Design. I was working with International Construction Companies as like Italian Construction companies in Russian Federation / China Construction Company’s in Saudi Arabia,/ Qatar Construction Company’s in Qatar and Kenyan Construction Company’s in Kenya / Irish Construction Company in IRELAND and Turkish Construction Company in Kuwait.
I working in this construction life as a construction QA/QC Manager. HSE Manager. Project Deputy Manager and control the Design with Drawings work system. I Manage also Construction site. Like. My Work system Trying to Grow up the company with ISO system 9001:2008 / 14001:2004 / OHSAS18001:2007). And got the certifications ASAP for the Company’s like in 6 months.
My Extensive experience in wide variety of construction projects including but not limited with Highway Construction project, Railway construction project, Power Station Construction project with pipe line project, Housing Projects, High Rise Building Projects. Airport Civil Construction, Sea Port (Marine) Project. Wastewater Treatment Plant Construction and Precast Concrete Production. Manufacturing. Is One of them work I work.
PROJECTS / KEY ACHIEVEMENTS:
2023 January ASGARD Cleanroom Construction KILKENNY( Million Euro) APHARMA project IRELAND
2023 Project Sıte QA/QC & Handover Manager
2022 June ASK Romeın Construction ( 330 Million Euro) Danmark Odensa Data center project
2022 September Project Sıte QA/QC+HSE Manager
2021 September Yapı Merkezi Construction ( 800 Million Euro) Slovenia Railway Koper to Ljubıana Tunnel
2022 June. Project Sıte QA/QC+HSE Manager.
2021 January Sanpower Construction ( 2.4 Million Euro)
2021 August QA/QC Manager + HSE Manager
Germany Hannover Langenhagen Structural Construction work of UPS Transport Company Factory.
2020 April Cengiz Construction Ltd. (320 Million Euro )
2020 December QA/QC Manager + HSE Manager
CROATİA Railway construction Between KRİZEVCI to KOPRİVNİCA state border.
Preparing all the Documents like QMS Procedure / Special Procedure / Plan / ITP / and Checklist
For starting the project. I Save the Company Start time as 1 Month. And Control the Design for
The Rails Standards.
2018 March Cengiz Construction Ltd. (75 Million KWD) ( mean 225 Million Euro)
2020 April QA/QC+ HSE Manager
Construction Completion & Maintenance of the Road Works, Networks, of Infrastructure
Service for 4770 Plots & Electrical Substation for Neighbourghouds (N2 – N3) South
Mutlaa Housing Project. (1,1 Billion Dollar)
I Prepare all the Documentation for the Projects and Finalize the Test system over the Pipes
To save time and money. This is not only my work system The Project is early finish with this Ideas. My Communication and Dialog with Client is all time very good because I helping with standards and Train every one for Proving the work.
2015 September CIVICON CONSTRUCTION LTD. Oil and Gas Company
2018 March ( KENYA) Head Office Consultants QHSE Manager + PM for Structural project(1 year), ( Manage 18 Project in 6 Different Country ) Over in Total 2 Billion Dollar.
My Work was here little different. I was Preparing all the Documentation for the Company IMS
To get more Projects from the Government in KENYA. I prepare for External AUDIT all the
Documents and Train all the members for the Quality and Job Descriptions. I get all the
Certifications like ISO 9001 / OHSAS 18001 / Environmental 14001 in 6 Months to the company and Prepare the Business Department Documents to take 26 Projects in Kenya. (8.9 Billion)
2014 September ALHUDA ENGINEERING WORK Ltd (Oil and Gas Company)( 170 Million Dollar).+
2015 September Chına Harbour Engineering Jızan King Abdullah city (245 Million Dollar)
City Lusail of Beach Construction QATAR+ Dredging and Reclamation work + Marine construction Saudi Arabia
QHSE Manager + 7 Month Deputy PM
I was Agree with Al Huda Engineering for the Project LUSAİL in Qatar. As my Duty I prepare all
Documents and accepted from Clint (Qatar Petroleum ) to be Start for the Project, And After Careful investigation over the Drawing and Site to Drilling Work the Survey was not correct.
I was saving time and money for the Client as reading correctly the Drawing and Material characteristic class.
