ACADEMIC DETAILS
1. Bachelor’s in Electrical Engineering
2. Diploma in Electrical and Electronics Engineering
TRAINING & CERTIFICATION
1. Lead Auditor Training with QMS ISO9001:2008..
2. ETAP 115 Power System Engineering.
3. Computer Aided Drafting and Design.
4. Building Construction Supervisors Safety Course.
5. Cost Engineering.
6. Contract Management.
7. MS Office 2010.
PROFESSIONAL PROFILE
Lead Project Engineer with 24+ years experience in Project Management, Detailed Engineering, Execution & Construction, Maintenance, Supports to Planning, Contract Administration, Procurement, Hiring Personal, and Ensuring Safety for various Electrical & Instrument (Green and Brownfield in Oil & Gas, LNG, Steel, Airport complex, Power & Distribution system, Resorts & Residential Buildings) Projects.
A recognized leader with the ability to lead project teams throughout the full cycle of time critical and highly complex projects.
A skilled communicator with honed relationship with management, people, analytical and problem-solving skills.
Ability to work under pressure situations and beat deadlines.
CORE SKILLS
Integrity and trust
Leadership
Self Initiative
Analytical Skill
Business acumen
Strategic agility
Drive for result
Organisation agility
Timely Decision Making
Ability to work under pressure
Ability to work multi cultural environment
PROJECT SNAP SHOT
1. Oil and Gas Project
I.Maintenance work for E&I work at JMD C2 Complex for Reliance Ind. Ltd, Jamnagar, Gujarat, India.
II.Const. FAT & SAT 26 Nos. 11/0.400KV Packaged Substations for KMPC & KIPIC New Refinery Projects, Kuwait.
III.EPC work of E&I systems of 5.00MTPA New LNG Receiving Terminal for IOLPL Ennore, Tamilnadu. India
IV.Installation of Field Equipment at air fin cooler area for Pearl GTL Plant, Raslaffan Industrial City, Qatar
V.HCU Expansion Project for IOCL Panipat Refinery, Haryana, India
VI.Qatar Petroleum PS-2/3 Living Quarters and Power Upgrade Project, Surat, India
VII.DHDS Project for Hindustan Petroleum Corporation Ltd, Vizag, A.P
2. Power Plant, AIS/GIS SS
I.Maintenance work for PPN 3x360MW Gas Based Combined Cycle Power Plant, Nagapatnam, Tamilnadu, India.
II.2x400MW (KA26-1Single Shaft Combined Cycle) Keppel Merlimau Co-gen Power Plant, Jurong Island, Singapore
III.Inst./Test/Comm. Of 220/66/11/0.400KV GIS Substation for Qatar Power Transmission System Expansion Project– Phase VI., Qatar.
IV.Construction of 3x30MW Co-gen Power Plant for Vedanta Alumina Ltd, Lanjigarh, Orissa, India
V.Expansion of 315 MW Captive power plant & 220KV Switchyard and Installation Tower line in Vizag steel Plant, Vizag, A.P
VI.Const of 6X150MW Srisailam Hydro Power Station and 15x400 KV GIS Indoor switchgear assembling (HITACHI GIS Switchgear) and comm. for APGENCO, Srisailam, A.P
CAREER SUMMARY
March’2020 – Present
SJN Engineering Services, Chennai, Tamilnadu, India
Lead E&I Engineer
Project: Comprehensive Maintenance work for Electrical and Instrumentation work at JMD C2 Complex, Jamnagar, Gujarat.
Client: Reliance Industries Ltd. Jamnagar, Gujarat.
Main Contractor: EDAC Engineering Pvt. Ltd. Chennai, Tamilnadu, India
Key Task Handled:
Executing electrical maintenance works with quality manner
Review maintenance activities, and prioritize critical jobs. carry out scheduled and chance based maintenance of electrical equipment
Reviewed job impact delivery impact situations
Ensure compliance to standards, procedures and best practices, procedures of QMS, EMS current practices
Conduct regular troubleshooting and root cause analysis
Manage and lead a multi-disciplined maintenance and engineering team
Be conversant with project KPI’s and support their delivery and attainment at all times
Direct the team to support shutdown and turnaround planning and resourcing
Ensure completion reports are submitted against each and all project work and shutdowns and turnarounds
Support to clients’ manager in spares inventory management to maintain stock levels & issuing Spares for job execution
Support to clients’ manager in shutdown planning and execution
Carry out risk assessment and adhere to all the safety norms in routine and shutdown jobs
Attend and closing audit related comments
Maintain E&I equipments history/ records
Providing technical guidance, training to sub ordinates.
