Post Job Free

Resume

Sign in

Piping Engineer Clean Fuel

Location:
Ahmedabad, Gujarat, India
Posted:
December 02, 2022

Contact this candidate

Resume:

*

CURRICULUM VITAE

SENTHIL KUMAR.M

Cell: +91-735*******.

Whats app: +91-735*******.

E-mail: adttj3@r.postjobfree.com

Personal Profile

Career Work Summary

o Analyzing, Planning and Execution for scope of work area assigned. o To ensure satisfactory execution and consolidation of onsite construction activities on time and according to specification.

o Involvement in Coordination, Implement & final mechanical clearance. o Involvement in Coordination, Implement, Updating of Method statements, Construction schedule. o Manage and administer Daily reports to ensure effective performance of all man power and machinery resources involved in construction.

o Raising Material requisition, Inspection of Material procurement as per the specifications. Ensure compliance with the stated Quality requirements of the project. o Maintain close liaison and good relationship with Third party & Client. o As built drawing, Bill of material preparation for piping & steel structural fabrication and erection works. o Involving in Hydro & Pneumatic tests.

o Involving in preparation of daily and weekly job rolling schedule. o Co-ordination for equipment movement for site erection activities. o Involving crane lifting plan preparation.

o Involving safe job plan preparation.

o Allocation of jobs to foreman and labors.

experience in Major Construction Projects (PIPE FABRICATION AND ERECTION) in India and abroad. A supervisor cum Engineer with excellent exposure and experience in various construction projects involving time bound schedules processing good management skills with sound knowledge of construction process and activities in a reputed construction company in Middle East countries and India. Asset: A pleasant personality bearing good interpersonal skills with a good exposure, which is a definitely utmost requirement to the working trends in the India.

● Total Experience of 12 Years ncompassing PIPING as a supervisor Cum ENGINEER professional 2

Personal Data

Name : SENTHILKUMAR.M

Date of Birth : 30 JUN 1991.

Nationality : Indian.

Marital Status :

Married.

Permanent Address :

3/60 Muthukumaran St, Pachal (PO),

Namakkal (DT), Tamil Nadu, India-637018.

Ph +91-956*******.

Qualification

:

DIPLOMA IN MECHANICAL ENGINEERING.

MAHENDRA POLYTECHNIC COLLEGE.

Passport Details

o Passport number : K0406890.

o Date of Issue : 07/03/2013.

o Date of Expiry : 06/03/2023.

o Place of Issue : COIMBATORE.

Experience in Brief:

Project : BAPCO REFINERY BAHRAIN.

Project : HPCL SRU (EPC) PROJECT.

Client : PETROFAC INDIA LTD.

Company : PETROFAC INDIA LTD(2021 to 2022)

Position : Piping Supervisor.

Project : BPCL MSBP PROJECT.

Client : GR ENGINEERINGLTD.

Company : NEO STRUCTO CONSTRUCTION LTD (2019 to 2021) Position : Piping Engineer.

Client : TTSJV LTD

Company : BAHRAIN SPECIAL TECHNICAL SERVICE(05-05-2022 to ti)Position : Piping Supervisor.

3

Project : GATHERINGCENTER GC-01,03,07,08,11,21 EPC PROJECT KOC (Kuwait Oil Company)

Position : Piping Supervisor.

Clien : KOC (KUWAIT OIL COMPANY)

Company : GULF SPIC GENERAL TRADING & CONTRACTING COMPANY W.L.L.(2016 to 2019)

Job Responsibility

To study the isometric drawing received from the clients and to identify the pipe lines and carry out the inspection work.

Involving erection and alignment of TG piping.

Check flow direction arrows on valves, verify they are properly identified and valves are installed in accordance with flow direction.

Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawing and the pipe support details.

Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.

Supervision of all piping works and ensures safety and quality standards of the client.

Inspection and approval of all the QA/QC submittals of the subcontractor.

Line check to verify the use of correct material fitting, valves and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done.

Assigning the targets for the Foremen.