2014 February IHI Construction Ltd. (Japan Company) consultant QA/QC Manager
2014 September Gebze Yalova Highway Brick Project
Turkey ( 1.2 Billion $ )
2012 October Koray Construction Company, GARANTİ BANK and IS Bank Central Building
2014 February Construction + Pendik Govermant Hosbital construction QA/QC Manager
(80 million $ )+(100 Million $ )+(180 Million $ ) Pendik / Istanbul / TURKEY
2011 June Quality Control & Quality Assurance Sıte and Laboratory Manager ( Consultant )
2012 October ICTAS CONSTRUCTION LTD. + ASTALDI CONSTRUCTION LTD. (JOINT VENTURE) / St. Petersburg / RUSSIAN FEDERATION (800 Million EU)
PULKOVO 1 Airport New Terminal Building Construction (RUSSIA – St Petersburg) (800
million Euro)
2007 April Sectıon 3 and 4 Quality Control / Quality Assurance Manager ( Consultant )
2011 June SIAC Constructıon + -FERROVIAL LTD (JV) (Irish-Spanish Companies J.V.)
M3 Motorway Project 65 Km Main line + 100 Km Slip Roads. (1 billion Euro)
(EPC PROJECT) / Republic of IRELAND ( 2 Bıllıon Euro)
2007 April Quality Control & Quality Assurance Assıstant Manager
2004 June GAMA CONSTRUCTİON IRELAND LTD. + GENERAL ELECTRIC (JV)/ Republic of IRELAND
Tynagh 400 MW Gas Power Station (Country Galway) ( 320 million Euro)
(EPC PROJECT) + (75 KM) Pıpe lıne
Electrical / Mechanıcal / Cıvıl / work inspection Engineering Work
2001 September GAMA CONSTRUCTION IRELAND LTD + STRABAG Construction Ltd. (JV) / Republic of
2004 June IRELAND
GAMA CONSTRUCTİON IRELAND LTD + Foster Wheeler
Electrical / Mechanıcal / Cıvıl / work inspection Engineering Work
Ballincollig Bypass Dual Carriageway (Cork City) 120 million Euro
Lane’s borough(100 MW) + Shannon bridge(150MW) Power Plants (Midland) Projects. (110 million Euro + 70 million Euro)
N18 Ennis Design and Build Bypass Dual Carriageway Project 150 million Euro
1999 Jan Quality Control & Quality Assurance Assistant.
2001 Sept VINSAN LURGİ CONSTRUCTION LTD. / DİYARBAKIR / TURKEY
Vinsan-Lurgi-Passavant Diyarbakir Waste Water Treatment Plant Project/Turkey ( Turkish-
German Joint Venture )
1996-1999 QA/QC Manager Assistant 144 KM Pipe line with (RADIOGRAPHIC / MAGNETIC PARTICLE / LIQUID PENETRANT / ULTRASONIC
GAMA ENDUSTRI CONSTRUCTION LTD. / İZMİT / TURKEY
Izmit Water Supply Project, Turkey-Build Operate and Transfer Project (900 mıllıon Dollar)
QA/QC Manager Assistant
1992-1996 KUTLUTAS- DILLINGHAM (Turkish-American JV) (EPC PROJECT) / İZMİR / TURKEY
Laboratory Manager Assistant of and QA/QC inspector at Construction Site
My QUALİTY STRATEGY FOR THE PROJECT: start with
1.Prepare the Quality Plan for the project.
2.Prepare all Procedures as per Project Specifications.
3.Prepare all Forms as per project Specifications.
4.Prepare ITP s which is very important to QA/QC Team.
5.Help the construction team to prepare the Method statements.
6.Prepare Forms for construction and follow up to use correct.
7.Prepare Meetings to Advise Company Management and other staff.
8.Prepare monthly Kick of meeting to advise the client of project.
9.Train all staff for correct action
10.Work and inspect all work instructions on site and report to the PM.
11.Don’t stop the work try to run the work with correct action
12.Prepare for Unaccepted work NCR s which will be not correct action on site.
CAREER HIGHLIGHTS
Earthworks, Concrete Works, Aggregate Control, Construction Laboratory, Asphalt Works, Mechanical Works, and Concrete Batch Plant Works related professional practices according to wide International practices (British, German, Irish, American, and Russian) in different climates and environs.
Manage and oversee project quality to ensure compliance to codes, Standards, regulations. Equipment specific specifications and QMS requirement.
Advancing quality achievement and performance improvement throughout the organization.