Carry out HSE and technical audits and inspections as directed by project manager
Strong HSE awareness in the following areas:
a.Risk recognition / Risk awareness
b. Permits to work, toolbox talks & checklists
c. Confined space entry procedure
d.Criticality of gas testing method and frequency
e. Awareness of H2S and N2 hazards
f.Manual handling techniques
g. Correct use of, PPE, Working at height
h.Simultaneous operations hazards
i.Dropped objects & trip hazard mitigation
j.Report HSE incidents and all near misses
Nov’2016 – Feb’2020
Al-Ahleia Switchgear Co. K.S.C.C, Kuwait
Lead Electrical Engineer
Project: 1. KIPIC Al- Zour New Refinery Project (Package -1), Kuwait
2. KNPC Clean Fuel Project (Green & Brown Field Project), Kuwait
Clients: 1. Kuwait Integrated Petroleum Industries Company
2. Kuwait National Petroleum Company
Main Contractor: 1. TSHJV (Joint Venture established between Tecnicas Reunidas., Sinopec and Hanwha)
2. JGSK (Joint Venture of JGC, GS and SK.)
Project Outline: Executing 26 Packaged Substations (Modules) together with all associated in built and external equipment (HV, LV Switchgear, MCC Panel, Busduct, UPS System, Lightings, Transformers, Automation, Telecom, F&G, HVAC after completion of FAT deliver to site to get complete mechanical completion, SAT and Pre Commission. (Project Value: 160 Million Kuwait Dinars)
Key Task Handled:
Managed E&I construction work being carried out as EPC contractors for major Green and Brownfield projects in compliance with contract requirements including scope, schedule, quality, while managing risk, improving margin, and exceeding customer expectations
Prepared mitigation plan based on engineering deliverables and procurement schedule to enable efficient execution to meet project milestones
Coordinated closely within the project team, subcontractors’ team and facilitated the safe progress of works
Ensure work shall be carried out by the site staff under strict supervision and guidance of the concerned supervisors / Foremen / Engineers
Coordinated closely with the procurement manager to material availability at site
Coordinated with multinational vendors and suppliers team to smooth execution and job completion
Attended progress review meeting with Project Manager and other Segment Head (Design, Planning, and Procurement) and take required action to complete the project within the agreed time schedule
Attended weekly progress review meeting with Clients
Managed multi execution team for installation of 30MVA, 5MVA transformer, NER & bus duct, 11 & 6.6KV HV Panel & 400V LV Panels, battery & 220V DC UPS panel, fire alarm system, telecom system, HVAC system, cable laying & termination, cable tray installation and maintain substation pressurization
Leads brownfield interface coordination with KNPC and JGSK team to develop execution plans to tie-in to existing systems
Reviewed electrical drawings and made corrections as per site requirement and prepare site notes for implementation prior to installation
Check all material delivered to site is inspected properly by QA/QC Engineer and check if it is stored properly as per manufacture’s recommendations
Check MIR shall be raised for the inspection of material received at site by QA/QC Engineer to the Main contractor / Consultant Engineer
Conducts spot surveillance of all craft disciplines to assure high quality standards of workmanship are maintained
Performed conformance audits and advice construction team / subcontractor of corrective actions and / or assist them in the resolution & closing of NCRs
Performed walk down and final inspection (punch list creation and closing) in coordination with clients, PMC field engineers team
Coordinate / Participate with testing team (Third Party and Vendors) to perform following areas substation commissioning activities 1.NHTU (Naphtha Hydro treating Unit, 2. HOC (Heavy Oil Cooling Unit, 3. CDU (Crude Distillation Unit), 4. ARDS (Atmospheric Residue Desulphurization Unit)
Input provided to preparation and submission of project handover dossier for all Electrical, HVAC and F&G system
Reporting to the project Director / Manager regarding site progress, problems needing resolution and suggested solutions
Ensure service area/work area openings are provided with barricade, tape, safety nets and warning signage to be provided (Danger: High voltage)
Ensure LOTO procedure to be followed and implement comprehensive logout & tag out during execution of works.