Materials take of preparation.

Project : CLEAN FUEL PROJECT (CFP-MAB-2) KNPC (KUWAIT NATIONAL PETROLEUM COMPANY)

Position : Piping supervisor.

Client : KNPC (Kuwait National Petroleum Company)

Company : GULF SPIC GENERAL TRADING & CONTRACTING COMPANY W.L.L.( 2016 to 2019)

Job Responsibility

o Reviewing approved P&ID and Plan,GA Drawing.

o Co ordination Marking and Spool Erection as per the marking. o Work co ordination as per the customer instruction. o Taking field measurements and give comments to change Isometric drawings 4

o Proper communication with my team and my head.

o Planning, scheduling daily work as per the engineer instruction. o Executes job as per approved drawings and documents. o Report daily work progress to my in charge.

Safety

● Ensuring proper PPE usage,

● Work execution as per permit procedures,

● Getting advice from Safety department for the safe work practice,

● Waste disposal as per Safety rules.

● Following proper safety precaution while working in site. 1) M/s BEST TECH MECH AND INFRA ENGINEERS PVT LTD

● PROJECT: INDIAN OIL CORPORTATION LTD.

Client : TOYO ENGINEERING LTD,ODISHA,PARADEEP.

Contractor : M/s BEST TECH MECH AND INFRA ENGINEERSPVT LTD. (2013 to 2016)

POSITION : PIPING SUPERVISOR (FIELD)

Responsibilities & Involved:

To study the isometric drawing received from the clients and to identify the pipe lines and carry out the inspection work.

Involving erection and alignment of TG piping.

Check flow direction arrows on valves, verify they are properly identified and valves are installed in accordance with flow direction.

Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawing and the pipe support details.

Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.

Supervision of all piping works and ensures safety and quality standards of the client.

Inspection and approval of all the QA/QC submittals of the subcontractor.

Line check to verify the use of correct material fitting, valves and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done.

Assigning the targets for the Foremen.

Materials take of preparation.

5

2) M/s BEST TECH MECH AND INFRA ENGINEERS PVT LTD.

● PROJECT 1: GURU GOVINDAR SINGH REFINARY,GGSR,PUNJAP,BATINDA. Client : ENGINEERING INDIA LIMITED

Contractor : M/s BEST TECH MECH AND INFRA ENGINEERS PVT LTD (2011 to 2013)

POSITION : PIPING SUPERVISOR (FIELD)

Responsibilities:

Supervising of site work for daily and weekly progress requirements.

Assigning the targets for the Foremen.

Materials take of preparation.

Co-ordination with client for all design and field modification works.

Planning and controlling movement of equipments.

Involving site Technical Queries work.

Co-ordination with piping in charge for day to activities.

Co-ordination with site people for daily Material and man power requirements.

Co-ordination with site in charge for preparing daily and weekly job schedule preparation. Job involved:

Involving Fabrication and erection of C.S and SS piping.

Co-Ordination for material shifting from fabrication yard to Erection site according to site requirement.

Involving erection and alignment of fire fighting system piping.

Involving Fabrication and Erection of pretreatment plant and Dm water piping.

Involving Fabrication and erection of instrument and plant air system piping.

Fabrication and erection of crude oil and gas oil system piping.

Co-Ordination with QA/QC for inspection.

Involving surface preparation and painting activities.

Involving final punch list clearance and final box up.

Involving test package preparation. Involving erection site Hydro & Pneumatic testing activities.

Fabrication and erection of instrument and plant air piping.

Fabrication and erection of Dm water piping.

Fabrication & erection of pipe supports.

Fabrication & erection of Steel structural for pipe rack.

Ensuring all safety regulations are implementing on site.

Ensuring all quality requirements have been followed on site.

Fabrication & erection of cooling water system piping. 6

Declaration:

I hereby declare that the above furnished information is true to the best of my knowledge and belief.

Date : Yours sincerely,

Place :

(SENTHILKUMAR.M)



Contact this candidate