Post Job Free

Resume

Sign in

Qc Technician Roadway Construction

Location:
Wesley Chapel, FL
Salary:
32.00
Posted:
January 27, 2023

Contact this candidate

Resume:

I Craig L Smith have over ** years of Construction

experience and 6 years of Inspector experience.

ESP Associates- Construction Engineering Inspector- My responsibilities were to testing concrete for D.O.T, Earthworks, Daily reports, Overseeing of different crews, payouts, 1 point soil testing. GPR

AE Engineering- Construction Engineering Inspector-I had to put books together, test earthworks also used topole to take depth checks also attend meetings with contractor. I also held all responsibilities of CEI, QC, and QC manager. Universal Engineering – QC tech testing both Embankment and Pipe on Toll Express lane as Lead tech. working on North Interchange, as well DOT test track, toll Rt 23 and handling multiple book checks with the state for all projects.

Cal-Tech Testing- running Pecan Rd. earthworks quality control

Telics Engineering-GIS engineer Designing fiber optic layout for us military, Post filed Layouts with information for the East Coast of US. Productivity reports for the East Coast, partner with all workers and Time Warner for all incomplete task.

City of Naples-Pipe, Valve, Hydrant, Meters installation and repair, reviewing city plans and blueprints for layout and sizes of pipes and locations.

Oldcastle Precast- design site plan and layout for plants, design Electrical, storm and Drainage systems and structures, Calculating repair estimates for Structures for State DOT. Rebar and caging design layout Skyline Construction- Project takeoffs, bidding, and proposal estimates. Road and Bridge work with structural steel, project management and all task with overseeing the project completion. on roadway construction projects. Craig has strong knowledge of CEI, materials testing, manage QC reports, field documentation, quality control, daily reports and density logbook. He is able to monitor necessary field documentation, prepare daily work reports, and verify required MOT and Erosion control setup throughout the duration of the project. Craig is a valuable team member, ready and able to work with the Senior Inspector, project team, and Contractor to produce quality and successful projects. EXPERIENCE:

6 years

EDUCATION:

Associate Degree in Computer Aided Drafting;

Florida Technical College of

Technology – ITT Technical College;

Dayton, OH

REGISTRATION/CERTIFICATIONS:

• TIN: S53011270

CTQP Asphalt Paving Level 1 & 2

CTQP Concrete Field Technician Level 1

CTQP Earthwork Level 1 & 2

CTQP QC Manager

CTQP Advanced MOT

ACI Field Testing Technician Grade 1

Nuclear Radiation Safety / HazMat

OSHA 10Hr

OSHA 40Hr Hazwhoper

PPE Level A,B,C, & D

OSHA 24-Hr Emergency Response to

Hazardous Materials

INSPECTOR / QUALITY CONTROL

CRAIG SMITH

aduytg@r.postjobfree.com

813 853 - 1447

SCDOT District 7, US-1 & Interstate 20, Lexington County; Cost $50M Reference: Alexander Cartledge SCDOT 803-***-**** • QC under this Contract consist of a new urban roadway construction with both concrete and asphalt pavements with a closed storm-sewer system. The project also includes construction of storm water management facilities, floodplain compensation sites, bridge culverts, retaining walls, signing and pavement markings, signalization, lighting, functional milling and resurfacing, and landscaping on US 1. Mr. Smith duties include testing earthworks also concrete testing for bridge and attending meetings with contractor.

Project Started: 10 – 2022 / Project Completed: On – Going FDOT District 5, Turkey Lake turn-pike, Orange County; Cost $2.3M Reference: Pete McRea, PE turn-pike 561-***-**** • CEI / Manager - The Improvements under this Contract consist of a redesign of parking at turn-pike rest area, construction with both concrete and asphalt pavements with a closed storm-sewer system. The project also includes construction of storm water, floodplain compensation sites, signing and pavement markings, signalization, lighting, functional milling and resurfacing, and landscaping on Turkey lake rest area on both north and south directions of Florida turn-pike. Mr. Smith duties include testing earthworks also to take depth checks and attending meetings with contractor. Project Started: 6 - 2020 / 8 - 2020

FDOT District 7, SR-52, FIN 435***-*-**-**, Pasco County; Cost $83M Reference: Barbara M. Beacham, District Materials Earthwork Manager 863-***-**** • QC Technician / Manager - The Improvements under this Contract consist of a new urban roadway construction with both concrete and asphalt pavements with a closed storm-sewer system. The project also includes construction of stormwater management facilities (ponds), floodplain compensation sites, bridge culverts, retaining walls, signing and pavement markings, signalization, lighting, functional milling and resurfacing, and landscaping on SR 52 from Urdaco Place to West of Fort King Road in Pasco County. Mr. Smith duties include testing earthworks also used topole to take depth checks and attending meetings with contractor. Project Started: 1 - 2020 / Project Completed: On - Going FDOT District 2, I-95 at I-10 Interchange Operational Improvements, Duval County Reference: Brian Phillips, District Materials Earthwork Manager 386-***-**** • QC Technician – This construction contract involved operational improvements to the interchange at I-95 and I-10 including the widening of the Fuller Warren Bridge and addition of a Shared Use Path to the southbound side of the bridge. Other improvements included reconfiguring the interchange in order to accommodate future growth, construction of a new parking lot, sound barrier walls, cantilevered and span sign trusses, and Intelligent Transportation Systems (ITS) facilities. Mr. Smith was responsible for earthworks, Quality Control and testing, running of all reports for east coast of pending jobs, working with micrometers and vibration monitors, recording of all data and findings from test, earthworks, MSE Walls and pile driving certifications. Project Started: 5 - 2018 / Project Completed: 1 – 2020