Manage the development and implementation of the QMS for planning, fabrication, inspection, documentation and operations activities including:
Taking full responsibility for hold point releases once all IMS and QMS functions have been completed and the equipment is ready to go into the next work stage.
Developing and implementing risk-based inspections (RBI) activities and processes using the other similar programs to develop internal standard practices.
Managing plant integrity through a failure analysis reporting system and following up on recommendations
Oversee supervision of all visual inspections subcontractors.
Managing inspections testing plans for new construction, repair work, and alterations.
Identify and develop solutions to correct inspection function deficiencies.
Prepare of all Civil Works Quality, Construction-Material Engineering. Management of Concrete & Road Mix Plants. Quarry, Crushers, Asphalt Plant Management on Engineering Base.
Planning of Usage of Raw Materials as Cement, Aggregate on Economical Context.
Implications of International Civil Quality, Safety and Environmental Regulations and Standards.
Control all achieves documentation upon the completion of the project.
Ensure for QA/QC records acceptance inspections on site
Coordinate with all team members of the documentation for handover.
Preparation of all QA/QC Plans, procedures, ITP’s to be used on site for correct work.
Distribute relevant QA/QC documentation to site subcontractors.
Coordinate with the site construction managers on all quality issues to be Coordinate and chair QA/QC site weekly meeting with the project subcontractor’s QC personnel.
Quality Control & Assurance of All Civil Infrastructure Activities.
Construction of Civil and Mechanical Engineering Projects
Working Under ISO 9000 Principals and Preparation of All Quality
Systems (Quality Control Plans and Procedures) Inside of This Framework
Handling of All Civil Laboratory Tests (Under the framework of ASTM,Former BS,DIN,GOST and EN Standards ( Including EN-206 and EN-197 for Concrete and Cement Production )
Running of Concrete Ready Mix Plants, Truck mixers, Pumps, Quarries and Crushers
Supervision of civil& mechanical quality controls (related with NDT techniques)
Earthworks (field and laboratory / Ground improvement in Soft Soils / Foundation Engineering
Tunnel works / Dam Construction / Water Pipeline Construction / Preparation of concrete mix designs
QC activities about concrete, cast in situ and pre cast / Hot mix asphalt concrete mix designs
QC activities about hot mix asphalt concrete / Cement, Aggregate, Asphalt and Stabilized Road Material tests in Civil Labs
Running of Industrial Plants QC activities
Worked for a number of leading construction companies within the UK
PREPARATION OF ISO 9001:2008 / ISO 14001:2004 / OHSAS 18001:2007
PROFESSIONAL QUALIFICATIONS & EDUCATION
2017 Health and Safety practical application / 2018 Management of International healty and Safety / 2018 Controlling workplace hazards / 2018 NOBES International General Certificate in Occupational Health and Safety / 2014 Time Management course / 2011 Course of ISO 14001 / 2011 Course of ISO 9001 / 2009 Course of ISO 14001
2009 Course of ISO 9001 / 2009 Internal Audit Course / 2008 Level 2 Intermediate Excel / 2008 Time Management
2008 Level 3-Advanced Excel / 2005 Management Course of Quality Control.
1999 – 2001 BSc of 2+2 Years Construction Technical Engineering University of Kocatepe city of Afyon/Turkey ( Degree : 8,64 )
1997 – 1999 / Civil Construction technical education of College.
REFERANCES.
M.Sait OZYURT QA/QC Manager (1997–1999),(2002- 2004)
Mob Ph. : 009*-***-***-** 68 (************@*******.***)
Nihat GIRIT Civil Engineer (Grace Building Chemical Sales Manager)(1996-1997)
Mob Ph. : 009*-***-***-**
James KELLY Civil Engineer ( Siac Ferrovial Construction Ltd ) QA/QC Manager
Mob Ph. : 086-*******
Michael MORGAN Civil Engineer( Siac Ferrovial Construction Ltd ) QA/QC section Manager.Mob. Ph.
James Mc CALDIN Civil Engineer ( Meath Consult)
Mob. Ph. : 087-*******
John DOOLEY ( Euro Link M3 Motorway Project Client Manager)
Mob Ph. 087-*******
CIVICON ENGINEERING KENYA
Ben Kiilu ( Ceo of Civicon Construction) Kenya
***.*****@************.***
Hisham Al-Othman (PM of Housing project kuwait) Mob.Ph +365-********