ENGR. UDI OTUAGHONO ENIYE
* **** ******, *** ***** Warri,
Delta State.
Phone: 080********
Email: adt5ck@r.postjobfree.com
Personal Data:
Date of Birth: 25th April 1984
Sex: Male
Marital Status: Single
State of Origin: Delta State
Local Govt. Area: Ughelli-South
Religion: Christianity
Career Summary: I have worked as a team player and contributed positively to organizational growth and achieving the set out task. Trained colleague and ensured increase in efficiency among them.
Education: [2017-2018] University of Benin, Benin City, Edo State Masters in Production Engineering
[2015-2016] University of Benin, Benin City, Edo State Post-Graduate Diploma (PGD) in Production Engineering
[2010-2012] Petroleum Training Institute Effurun
[2006-2009] Petroleum Training Institute Effurun
Certificates Obtained: [2015-2016] Post-Graduate Diploma (PGD) Production Engineering
[2014] Certificate of National Service.
[2010-2012] Higher National Diploma (HND)
(Welding Engineering and Offshore Technology)
[2006-2009] Ordinary National Diploma (OND)
(Welding Engineering and Offshore Technology)
Professional Body: Council of the Regulation of Engineering in Nigeria 2019 Other Professional
Courses Attended: [2019] Project Management Professional 35 Contact Hours
(Longhall Consult Limited)
[April 2017] Magnetic Particle Testing Level II
(Glotraincert Limited Nigeria)
[April 2017] Radiographic Film Interpretation Level II
(Glotraincert Limited Nigeria)
[Jan. 2017] Scaffold Inspection (OSHA)
[Oct. 2012] HSE Competence Development Training Level III
(Nigeria Institute of Safety Professionals
[Sept. 2012] General Health Safety and Environment Level I
(Nigeria Institute of Safety Professionals)
[June 2012] Radiographic Testing Method Level I
(National Centre for Non-Destructive Testing)
[August 2010] Quality Management in Construction and Fabrication
(NIW/IIW)
Job Experiences
Company: [ JANUARY 2021] CHEMIE-TECH LIMITED FREE TRADE ZONE, IBEJU LEKKE,
LAGOS STATE
Third Party: AUDEX ENGINEERING AND CONSTRUCTION
LIMITED
Location: No. 5, Tunji Oluwole Street, Off Fola Agoro, Somolu Yaba, Lagos state.
Project: PIPING OF STORAGE IN DANGOTE OIL
REFINING LIMITD
Position: PROJECT ENGINEER
Job Responsibilities:
Preparing, scheduling, coordinating, and monitoring of assigned engineering projects
Formulating project parameters and assigning responsibilities to the most capable employees and monitoring the project team.
Interacting with clients, interpreting their needs and requirements, and representing them in the field.
Preparation of material list and checking of material supplied as specified in drawings.
Supervision and daily report of work progress in fabrication yard and piping erection at storage tank.
Performing quality control tasks on budgets, schedules, plans, and personnel performance and reporting on the project's status.
Cooperating and communicating with the project manager and other project participants and collaborating with senior engineers to create more efficient project methods and to maintain the project's profitability.
Reviewing the engineering tasks and initiating the necessary corrective actions.
Developing specifications for the project's needed equipment.
Preparation of invoice to clients.
Break down of work methods and step by step procedure for executing works.
Planning for new job commencement, preparation of work schedule and methodology. Understanding project specifications and developing time schedules and budgets that meet them.
Negotiating with vendors and contractors to secure the best prices.
Observing existing processes, analyzing staff performance, and addressing deficiencies accordingly.
Analyzing technical drawings and providing material and cost estimates.
Ensuring all projects are completed on time and within budgets.
Preparation bill of materials from P & ID and Isometric drawings
Selection electrode according to the composition of material supplied
Preparation of Weld map
Preparation of Inspection and Test plan
Company: [ MARCH 2020] CHEMIE-TECH LIMITED FREE TRADE ZONE, IBEJU LEKKE,
LAGOS STATE
Third Party: WADRIK PROJECTS LIMITED (WPL)
Location: No. 5, Tunji Oluwole Street, Off Fola Agoro, Somolu Yaba, Lagos state.
Project: PIPING OF STORAGE IN DANGOTE OIL
REFINING LIMITD
Position: PROJECT ENGINEER
Job Responsibilities:
Interpretation of Storage tank piping Drawings
Interpretation of Isometric drawing (materials and cut length)
Preparation of material list and checking of material supplied as specified in drawings.
Supervision and daily report of work progress in fabrication yard and piping erection at storage tank.
Interfacing with our client and WPL on work progress and challenges at various sites.
Fabrication of piping rings for storage tanks, involving, cutting to size, threading of pipe, rolling of pipe and welding of various diameters.
Preparation of QAQC fit-up and welding report.
Examination of welded joints for defects visually.
Preparation of invoice for WPL billing to our clients.
Break down of work methods and step by step procedure for executing works.
Planning for new job commencement, preparation of work schedule and methodology.
