Engineering Consultant Site Engineer

Location:
Dubai, United Arab Emirates
Posted:
April 07, 2022

Contact this candidate

Resume:

Profile

Achievement-driven professional offering over 16 years’ experience in

Construction and Project Management

Executed multi-million-dollar construction projects including Construction of Tilal Al Ghaf Community, New Road Links Sheikh Khalifa Road, Al Maqam & Zakher schools, Sheikh Hamdan Mosque, Sheikh Khalifa Marine Research Centre -, AL Falah Community Village Retail, Abu Dhabi Court House, Dubai Biotechnology & Researching Park - Dubai Headquarter, Ruwais Housing Complex.

Education

Bachelor's degree: Civil Engineering, Sudan University Of Science & Technology

Khartoum - Sudan 2000 - 2005

Employment History

Senior Structural Engineer - ARE, (ECG)

Dubai 2021 October - Present

Project Name: Tilal Al Ghaf Harmony - HR1

Client: Majid Al Futtaim

Consultant: ECG

Main Contractor: ASGC Construction LLC & United Engineering Construction Project Description:

Construction of 241 Precast Villas

Project Manager, Al Naser International L.L.C

Al Ain 2020 August - 2021 October

Project Name: Construction of New Road Links Sheikh Khalifa Road Client: Tecom Investment, Govt Of Dubai.

Consultant: CORE Engineering Consultancy LLC

Main Contractor: National Contracting & Transport Co. LLC. Project Description: Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Area through Al-Madam to Al-Showaib Area (Phase - 3) From Sharjah Border to Al-Showaib Roundabout Area at Al-Ain Scope of work:

AHMED

HASSAN

+971*********

adqpmr@r.postjobfree.com

Abu Dhabi, UAE

Birth Date

05/11/1980

Nationality

Sudanses

Driving License

UAE

Languages

Arabic

English

Skills

Revit Civil - Architectural - MEP

Auto CAD 2D - 3D

Primavera P6

Etabs Software

MS Office Applications.

Leadership, Team Building,

Motivational Skills, Interpersonal &

Communication Skills.

• Storm Water.

• Electrical Work (Including construction of 12 Substations).

• Street Light Work.

• Sewerage work.

• Irrigation.

Technical Manager/Procurement Manager, Al Naser

International L.L.C

Al Ain 2019 March - 2020 August

Project Name: Abu Dhabi Future School Program Phase 8 Client: Department of Education & Knowledge

Project Management: Abu Dhabi General Services Company (Musanada) Consultant: Altorath International Engineering Consultant. Project Description:

The project is Construction of 2Nos. Kindergartens in Al Ain for Abu Dhabi Future School Program phase8 for 360 student.

The Project consisting of Main KG Building with Ground oor (5,731)m2- Service Block (377)m2- Substation Building (89)m2. Construction Supervisor – ADNOC Representative, HILL INTERNATIONAL INC

ABU DHABI - AL RUWAIS 2015 March - 2019 March

Project Name: Construction of Ruwais Housing complex 664 Villas Client: ADNOC

Project Management: ADNOC

Consultant: Hill International INC.

Main Contractor: Dhabi Contracting LLC

Project Description:

The project is part of the proposed Ruwais Housing Complex Expansion – Phase IV. The Project components of 663 Villas/Residences (G+1)-2 main large mosques- 7 Nos of Small mosques-

Landscape (Hard & Soft)- Play areas including equipment’s- Paths & walkways. Technical Manager, TORNADO GROUP

Al Ain 2014 September - 2015 March

Project Name: Construction of Sheikh Hamdan Bin Zayed Mosque Client: Crown Prince Court

Consultant: Al Ain Consulting Engineering

Project Description:

Sheikh Hamdan bin Zayed is one of Crown Prince Court project Built on 5,497 m2 in al Jimi Lemi – Al Ain components of following:

- Main Mosque Building (2370 Worshiper)

- Ancillary Building.

- Substation

- Landscape (Hard & Soft)

- Parking.

- Imam House.

Technical Engineer, GHANTOOT CONTRACTING CO. L.L.C UMM AL QUWAIN 2012 December - 2014 September

Project Name: Design & Built of Sheikh Khalifa Bin Zayed Centre - Marine Research

Client: Ministry of Public Work

Consultant: CORE Alliance Engineering

Project Description:

The MRC Built to produce ngerlings (Juvenile sh) which will be used for restocking programs in the Gulf and the sustainable development of aquaculture in United Arab Emirates. The project consists of: Administration laboratory complex building of 5.500 m2, including exhibition aquarium.

