Career Summary: I have worked as a team player and contributed positively to organizational growth and achieving the set out task. Trained colleague and ensured increase in efficiency among them.

Education: [2017-2018] University of Benin, Benin City, Edo State Masters in Production Engineering

[2015-2016] University of Benin, Benin City, Edo State Post-Graduate Diploma (PGD) in Production Engineering

[2010-2012] Petroleum Training Institute Effurun

[2006-2009] Petroleum Training Institute Effurun

Certificates Obtained: [2015-2016] Post-Graduate Diploma (PGD) Production Engineering

[2014] Certificate of National Service.

[2010-2012] Higher National Diploma (HND)

(Welding Engineering and Offshore Technology)

[2006-2009] Ordinary National Diploma (OND)

(Welding Engineering and Offshore Technology)

Professional Body: Council of the Regulation of Engineering in Nigeria 2019 Other Professional

Courses Attended: [2019] Project Management Professional 35 Contact Hours

(Longhall Consult Limited)

[April 2017] Magnetic Particle Testing Level II

(Glotraincert Limited Nigeria)

[April 2017] Radiographic Film Interpretation Level II

(Glotraincert Limited Nigeria)

[Jan. 2017] Scaffold Inspection (OSHA)

[Oct. 2012] HSE Competence Development Training Level III

(Nigeria Institute of Safety Professionals

[Sept. 2012] General Health Safety and Environment Level I

(Nigeria Institute of Safety Professionals)

[June 2012] Radiographic Testing Method Level I

(National Centre for Non-Destructive Testing)

[August 2010] Quality Management in Construction and Fabrication

(NIW/IIW)

Job Experiences

Company: [ JANUARY 2021] CHEMIE-TECH LIMITED FREE TRADE ZONE, IBEJU LEKKE,

LAGOS STATE

Third Party: AUDEX ENGINEERING AND CONSTRUCTION

LIMITED

Location: No. 5, Tunji Oluwole Street, Off Fola Agoro, Somolu Yaba, Lagos state.

Project: PIPING OF STORAGE IN DANGOTE OIL

REFINING LIMITD

Position: PROJECT ENGINEER

Job Responsibilities:

Preparing, scheduling, coordinating, and monitoring of assigned engineering projects

Formulating project parameters and assigning responsibilities to the most capable employees and monitoring the project team.

Interacting with clients, interpreting their needs and requirements, and representing them in the field.

Preparation of material list and checking of material supplied as specified in drawings.

Supervision and daily report of work progress in fabrication yard and piping erection at storage tank.

Performing quality control tasks on budgets, schedules, plans, and personnel performance and reporting on the project's status.

Cooperating and communicating with the project manager and other project participants and collaborating with senior engineers to create more efficient project methods and to maintain the project's profitability.

Reviewing the engineering tasks and initiating the necessary corrective actions.

Developing specifications for the project's needed equipment.

Preparation of invoice to clients.

Break down of work methods and step by step procedure for executing works.

Planning for new job commencement, preparation of work schedule and methodology. Understanding project specifications and developing time schedules and budgets that meet them.

Negotiating with vendors and contractors to secure the best prices.

Observing existing processes, analyzing staff performance, and addressing deficiencies accordingly.

Analyzing technical drawings and providing material and cost estimates.

Ensuring all projects are completed on time and within budgets.

Preparation bill of materials from P & ID and Isometric drawings

Selection electrode according to the composition of material supplied

Preparation of Weld map

Preparation of Inspection and Test plan

Company: [ MARCH 2020] CHEMIE-TECH LIMITED FREE TRADE ZONE, IBEJU LEKKE,

LAGOS STATE

Third Party: WADRIK PROJECTS LIMITED (WPL)

Location: No. 5, Tunji Oluwole Street, Off Fola Agoro, Somolu Yaba, Lagos state.

Project: PIPING OF STORAGE IN DANGOTE OIL

REFINING LIMITD

Position: PROJECT ENGINEER

Job Responsibilities:

Interpretation of Storage tank piping Drawings

Interpretation of Isometric drawing (materials and cut length)

Preparation of material list and checking of material supplied as specified in drawings.

Supervision and daily report of work progress in fabrication yard and piping erection at storage tank.

Interfacing with our client and WPL on work progress and challenges at various sites.

Fabrication of piping rings for storage tanks, involving, cutting to size, threading of pipe, rolling of pipe and welding of various diameters.

Preparation of QAQC fit-up and welding report.

Examination of welded joints for defects visually.

Preparation of invoice for WPL billing to our clients.

Break down of work methods and step by step procedure for executing works.

Planning for new job commencement, preparation of work schedule and methodology.

Qualification of WPS

Qualification of Welders using WPS

Preparation bill of materials from P & ID and Isometric drawings

Selection electrode according to the composition of material supplied

Preparation of Weld map from engineering drawing

Preparation of Inspection and Test plan

Hydro testing of fabricated lines

Company: [2019] ONSHORE CONSTRUCTION FREE TRADE

ZONE, IBEJU LEKKE,

LAGOS STATE

Third Party: TATACOMS INTERGRATED RESOURCES

LIMITED

Location: 357 Nnebisi Road Asaba, Asaba Delta State. Project: UNDERGROUND PIPING OF INTERMEDIATE

TANKS

Position: SITE ENGINEER / MANAGER

Job Responsibilities:

Interpretation of General Area Drawing

Interpretation of Isometric drawing (materials and cut length)

Inspection of fittings as per specification on isometric

Supervision of lowering of manhole

Preparation of progress report and tracking work progress

Managing of manpower and equipment used for the project

Preparation of Inspection and Test plan

Check fit up

Ensured workers adherence to WPS and monitoring welders during welding

Prepared daily inspection report, progress report and welder’s performance report.