FDOT District 2, I-95/I-295 North Interchange, Duval County Reference: Brian Phillips, District Materials Earthwork Manager, 386-***-**** • QC Technician – This construction contract included a collector distributor system in order to facilitate movement through the interchange. Auxiliary lanes and minor ramp improvements will be added to I-95 and the Airport Road Interchange and the Cole Road Bridge over I-95 will be replaced. Bridge replacement and construction as well as ramp reconstruction will occur along I-295 North and US 17. Other improvements included construction of sound barrier walls, cantilevered and span sign trusses, and Intelligent Transportation Systems (ITS) facilities. Duties included earthworks, Quality Control and testing, running of all reports for east coast of pending jobs, working with micrometers and vibration monitors, recording of all data and findings from test, earthworks, MSE Walls and pile driving certifications. Project Started: 5 – 2018 / Project Completed: 1 - 2020 FDOT District 2, I-295 Express Lanes from SR 9B to JTB, Duval County Reference: Brian Phillips, District Materials Earthwork Manager 386-***-**** • QC Technician – This construction contract included the construction of two additional 12-foot travel lanes (tolled express lanes) in each direction, improving interchanges at J. Turner Butler Boulevard, Gate Parkway, Baymeadows Road, and State Road 9B, constructing of noise walls along I-295 in various locations, building drainage ponds and installing electronic tolling systems at various locations for toll collection. Mr. Smith was responsible for earthworks, Quality Control and testing, running of all reports for east coast of pending jobs, working with micrometers and vibration monitors, recording of all data and findings from test, earthworks, MSE Walls and pile driving certifications. Project Started: 5 - 2018 / Project Completed: 1 - 2020 FDOT District 2, SR 23 from N Argyle Forest to I-10, Clay and Duval Counties Reference: Brian Phillips, District Materials Earthwork Manager 386-***-**** • QC Technician – This construction contract included the construction of a four-lane divided expressway, interchanges at Blanding Boulevard, Oakleaf Plantation Parkway, Argyle Forest Boulevard, 103rd Street, Normandy Boulevard, and New World Avenue, overpasses at Old Jennings Road and Trail Ridge Road, constructing of slip ramps to and from Branan Field Frontage Roads, noise walls, milling and resurfacing existing pavement, and building drainage ponds and building automated tolling facilities for electronic toll collection. Duties included earthworks, Quality Control and testing, running of all reports for east coast of pending jobs, working with micrometers and vibration monitors, recording of all data and findings from test, earthworks, MSE Walls and pile driving certifications. Project Started: 5 - 2018 / Project Completed:

CalTech

Reference: Dave Jefferson 904-***-**** • QC Technician - Duties included Earthworks, quality control and testing Running of all reports for east coast of pending jobs, working with micrometers and vibration monitors, recording of all data and findings from test, earthworks I, MSE Walls and pile driving certs. Project Started: 2 – 2018 / Project Completed: 5 – 2018

Telics Engineering GIS Surveyor and Quality Control

• QC Technician – Mr. Smith’s responsibilities included design fiber optic lines for Time Warner Customers with GIS maps and print layouts, quality control and testing of other desktop surveyor’s and post field layouts with information given from field tech, running of all reports for east coast of pending jobs, working with coworkers and Time Warner for all uncompleted jobs, recording of all data and findings from service supplied to customers. Project Started: 2014 / Project Completed: 2015

United States Infrastructure

• Utilities Locator - Mr. Smith’s duties included locating underground water pipes and utilities, reading of blue prints of city layout and pipe sizes, Valve and hydrant locations, working with coworkers and other departments for all Utilities, recording of all data and findings from service supplied to customers, communicating with customers and having great customer relations. Also, designing fiber optic layout for US military, Post filed Layouts with information for the East Coast of US. Productivity reports for the East Coast, partnering with all workers and Time Warner for all incomplete task. Project Started: 2013 / Project Completed: 2013 City of Naples

• Utilities Technician - Duties included repairing of pipes, valves and hydrants, also supplying new services in the city, locating underground water pipes and utilities, replacing of water meters and repairing of them. Recording of all findings, reading of blue prints of city layout and pipe sizes, Valve and hydrant locations, working with coworkers and other departments for all repairs needed, recording of all data and findings from service supplied to customers, communicating with customers and having great customer relations. Project Started: 2011 / Project Completed: 2012

Oldcastle Precast

• CAD Drafter - Mr. Smith worked at the Jacksonville and Cape Coral plants and his duties included detailing and drawing standard products, site plans and plant layout, detailing Electrical, Storm and Drainage systems and calculating rebar for products to State D.O.T Standards, tying rebar in the caging department and making rebar layout from drawings, offer computer aided designs along with office administration help when needed, safety Committee. Project Started: 2009 / Project Completed: 2010 Skyline Construction

• Technical Coordinator & Assistant Project Manager - Mr. Smith’s projects included detailing and drawing projects, estimating, takeoffs, bidding and proposals on projects, Industrial, commercial, road and bridgework with structural steel, overseeing projects from beginning to completion. Project Started: 2008 / Project Completed: 2009

1st Friendly Financial, Duval County

• Chief of Operations - Duties included acquiring new lenders, accounts and maintaining of all accounts, acquiring of real estate properties and Payroll. Project Started: 2006 / Project Completed: 2008 3YB Property Investments & Construction Inc.

• Senior Project Manager - Mr. Smith’s responsibilities included reviewing all plans and drawings and making any changes as needed, huge and multi-family residential constructions, handling of all scheduling and orders of supplies. Project Started: 2003 / Project Completed: 2006 CRAIG SMITH – Inspector / Quality Control



Contact this candidate