Post Job Free
Sign in

Aramco Industrial Training

Location:
United Arab Emirates
Posted:
June 09, 2022

Contact this candidate

Resume:

Email : **********@*****.***, **********@**********.***

Phone No : No: +91-983*******, +91-983*******, 009**-**-*******

Indian Passport No: T6484630

Nationality Indian

Year of Birth 1968

Profession Pipeline Designing

Position in Group Sr Pipeline Designer

KEY QUALIFICATIONS

An overall professional experience of more than 31 years with Multi-national organizations in India and abroad. At present working with Denfab engineers pvt. Ltd Delhi, as a Sr Pipeline Designer. Before joining Denfab engineers pvt ltd worked with SNC-Lavalin, / WS Atkins &Partners Overseas O&G Division Sharjah, UAE. As Sr. Pipeline Designer in Onshore and Offshore Pipeline Project for Pipeline route survey, preparation of Alignment Sheets, Feasibility study of Pipeline route, Station approach drawings. Offshore overall Pipeline route layout, Offshore Pipeline Alignment sheets, Shore Approach Drawings, Typical Drawings for Field joint coating, Pipeline Anod Drawing, Mono block Insulation unit pit General Arrangement & Reinforcement Details, Anchor Block Drawings, Hydrotest Dragrams.

British Petroleum in Iraq Flowlines Routings from Wells to Degassing Station, Site Visit in Iraq for Routings Flowlines.

Before joining WS Atkins &Partners Overseas I have worked with Mott mac Donald Abu Dhabi Our client Qatar Petroleum, ADCO, ADMA, BP, Lukoil, KOC, China Petroleum, Gazprom, CPE etc.

HEISCO Kuwait, in their EPC Oil & Gas Projects for clients including Kuwait Oil Company, Kuwait NPCC, KGOC – Texaco Joint Operations, Ministry of Electricity & Water, Petrofac etc.

Surveys of facilities in the Southern Basrah area to assist Shell in determining the condition of the facilities so as to identify any remedial work required to improve future operation. The facilities comprise both Gas Compression Stations and the in-field and transmission gas Pipeline.

Conversant with International Standards as well as Client Standards.

Specialties: –Conversant with all relevant international drawing codes and Stds. (ASME/ANSI, API, BS, DIN, ISO, QATAR PETROLEUM Standards, ADCO Std., GASCO Stds, Adnoc & Other Clients etc

Areas of expertise include:

I have been working with British Oxygen Limited in their Cryogenic and special Project divisions. Besides I have worked in Consulting Engineering Services like Birla Technical Services etc. All these professional experience helped me to perform my duties as a Design Draughtsman with Minimum supervision, and also with high level competence.

Associated in below project: -

FEED for Provision facilities for securing supply for FIFA 2022 (Qatar Petroleum)

11 kms of 30” Gasoline Pipeline for Multi-product berth (MPB) to Qatar petroleum Refinery (QPR).

FEED for new Tank Farm, Multi Product Pipeline &Birth Modifications in Mesaieed (Qatar Petroleum)

23 kms of 20 inch Multi product pipeline from New tank farm to New fuel depot.

FEED FOR New LPG Bottling Plant Project at Ras Laffam (Qatar Petroleum)

5 kms od 8 inch LPG Pipeline from A4 station to LPG Bottling plant.

ADNOC OFFSHORE

Project: FEED Services of Umm Shaif Long Term Development Plan – Phase 1 (US LTDP-1)

Responsibilities –Preparation of Field layouts, Pipeline Route Plans, Platform Approach, Generic Pipeline drawings.

Project: UMM AL DALKH EARLY PRODUCTION COMBINED CONCEPT AND FEED PROJECT.

Responsibilities – Preparation of Field layouts, Pipeline Route Plans, Platform Approach, Generic Pipeline drawings.

Project: Master Gas System Expansion Phase II. (Onshore)

Client: Saudi Aramco Oil Company

Route Study with reference of Google Earth, QGIS, Deliverables in Microstation.