Qualification of WPS
Qualification of Welders using WPS
Preparation bill of materials from P & ID and Isometric drawings
Selection electrode according to the composition of material supplied
Preparation of Weld map from engineering drawing
Preparation of Inspection and Test plan
Hydro testing of fabricated lines
Company: [2019] ONSHORE CONSTRUCTION FREE TRADE
ZONE, IBEJU LEKKE,
LAGOS STATE
Third Party: TATACOMS INTERGRATED RESOURCES
LIMITED
Location: 357 Nnebisi Road Asaba, Asaba Delta State. Project: UNDERGROUND PIPING OF INTERMEDIATE
TANKS
Position: SITE ENGINEER / MANAGER
Job Responsibilities:
Interpretation of General Area Drawing
Interpretation of Isometric drawing (materials and cut length)
Inspection of fittings as per specification on isometric
Supervision of lowering of manhole
Preparation of progress report and tracking work progress
Managing of manpower and equipment used for the project
Preparation of Inspection and Test plan
Check fit up
Ensured workers adherence to WPS and monitoring welders during welding
Prepared daily inspection report, progress report and welder’s performance report.
Ensuring manhole and piping erected have the right elevation as per isometric.
Ensure NDT is carried as per specification for joint types
Supervision of coating of approved welded joints
Holiday testing of underground pipe
Interpretation of NDT
Company: [2018] RUTH’RFORD SERVICES LIMITED
Location: Plot 3 & 4 Warri Refinery – Ughoton Road Ughoton, Delta State
Project: PRESSURE REGULATING METERING STATION
Position: QUALITY ASSURANCE QUALITY CONTROL
Client: ZAKHEM CONSTRUCTION NIGERIA LIMITED /
DANGOTE FERTILIZER LIMITED
Job Responsibilities:
Foundation preparation of skids and pipe support
Preparation of Weld Procedure Specification
Interpretation of Piping and Instrumentation Drawing
Interpretation of plant layout and the various Isometric lines
Identification plant layout skid position
Installation of skids and alignment of the various
Grouting of the skid
Identification of pre-fabricated vendor spools
Installation of vendor spool
Fabrication of spool from Isometric drawing
Installation of valve and various fittings as required by P&ID and Isometric Drawing
Installation of fabricated spool
Fabrication and installation of pipe support
Examination of weld joints
Qualification of Welders using WPS
Preparation bill of materials from P & ID and Isometric drawings
Selection electrode according to the composition of material supplied
Preparation of Weld map from engineering drawing
Preparation of Inspection and Test plan
Hydro testing of fabricated lines
Re-statement of fabricated lines and installation of gasket
Leak test of the Station
Check fit up
Ensured workers adherence to WPS and monitoring welders during welding
Visual Examination of weld.
Prepared daily inspection report, progress report and welder’s performance report
Company: [2017] R.N Ducs International Limited
Location: 1 R.N Ducs Close off Jonah Street By
Onukem Odara Okporo Road, Rumuodara
Port Harcourt
Position: Quality Assurance and Quality Control Advisors / Welding Engineer
Job Responsibilities:
Analysis of Weldment to verify the Strength of weldment
Checked dimensional accuracy, alignment and edge preparation of material to be welded
Ensured workers adherence to WPS and monitoring welders during welding
Lifting and Hoisting of different materials (Erection Process, Cargo Movement and Building Construction)
Performed material inspection on pipes, drilling pipes, plates and other materials
Conducted quality control auditing
Prepared daily inspection report, progress report and welder performance report.
Inspecting general sandblasting activities
Performed Dye penetrant (Liquid penetrant) inspection, Ultrasonic inspection, Magnetic particle inspection and Radiographic Inspection
Updated NDT reports
Provided right Interpretations of Radiographs films
Inspection and Certification Cargo carrying units.
Lifting equipment inspection and certification
Welding machine inspection, calibration and certification Company: [2014-2017] Ben-Mem Nig. Ltd
Location: Opposite Lawfab Hotel, Osubi Okpe, Delta State. Position: Assistant Inspector.
Job Responsibilities:
Inspected several heavy weight drill pipes using visual inspection, magnetic particle test, radiographic test and ultrasonic testing methods
Inspected Several drill collars using visual inspection, magnetic test, radiographic test and ultrasonic testing methods
Inspected several drill pipes using visual inspection, magnetic test, radiographic test and ultrasonic testing methods
Company: [2009 -2013] Dimatab Technical Service Ltd Location: Km 1 Ubeji-Jeddo Road, Epkan, Delta State Position: Welding Supervisor.
Job Responsibilities:
Involved in the construction of underground filling station tanks
Interpretation Welding symbols and Signs
Fabrication of stool supports for offshore structure
Fabrication of surface tanks and Filling station canopy
Installation of filling Station Canopy
Fabrication and Erection of Stanchion for storage of Water in swamp
Foundation preparation for Stanchion Installation
Maintenance of Cargo carrying units CNL
Checked dimensional accuracy, alignment and edge preparation of material to be welded
Ensured workers adherence to WPS and monitoring welders during welding
Monitored pre-fabrication and field installation of pipes
Performed material inspection on pipes and piping component
Pipe line laying and hydro testing
Prepared daily welding report, progress report, welder’s performance report, weld traceability
Inspected general sandblasting activities
Performed Dye penetrant (Liquid penetrant) test, Ultrasonic test and Radiographic Test
Provided right Interpretations of Radiographs films CONFERENCES ATTENDED
International Institute Welding Conference (IIW) Abuja 2009
Nigeria Institute of Welding Conference (NIW) 2010
Ecowas Welding Conference Lagos 2014
RESEARCH WORK
Analysis of a Flash Butt and Manual Metal Arc Weldment
Analysis of Water Sample using ANOVA to ensure Quality Control
Effect of edge preparation on the Strength of Weld and Combination Weld
Briquette development from hycent grass and sawdust COMPUTER PROFICIENCY:
Microsoft office (Word, Excel, Project and Power Point)
Navisworks
Hobbies: Reading, surfing the internet, interacting with people. Referees: Available upon request.