Intervene and stop the work if unsafe acts are being committed. Maintaining and ensuring site safety at all time
Assist with incident investigations, reviewing incident reports and ensuring that any relevant corrective/preventive actions are implemented
Achievements: Led the project team to execution, installation, de-assembling, mobilization and delivery to site, FAT & SAT and commissioned of the 26 Pre-packaged substations within time and schedule
Apr’2015 – Oct’ 2016
KSS- Petron Pvt. Ltd. Chennai, Tamilnadu, India
Senior E&I Engineer
Project: Engineering, Procurement, Construction of Electrical and Instrumentation systems of 5.00MTPA New LNG Receiving Terminal for IOLPL Ennore, Tamilnadu. India.
Client: Indian Oil LNG Private Ltd, Ennore, Tamilnadu, India
Main contracts: Black & Veatch Corporation
Key Task Handled:
Coordinated with client construction team for preparing daily action plan, solving execution difficulties pertaining to materials, manpower and helping in effective manpower utilization
Resolved electrical discipline issues to ensure project’s expectations and specifications. Communicate and elevate issues before they escalate to project management team when necessary
Communicated the necessary information to all project team members recording develop, update and amend design / project philosophies, specifications and procedures ensuring that all references are current and relevant
Coordinated and analyses discipline issues for resolution. Provided electrical engineering changes to other engineering disciplines, construction, procurement etc as necessary. Support commissioning and system completing activities and makes appropriate recommendations to management on electrical matters
Checked all material received at site shall be inspected and ensured that the materials are as per approved material submittal
Supervision for Installation of all substation and field electrical panel boards / equipments, LCS & DB, cable trays, indoor / outdoor / emergency lightings, earthing as per project specification, standard and data sheets
Supervision for Installation of field and control room instruments for pressure, flow, level temperature, vibration, smart transmitters, controllers, recorders, control valves & safety valves as per a standard procedure in gas tanks, gas turbine, shipping pumps, compressors, separators etc
Ensures that the tests, controls and inspections are carried out and that personnel have access to all required project documentation
Coordinates with QA/QC Team and clients for inspection of E&I equipments
Action and close all customer complaints, control all achieve documentation upon the completion of the project
Jul’14 – Mar’15
Coastline Hotels and Resorts Pvt Ltd, Maldives
Senior Electrical Engineer
Project: Construction of Amilla Fushi Luxury Resorts (Tree Houses, Beach villas, Ocean Houses) and Residence building including 8x800KW Power house and RO Plant at BAA Atoll Island, Maldives (Total Buildup Area 26,853 sqm)
Owner: Coastline Hotels and Resorts Pvt Ltd, Maldives
Key Task Handled:
Managed contractor work on behalf of owner to ensure EPC contractor develops detailed design in accordance with local regulatory requirements, industry standards, project specifications and any approved variations.
Took ownership of electrical crew scheduler developing short and long term look-ahead schedule to align with execution plan
Reported any work carried out by the contractors found to not be in accordance with approved drawing and specification and report to the project director / manager for appropriate action
Attended to inspection request (RFI’s) submitted by the contractor and take appropriate action in a timely manner
Managed the subcontractor for installation, pre-commissioning and commissioning of diesel generator and power plant auxiliaries. (8x800KW Make: Cummins, Singapore)
Issued approval for hot/cold works, equipment lock out/tag out during pre-commissioning & commissioning activities
Inspect incoming materials by confirming specification, conducting visual and measurement tests, reject and returns unacceptable materials
Prepared surveillance reports for deficiencies of work found at site and non conformance reports (NCR) if required in view of the development of events
Provided technical input and experience to resolve any discipline related issues that may rose at site
Feb’13 – June’14
G.P. Engg and Constructions, Tamilnadu, India
Senior Electrical Engineer
Project: Maintenance work for PPN 3x360MW Gas Based Combined Cycle Power Plant, Nagapatnam, Tamilnadu, India.