Design, checking and detail engineering for Pipelines, Route Map, Alignment sheet, Typical Construction Details, Crossing Detail, Station Approach Drawings. Monitor and guide junior designers.

Prepare MTO for the materials involved.

Project: Feed For Pipeline & GDS TIE-INs For CNG Station - Qatar Petroleum (Project got on hold after 5 months works)

* 16” CNG Pipeline 17 Km.

* 14” CNG Pipeline 16 Km

* 12” CNG Pipeline 15 Km

* 10” CNG Pipeline 12 Km.

Preparing the Route Layout, Alignment Sheets, Station Approach, MTO, Valve Station Layout, Pipeline Crossing Drawings, Crossing Matrix, and Typical Details Drawings.

–LOWER FARS HEAVY OIL DEVELOPMENT, PHASE-1, (60MBOBPD) Project No. EF/1852 KUWAIT. DETAIL ENGINEERING.

–CONCEPTUAL DESIGN SERVICES FOR ELEVATION OF FLOWLINES IN BAB, BU-HASA.

–QATAR PETROLEUM- FEED for Domestic Supply of Butane for NGL Complex to QP Refinery.

–CPE – TANZANIA SUBSEA PIPELINE (Offshore)

–ADCO – FEED for Nitrogen Gas Injection (NGI)

–ADCO - FEED for CO2 Gas Injection (CRI)

–Pipeline Route Survey in ADCO BAB Field, Al Dabbiya Field, NED Field, ASAB Field

–GAZPROM Gas Export Pipeline 103 KP. NEFT BADRA Field IRAQ.

–LUKOIL 42 DIA Onshore Export Pipeline West QURNA Field IRAQ EPC Project.

–Pipeline Route Survey in Rumaila Oil Field North & South Zone in IRAQ.

–QATAR Petroleum Strategic Gas Transmission Project (EPIC)

- Preparation of Pipeline Route Map, Alignment Sheets, Pipeline Crossing Details, Survey of Pipeline Route, Crossing Matrix, SBV Plot plans, Overall SBV Plot plans, SBV GAD etc

–Cross country pipeline design.

–Preparation and checking of detailed engineering drawings

–Preparation and Checking of MTOs

–Checking and reviewing of piping/pipeline drawings with respect to lay-out, as-built engineering

–Final drafting of pipeline route, plot plans, station approach, alignment sheets and all other pipeline related drawings.

–Conversant with all relevant international drawing codes and standards (ASME/ANSI, API, BS, DIN, ISO, QP Standards, ADCO Standards, GASCO Standards & Other Clients etc.).

British Petroleum in Iraq Flowlines Routings from Wells to Degassing Station, Site Visit in Iraq for Routings Flowlines.

EDUCATION AND PROFESSIONAL STATUS

Passed Mechanical Draughtsmanship from Industrial Training Institute, with 76% & stood Second position. In the year 1987. (Govt. of West Bengal).

Passed N.C.T.V.T. (A.I.T.T.) From Central Training Institute. Govt. of India. In the year 1989.

Computer software packages conversant with

- Auto CAD (Release 2007,2008, 2010 & 2018)

- Micro Station V 8 I (Series 3)

- Smart Plant P and Id

- Basic knowledge in PDS.

EXPERIENCE RECORD

Jan 2021 – Till date

Denfab Engineers Private limited Delhi India

Detail engineering for Ahmed nagar GA Gas Distribution (Bharat Gas Resources Limited)

24” Gas Pipeline RGTIL Terminal @ Limpangaon to Ahmednagar.

Jan 2016 – to May 2020

SNC-Lavalin, / WS Atkins &Partners Overseas Sharjah, Oil & Gas Division

FEED for Provision facilities for securing supply for FIFA 2022 (Qatar Petroleum)

30” Gasoline Pipeline for Multi-product berth (MPB) to Qatar petroleum Refinery (QPR).

FEED for new Tank Farm, Multi Product Pipeline &Birth Modifications in Mesaieed (Qatar Petroleum)

1. 23 kms of 20 inch Multi product pipeline from New tank farm to New fuel depot.