Ensuring manhole and piping erected have the right elevation as per isometric.

Ensure NDT is carried as per specification for joint types

Supervision of coating of approved welded joints

Holiday testing of underground pipe

Interpretation of NDT

Company: [2018] RUTH’RFORD SERVICES LIMITED

Location: Plot 3 & 4 Warri Refinery – Ughoton Road Ughoton, Delta State

Project: PRESSURE REGULATING METERING STATION

Position: QUALITY ASSURANCE QUALITY CONTROL

Client: ZAKHEM CONSTRUCTION NIGERIA LIMITED /

DANGOTE FERTILIZER LIMITED

Job Responsibilities:

Foundation preparation of skids and pipe support

Preparation of Weld Procedure Specification

Interpretation of Piping and Instrumentation Drawing

Interpretation of plant layout and the various Isometric lines

Identification plant layout skid position

Installation of skids and alignment of the various

Grouting of the skid

Identification of pre-fabricated vendor spools

Installation of vendor spool

Fabrication of spool from Isometric drawing

Installation of valve and various fittings as required by P&ID and Isometric Drawing

Installation of fabricated spool

Fabrication and installation of pipe support

Examination of weld joints

Qualification of Welders using WPS

Preparation bill of materials from P & ID and Isometric drawings

Selection electrode according to the composition of material supplied

Preparation of Weld map from engineering drawing

Preparation of Inspection and Test plan

Hydro testing of fabricated lines

Re-statement of fabricated lines and installation of gasket

Leak test of the Station

Check fit up

Ensured workers adherence to WPS and monitoring welders during welding

Visual Examination of weld.

Prepared daily inspection report, progress report and welder’s performance report

Company: [2017] R.N Ducs International Limited

Location: 1 R.N Ducs Close off Jonah Street By

Onukem Odara Okporo Road, Rumuodara

Port Harcourt

Position: Quality Assurance and Quality Control Advisors / Welding Engineer

Job Responsibilities:

Analysis of Weldment to verify the Strength of weldment

Checked dimensional accuracy, alignment and edge preparation of material to be welded

Ensured workers adherence to WPS and monitoring welders during welding

Lifting and Hoisting of different materials (Erection Process, Cargo Movement and Building Construction)

Performed material inspection on pipes, drilling pipes, plates and other materials

Conducted quality control auditing

Prepared daily inspection report, progress report and welder performance report.

Inspecting general sandblasting activities

Performed Dye penetrant (Liquid penetrant) inspection, Ultrasonic inspection, Magnetic particle inspection and Radiographic Inspection

Updated NDT reports

Provided right Interpretations of Radiographs films

Inspection and Certification Cargo carrying units.

Lifting equipment inspection and certification

Welding machine inspection, calibration and certification Company: [2014-2017] Ben-Mem Nig. Ltd

Location: Opposite Lawfab Hotel, Osubi Okpe, Delta State. Position: Assistant Inspector.

Job Responsibilities:

Inspected several heavy weight drill pipes using visual inspection, magnetic particle test, radiographic test and ultrasonic testing methods

Inspected Several drill collars using visual inspection, magnetic test, radiographic test and ultrasonic testing methods

Inspected several drill pipes using visual inspection, magnetic test, radiographic test and ultrasonic testing methods

Company: [2009 -2013] Dimatab Technical Service Ltd Location: Km 1 Ubeji-Jeddo Road, Epkan, Delta State Position: Welding Supervisor.

Job Responsibilities:

Involved in the construction of underground filling station tanks

Interpretation Welding symbols and Signs

Fabrication of stool supports for offshore structure

Fabrication of surface tanks and Filling station canopy

Installation of filling Station Canopy

Fabrication and Erection of Stanchion for storage of Water in swamp

Foundation preparation for Stanchion Installation

Maintenance of Cargo carrying units CNL

Checked dimensional accuracy, alignment and edge preparation of material to be welded

Ensured workers adherence to WPS and monitoring welders during welding

Monitored pre-fabrication and field installation of pipes

Performed material inspection on pipes and piping component

Pipe line laying and hydro testing

Prepared daily welding report, progress report, welder’s performance report, weld traceability

Inspected general sandblasting activities

Performed Dye penetrant (Liquid penetrant) test, Ultrasonic test and Radiographic Test

Provided right Interpretations of Radiographs films CONFERENCES ATTENDED

International Institute Welding Conference (IIW) Abuja 2009

Nigeria Institute of Welding Conference (NIW) 2010

Ecowas Welding Conference Lagos 2014

RESEARCH WORK

Analysis of a Flash Butt and Manual Metal Arc Weldment

Analysis of Water Sample using ANOVA to ensure Quality Control

Effect of edge preparation on the Strength of Weld and Combination Weld

Briquette development from hycent grass and sawdust COMPUTER PROFICIENCY:

Microsoft office (Word, Excel, Project and Power Point)

Navisworks