Client: PPN Power generating Company Private Ltd. Nagapatnam, Tamilnadu, India
Key Task Handled:
Gather the information about electrical system related from plant O&M team and resolved the issues
Managed and controlled the project as per site requirements/quality/safety procedures
Provided technical support to the plant O&M team
Prepared and submitted claimed monthly interim invoices
Getting an approval of variations/claims as per contract
Prepared site note valuation for items not listed in scope
Anchored on-site erection & commissioning activities and ensuring completion of assignment within the time & cost parameters and effective resource utilization to maximize the output
Aug’12 - Jan’13
Jurong Engineering Ltd, Singapore
Chief Engineer – E&I
Project: 2x400MW (KA26-1Single Shaft Combined Cycle) Keppel Merlimau Co-gen Power Plant, Jurong Island, Singapore
Clients: Keppel Corporation, Singapore
Main Contractor: Alstom Power Singapore Pte ltd, Singapore
Key Task Handled:
Coordinated with the different department focal for the delivery of Turnaround strategy and plans
Ensure the turnaround work packs are closed-out (No of package 100). Report the same to Project Manager.
Attended daily progress review meetings with clients and internal teams
Modified active schedule/milestone with day to day activities
Prepared as-built drawings and material reconciliations
Verification and approval of subcontractor interim monthly progress
Apr’11 - Jun’12
Markwell Engineering Services and Trading Co. W.l.l, Doha, Qatar
Project Engineer
Project: 1. Pearl Gas to Liquid Plant, Raslaffan Industrial City, Qatar
2. Extension of Sewage treatment Plant, Doha West, Qatar
Clients: 1. Shell Pearl GTL Project, Raslaffan, Qatar
2. Doha West STP, Doha, Qatar
Main Contractor: 1. Chiyoda Corporation, Japan
2. Degremont Marubeni Joint Venture, Doha, Qatar
Key Task Handled:
Served as the senior site representative for all matters related to construction, quality assurance and preparation of interim invoice and closing note based on scope of electrical works
Coordination and supervision of all electrical shutdown activities and operations
Over see the invoicing, payment collection & maintaining all records pertaining to project
Attended daily and weekly meetings with main contractors
Prepared micro schedule and get approval from main contractors to take up equipment shutdown
Prepared method statement and risk assessment for day to day installation and testing activities
Deployed suitable manpower and handling material planning to ensure timely execution of the projects
Ensured substation and field electrical equipment log out / tag out as per safety norms
Reviews and Red mark-up of E&I drawings
Monitors all QA/QC related activities on the project
(Jun’08 – Feb’11)
Emirates Trading Agency, Dubai, U.A.E
Project Engineer
Projects: 1. Dubai Metro (Red Line Station), Dubai, U.A.E
2. Dubaï International Airport MEP Works for Concourse # 3, Dubaï, U.A.E
Clients: 1. Roads and Transport Authority, Dubai, UAE
2. Department of Civil Aviation - Dubai
Main Contractor: 1. Dubai Rail Link (DURL) Consortium, Dubai, UAE
2. Al Jabber Engineering & Contracting (ALEC) LLC, Dubai, UAE.
Key Task Handled:
Studying specs, verifying drawings, quantity take-off, BOQ drawings, the preamble of measurements and other technical documents, co-ordinate with other team-mates as a team leader
Preparation of site note valuations for items not listed in BOQ, taking the approval of rates in accordance with the contract
Reviewed and monitored the availability of drawings, specifications, job instructions, material deliveries and tools applicable to discipline and area of work
Led the project teams through contract reviews to identify & manage risks, monitor constructional performance against the agreed time scales, and initiates corrective action where appropriate
Supervised Installation & Testing of MEP Equipment & Lighting Systems
(Sep’06- May’08)
Qatar Electro-Mechanical Co. W.L.L, Doha, Qatar
Site Incharge
Project: Qatar Power Transmission System Expansion Project– Phase VI
Client: Qatar General Electricity & Water Corporation (KAHRAMAA), Doha, Qatar
Main Contractor: Siemens Consortium, Germany
Key Task Handled:
Managed and coordination of 220KV&66KV GIS switchgear equipment 200MVA, 60MVA, 40MVA transformers and shunt reactor, 11KVswitchgears, MCC, control and relay panels, lighting, dc charger panels and battery installation, inspection and testing for below mentioned substations
1.220/66/11KV GIS substation, west bay super#2, Doha, Qatar
2.66/11KV GIS Substation, South west wakra, Qatar
3.66/11KV GIS Substation, Mesaieed 1&2, Qatar
Planned and supervision of HV & LV cable laying & termination, cable tray, lighting and earthing installation
Deployed suitable manpower and handling materials planning to ensure timely execution of the projects
Monitored and Controlled site mobilization, safety as per requirements
(Note: Project 2&3 construction activities handled at together, Project Value 5.000 Million UAE Dirham)
(May’03 - Aug’06)
Spic Jel Engineering & Construction Ltd., Chennai, India
Site Engineer
Project: 1. HCU Expansion Project for IOCL Panipat Refinery, Haryana, India
2. 3x30MW Co-gen Power Plant for Vedanta Alumina Ltd, Lanjigarh, Orissa, India
Clients: 1. Indian Oil Corporation Ltd. (IOCL), Haryana, India
2. Vedanta Alumina Ltd, Lanjigarh, Orissa, India
Main Contractor: 1. Daelim Industries Co. Ltd. Korea
2. China National Machinery & Equipment Import & Export Corporation (CEMC), China
Key Task Handled:
Supervised 3.3KV HV & LV Panel Installation, HV/LV cable laying & termination, testing & commissioning of LV panel boards, motors and Plant Indoor Outdoor Lighting
Supervised Grid & Equipment earthing, Motors, LCP cable termination Testing & Commissioning
Supervised installation of field equipment like DB, Local Push Button and steel structural works
Supervised and Coordinated for Installation Testing and Commissioning of Coal Handling Unit, Stocker and Reclaimer and conveyor belt.