2. 8.6 kms 8 inch Jet A1 pipeline from Station T1 to New Fuel depot.

FEED FOR New LPG Bottling Plant Project at Ras Laffam (Qatar Petroleum)

5 kms od 8 inch LPG Pipeline from A4 station to LPG Bottling plant.

Feed For Pipeline & GDS TIE-INs For CNG Station - Qatar Petroleum (Project got on hold after 5 months works)

16” CNG Pipeline 17 Km.

14” CNG Pipeline 16 Km

12” CNG Pipeline 15 Km

10” CNG Pipeline 12 Km.

MASTER GAS SYSTEM EXPANSION - Phase -II Pipeline.

Our Client SAUDI ARAMCO

1. 56" EWG-2 PIPELINE 422 Km.

2. 46" RYSFG-I PIPELINE 20 Km.

3. 24" RBFG-2 PIPELINE 6 Km

4. 46" EWOG-1 PIPELINE 175 Km

5. 56" SRG-2 SEC-III, SALE GAS PIPELINE 42 Km

6. 56" SRG-3 PIPELINE 150 Km

Dec 2008 – to August 2015

Mott MacDonald, Abu Dhabi, Oil & Gas Division

Projects Includes:

-LOWER FARS HEAVY OIL DEVELOPMENT, PHASE-1, (60MBOBPD) Project No. EF/1852 KUWAIT. DETAIL ENGINEERING. 24” Export Oil Pipeline 163 Km. Fuel Gas Pipeline 80 Km. Glass Reinforced Epoxy (GRE Pipe) Make Up Water Pipeline 122 Km. And Disposal Water Pipeline 7 Km.

-CONCEPTUAL DESIGN SERVICES FOR ELEVATION OF FLOWLINES IN BAB, AND BU-HASA. RDS -1 Option-1, 2, 3 and 4 )

-Qatar Petroleum – FEED for Domestic Supply of Butane for NGL Complex

-ADCO – FEED FOR NITROGEN GAS INJECTION (NGI)

-CPE – TANZANIA SUBSEA PIPELINE (Offshore)

-ADCO - FEED FOR CO2 GAS INJECTION (CRI)

-GAZPROM - Gas Export Pipeline 103 KP. NEFT BADRA Field IRAQ.

-LUKOIL 42 DIA Onshore Export Pipeline West QURNA Field IRAQ.

-ADCO - Bab Gas Lift Pilot Project – FEED.

-GASCO – NGL Replacement Project.

-Qatar Petroleum – Gas Supply to Mesaieed Consumers – FEED.

-Qatar Petroleum – EPIC for Multiproduct Pipeline.Qatar

-Qatar Petroleum – Gas Supply to Station V & Station C – EPIC.

-Qatar Petroleum – Strategic Gas Transmission Project – EPIC.

-UPC - Proposal for Capital City District by UPC, Abu Dhabi (Shifting of Existing Pipelines).

-GASCO - Pre-Bid Engineering for ASAB, BAB, BUHASA & RUWAIS modification Project by Dodsal.

-TAKREER - Pre-Bid Engineering for Inter Refineries Pipeline Project, Abu Dhabi.

-Qatar Petroleum – EPIC of Jet A1 Pipeline from BSV-3 to NDIA, Qatar

-Shell – South Iraq Gas Utilization Project, Iraq.

-Southern Oil Company – Rumaila Field Development Project, Iraq.

Responsibilities held :

–Pipeline Route Survey, Site Visit.

- Preparation of Pipeline Route Map, Alignment Sheets, Pipeline Crossing Details, Survey of Pipeline Route, Crossing Matrix, SBV Plot plans, Overall SBV Plot plans, SBV GAD etc

–Cross country pipeline design.

–Preparation and checking of detailed engineering drawings

–Preparation and Checking of MTOs

–Checking and reviewing of piping/pipeline drawings with respect to lay-out, as-built engineering

–Final drafting of pipeline route, plot plans, station approach, alignment sheets and all other pipeline related drawings.

