** ********* **, ****** ** *****
Cell: 646-***-****
Email: adtrqs@r.postjobfree.com
GERARDO RUIZ
Objective To obtain a secure position where my skills achieved through experience can furnish me with a growing opportunity for knowledge and expansion.
Experience 2006 – Present
St. Barnabas Hospital 4422 Third Avenue, Bronx, NY 10457
Engineering Dept/Maintenance Mechanic
Maintenance Hospital Infrastructures
Office Areas, scanner room, x-ray rooms, MRI rooms, pantry areas, operating rooms, ER areas, corridor areas, roof top areas, boiler room areas, A/C room, Equipment areas, Patient rooms
Repair/Re-Install New Drop ceilings with 24X24 or 24X48 ceiling tiles. Replacement of ceiling tiles
Repair/Re-install handrails, bumper guards
Install soap dispensers, towel dispensers, hand soap dispensers, hand sanitizers
Install wall cabinets
Mount picture frames, hospital signs, fire extinguishers signs, bulletin boards, cork boards where needed.
Carpentry:
Cut to size and installed Lexan/Plastic where needed
build sheet rock walls, tape, and plaster, prime, paint where needed
repaired countertops/cabinets
install keyboard desk drawers on desks
Asemmble office furniture
install shelves
Electrical:
Replaced call bell system parts
Replaced fluorescent bulbs
replace electrical ballast on light fixtures
replace electrical outlets, electrical switches light fixtures
Plumbing:
replace lavatory faucets, toilet flush armeters
replace leaking drains of lavatories, sinks
repair water leaks cold/hot water lines/drain lines and unclog drains
A/C – Heating:
maintained all pantry areas/ice machines, portable A/C units, window A/C units, package A/C units as York units, Trane Units, Incremental A/C – Heating units, singer A/C Heating units, Split A/C units
Replace air filters, motor belts, fan belt motors, fan motors, clean coils
water coolers
1996 – 2005
Schawk, Inc. 44 W. 28th Street, NYC 10001
(formerly Horan Imaging Solution)
Supervisor/Oversee Cleaning Maintenance Department
Equipment Mechanic
HVAC
Maintained all shop equipment and machinery
Air compressors T30 Ingersol Rand; 5HP/80 vertical tanks
A/C Units – York Package Units – 10 ton/Carrier A/C units 10 gal, Air handlers, Q-Mark electric heaters, gas heaters – 25,000 BTU’s
Replaced filters – all package units
Electrical
Relocate and/or replace electrical lines
Install/replace ballasts, fixtures, switches, outlets and machinery motors
Carpentry
Remodeled/build out commercial office floors
Replaced tiles as well as refinish wood floors
Plumbing
Installed and/or replaced industrial sinks with foot peddling
Repair and/or replaced faucets, urinals and flushometers
Cleaned and unclogged industrial and commercial drains
Misc
Maintained 38x40 Komori Printing Press
Maintained film processors, Cronalith RA II, Rapid Acess 3609, Carnfelt GL 361 plus many other printing press machinery
Relocate/replace network computer lines
Temporary Replacement as a shipping/Stock Manager
1993-1996
Fenn & Fenn Lithographers 75 Varick St/New York
Supervisor
Oversee bindery work
Package custom reports/data for priority mailing
Quality printing control
Education: 197*-****-****
GED
Lehman College/Bronx, NY
Adult Degree Program
Business Management
HVAC Course
Skills: Word for windows, 95, 98, 2000, Windows XP
References: Furnished Upon Request