(Nov’93 - Mar’00)
Larsen & Toubro Limited, ECC Division, Chennai, India
Supervisor
Projects: 1. Qatar Petroleum PS-2/3 Living Quarters and Power Upgrade Project (Offshore Platform Constructed at L&T Hazira Terminal (Onshore), Gujarat, India. After Completion of FAT it had mobilized to Qatar offshore base)
2. DHDS Project for Hindustan Petroleum Corporation Ltd, Vizag, A.P
3. Expansion of 315 MW Captive power plant & 220KV Switchyard and Installation Tower line in Vizag steel Plant, Vizag, A.P
4. 6X150MW Srisailam Hydro Electric Station and 15x400KV GIS Indoor switchgear assembling (HITACHI GIS Switchgear) and commissioning for APGENCO, Srisailam, A.P
Key Task Handled:
Supervised and monitored, expedited of subcontractor activities for Installation of 220KV Switchyard equipment Installation, Tower Installation and stringing of conductor
Supervised MCT installation, electrical structural works and HV & LV cable laying and termination as per approved drawing and standard for QPS – 2/3 Project
Preparation and execution of cable laying and termination schedules as per approved drawings for QPS – 2/3 Project
Prepared and getting approval of pending activities from clients to carry out at offshore hookup.
Testing & commissioning and troubleshooting and feeder modification of 3.3KV HV, LV switch gears, Transformer and MCC Panels for DHDS Project
Supervision and Installation, testing and commissioning of 220KV, 110KV, 33KV switchyard equipment, cable tray and lighting for Vizag Steel Plant
Installation testing & commissioning of 400KV Switchyard & GIS Substation equipments for APGENCO
Loop checking of field instruments and LCC
Battery charging, oil filtration activities done as per approved document and standard
ACADEMIC DETAILS
Bachelor’s in Electrical Engineering: Asian Institute of Management and Engineering, Delhi, India
Diploma in Electrical and Electronics Engineering: S.N. Educational Research and Examination Board, Tamilnadu, India
TRAINING & CERTIFICATION
Lead Auditor Training with QMS ISO9001:2008 Integrated Associated Services Pvt. Ltd, Chennai, Tamilnadu
ETAP 115 Power System Engineering: Etap Automation Private Limited, Chennai, Tamilnadu
Computer Aided Drafting and Design: Practical Technologies for Engineers & IT, Madurai, Tamilnadu
Building Construction Supervisors Safety Course: Absolute Kinetics Consultancy Pvt. Ltd. Singapore
Cost Engineering: Chicago Management Training Institute, Dubai, U.A.E
Contract Management: Zabeel Institute of Management & Technology, Dubai, U.A.E
SOFTWARE SKILLS
Microsoft Office 2010
AutoCAD 2014
PERSONAL DETAILS
Date of Birth: 10th May 1972, Age:- 49
Permanent Address : Madurai, Tamilanadu, India
Passport Details: T6760595, Place of Issue: Kuwait, Date of Expiry: 08/09/2029
Availability : Immediately
Covid 19 Vaccinated Status: Fully Vaccinated (2 Doses) and a Precaution Dose (20 Apr 2022)