Conference halls- Laboratories- Accommodation unit- Aquarium Educational unit- Plant Room Building - Sea water Pump Station & Fire Fighting Pump Station- Brood Stock Building- Hatchery Building- Weaning & Nursery Building- Steel structural.

Architectural Design, Structural Design,MEP Design, Sea water Intake System Design, Marine Engineering Design, Oxygen System design and Recalculation System Design.

QA/QC Engineer, GHANTOOT CONTRACTING CO. L.L.C.

ABU DHABI 2012 January - 2012 September

Project Name: AL FALAH COMMUNITY DEVELOPMENT - Village Retail Client: ALDAR PROPERTIES PJSC

Consultant: WS ATKINS & PARTNERS OVERSEAS.

Project Description:

The project is a new sustainable community of UAE nationals, part of the plan Abu Dhabi 2030 directive, provides 5000 homes for middle-income families, consist of (Ghantoot Part):

Village center and retails.

Play areas with Kids play equipment’s.

Café shop-Markets- Banks- Laundries- Landscape (Hard & Soft). Project Engineer, GHANTOOT CONTRACTING CO. L.L.C.

ABU DHABI 2010 June - 2012 January

Project Name: Abu Dhabi Court House

Client: Ministry Of Justice, Govt Of Abu Dhabi ADJD Consultant: Dar AL-Omran.

Project Description:

The project is a new sustainable community of UAE nationals, part of the plan Abu Dhabi 2030 directive, provides 5000 homes for middle-income families, consist of (Ghantoot Part):

Village center and retails.

Play areas with Kids play equipment’s.

Café shop-Markets- Banks- Laundries- Landscape (Hard & Soft). Technical Coordinator, NATURAL STONE TRADING

Dubai 2008 June - 2010 June

Project Name: Dubai Biotechnology & Researching Park - Dubai Headquarter Client: Tecom Investment, Govt Of Dubai

Contractor: Belhasa Engineering & Contracting Co. L.L.C. Project Description:

The project is a complex construction Building located in Mushrif – Abu Dhabi consists of: Court of appeal- cassation- Court of the rst instance- Main building consist of service oor- Basement with 4900 m2 - Water Tanks- Substations- forty Five Lifts, Four Panoramic Lifts and eight escalators. Project Engineer, Orfaji Contracting LLC

Khartoum - Sudan 2006 June - 2008 June

Project Description:

Construction of 6 warehouses in western Sudan (Nyala, Al Jinanam Al Fola) Site Engineer, lahmeyer International

Abu Dhabi 2005 August - 2006 June

Project Description:

The project is maintenance of Sennar dam.

Courses

CITB- Construction Skills Site Safety, Eurolink Safety 2011 - 2011

Project Planning and primavera P6.1 Software, Pioneer International Projects Management Abu Dhabi - UAE

2012 - 2012

Pearl Qualified Professional (PQP), Department of Urban Planning & Municipalities Abu Dhabi - UAE

2017 - 2017

Contract Management based on FIDIC, Chicago Training and Consultancy Abu Dhabi - UAE

2018 - 2018

Diploma in computer science, University of Khartoum- Sudan 2000 - 2000

Sudan

APPROVALS

MUSANADA, ADNOC, DUBAI MUNICIPALITY, ABU DHABI

MUNICIPALITY, BQP

2010 - 2020

JOB RESPONSIBILITIES

· Review the structural Drawings, Material submittals, Method statements.

· Review contractor's quality systems including work methodology and procedures, and monitor implementation across the project site.

· Orient, assign, and supervise the construction inspection staff daily, so that all contractor activities are adequately covered.

· Supervise and remain vigilant regarding all aspects of the construction activities and construction methods, respond with appropriate and necessary levels of construction supervision to provide quality assurance in accordance with contract documents.

· Coordinate the interface of the construction work other contractors on the site, Orient inspectors to verify that contractor is following his approved Method of work.

· Reviewing the approval for Soil report, Mock-up's, performs test to ensure same at site.

· Always review the contractor’s progress, monitor the material incorporated in the work, the materials storied at the site, and contractor's manpower and equipment. - Attend Weekly, Monthly, and other progress meetings.

· Review inspector's daily reports and preparation of engineer's daily diary, and general oversight of inspector's daily activities including works assignments, operations.

· Coordination with contractor's supervisory personnel regarding schedule, sequence, and method of work.