–Offshore overall Pipeline route layout, Offshore Pipeline Alignment sheets, Shore Approach Drawings, Typical Drawings for Field joint coating, Pipeline Anod Drawing, Monoblock Insulation unit pit General Arrangement & Reinforcement Details, Anchor Block Drawings.

–Conversant with all relevant international drawing codes and standards (ASME/ANSI, API, BS, DIN, ISO, QP Standards, ADCO Standards, GASCO Standards & Other Clients etc.).

Other than Mott Macdonald

Heavy Engineering Industries & Shipbuilding Co. (K.S.C)

January, 2005 to October 2008

Worked with HEAVY ENGINEERING INDUSRIES & SHIPBUILDING CO. (K.S.C.), KUWAIT as Sr. Pipeline / Piping & Mechanical Draughtsman.

Job Responsibilities

Preparation of alignment sheets, Station approach drawings, Crossing Drawings, GA of Block Valve Station, Pipeline Typical Drawings, Crossing Metrix, M.T.O, Plot plan drawings, isometrics. Preparing Mechanical Design Drawings and fabrication drawings pertaining to Static Equipments used in Petrochemicals, Refineries, Chemical Plants and Fertilizer Plants like Storage Tanks, Pressure Vessels, Separator and Columns, Reactors and related piping drawings.

Very much familiar with preparation of Pipeline Overall Routing Plan, Piping General Arrangement Drawings, Isometric Drawings, MTO and other details for Gathering Centers.

Preparing Alignment sheets and Route Maps for Cross country Pipelines.

Codes Awareness

Worked on the platform of following codes

ASME SEC. VIII DIV.1

ASME B31.3, B31.4, B31.8

ANSI B16.5,16.47 & ANSI B 16.20

TEMA

API 650

INDIAN BOILER REGULATIONS

Client Standards (GASCO, ADCO, ADNOC, TAKREER, ADMA, Qatar Petroleum)

BOC India Limited

Feb'2001 to January, 2005

As Mechanical/Piping Draughtsman Auto CAD. Nature of responsibility and job involvement is:

Plant layout, General Arrangement of Pressure Vessel, Heat Exchanger A.V Coil, Repair Procedure of VIE, VITT. Internal pipe work and External pipe work of vessel, Piping Isometrics, (Capacity ranging up to 40,000 ltr cryogenic liquid) & storage tanks (Capacity ranging up to 150,000 ltr cryogenic liquid). Equipment layout for Hydrogen Cylinder Test Factory,

Consulting Engineering Services India Ltd.

Sep. 1999 to Feb. 2001 as a Sr. Auto CAD Draftsman.

i) Project:- World Bank Project No. P050648 Calcutta Water Supply.

Consultant:- WESTON INTERNATIONAL (U.S.A), in association with STUP Consultant ltd. & Philadelphia Suburban Water Service.

Job:- Piping Layout for Calcutta City development.

ii) Project:- NTPC - Talcher Thermal Power Project.

Client :- NTPC - (A Govt. of India Enterprise)

Consultant:-McNally Bharat.

Job:- Plant Layout of AWR Piping.

Birla Technical Services :

From 3rd Sep. 1990 to 31st Aug. 1999 as a Piping/Pipeline in the Raw Material Handling Complex (RMHC), Package of Durgapur Steel Plant Modernization & Rourkela Steel Plant Modernization.

i) Project :- Durgapur Steel plant Modernization .

Client :- Steel Authority of India Ltd.

Consultant :- MECON

Prepared :- Plant Layout, Eqpt. Layout Fire Fighting & total Utility system.

ii) Project :- Rourkela Steel plant Modernization

Client :- Steel Authority of India Ltd.

Consultant :- M.N. Dastur & Co. Ltd.

Prepared :- Plant Layout, Eqpt. Layout Fire fighting & total Utility system for Hot Strip Mill, Down

Coil Area etc.

LANGUAGES

Bengali : Mother Tongue

Hindi : Spoken – Fluent; written – Fluent; reading – Fluent

English : Spoken – Fluent; written – Fluent; reading – Fluent

SOMANATH CHAKRABORTY



Contact this candidate