SA
ME
Ph
Em
A
•
•
•
•
•
•
•
Pr
Job
Eli
ATHISHNA
ECHANICAL Q
one: +91 89
mail: sathish
Achievement
Steadfas
Extensiv
ASME B
SAMSS 0
Manual,
Excellen
day man
Able to
smooth
Competent P
Extended te
assured proj
Raised mat
Proficient in
the modern
contractors.
Experienced
Checklist,Qu
Coordinate
asked for inp
Experiences
KNPC,Aram
roject Managem
b Safety Analy
iminate Non-C
ARAYANAN
QA QC INSP
925205153
hnarayanand
t-driven prof
st QA/QC- IN
ve knowledg
B16.5, ASME
011, SAES G 0
, IFC Drawing
nt planner an
nagement.
manage mul
ly
Professional w
echnical sup
ect execution
erial receivin
n monitoring
construction
d in plann
uality procedu
d with the c
puts wherever
s in the field
mco Approva
ment & Execu
ysis
Conformance
N.D
PECTOR / EN
dme@gmail.c
fessional tar
NSPECTOR w
ge of Internat
B31.3, NFPA
006, SAES K 4
s, SAEP 122,
nd problem s
ltiple simulta
Lo
with nearly 8
port to all th
n in complianc
ng, as approv
g and accom
n quality inpu
ning, work
ures,specifica
client on the
r required.
d of Quality
al (status-1) an
ution Site
Site
Proj
NGINEER
com
geting assign
organisat
with 8 yrs & 9
tional & Saud
A- 20,API 661
402, SAEP 35
31 SAMSS 00
solver versed
aneous respo
cation Prefere
PROFILE
8 years & 9 m
he equipmen
ce with qualit
ved immediate
mplishing suc
uts and metho
k execution
ations,QMS,M
project Qual
and Constru
nd India.
CORE COM
e Inspection Ex
Engineering
ject Quality M
nments as M
tion of repute
9 months of e
di ARAMCO s
1,API 614,AP
1, Schedule “
01,SAEP 20,3
d in quality r
onsibilities to
ence: SAUDI A
E SUMMAR
months of ric
nts(Static & R
ty, health, saf
ely after recei
cessful comp
odologies in
and prepa
Method Statem
lity requirem
uction with M
M PETENC
xecution
Managements
ECHANICAL
e.
experience in
standards: A
I 610. SAES G
“Q”, Vendor
2 SAMSS 04.
elated nonco
o keep qualit
ARABIA
R Y
h experience
Rotating & P
fety and envir
iving work re
pletion of con
coordination
aration work
ment.
ments and pro
Multinational
IES
Leak Test,
Coordinatio
Conversant
L QA/QC INS
n the oil & ga
PI RP 686, A
G 005, 31 SAM
Installation a
onformance,
ty based cons
e.
Packages)wo
ronmental stan
quest from th
nstruction pr
n with consul
ks that inc
ovided feedba
projects in t
Function test
on with Client
t with Industri
SPECTOR wit
as industry
ASME B16.47
MSS 004, 31
nd Operation
, closure and
struction run
ork groups at
ndards.
he company.
rojects with a
ltants and thi
clude ITP,In
ack on the st
the Middle E
& Preservatio
ial Standards
th an
7,
nal
d day-to-
nning
site and
adopting
ird party
nspection
atus and
East with
on
Sin
Ara
Gro
QA
(A
Key
Qu
nce Nov’30
abia
owth Path:
A QC MECHA
pproved wi
y Result Are
ality Contro
Implementi
SAUDI ARA
and Enginee
Preparation
representat
Approves in
rejecting un
Issuing RFI
Generate pu
Review com
Issue and cl
for the work
Prepare and
Good know
Well equip
specificatio
Familiar wi
Incoming m
Inspection o
shims cond
Equipment
location of n
Confirm plu
plumbness
Confirm gro
ITP.
Inspection
confirm tra
off, down co
Confirm vis
equipment.
Witness and
Confirm vis
erection. C
preliminary
Distance be
Perform ins
monitoring
Coordinates
Ensuring in
the approve
and inspect
Coordinatio
2019 with
ANICAL INSPE
th status 1)
eas:
ol Inspector
ing Quality a
AMCO Standa
ering Standa
n of Reques
tive for the sm
ncoming ma
nacceptable m
for various i
unch listing f
mpleted punc
lose-out of ge
k deviation a
d compile ins
ledge in P&I
pped with s
ns and stand
th line check
material inspe
of foundation
ition, Anchor
verification/
nozzle, visua
umbness or
in vertical eq
outing, grout
of internal a
ay assembly,
omer height
sual, tray cap
d Visual Insp
sual, shell d
Confirm erec
y alignment
etween shaft
spection act
work to ens
s inspection
nspection, me
ed procedur
tion of projec
on with clie
Nasser S. A
ECTOR : Nov
)
: Mechanica
and Safety sta
rds, Project S
ards and rela
t for Inspec
mooth execu
aterials by c
materials.
inspection st
for the work
ch list close-o
enerated No
against speci
spection reco
D diagrams a
standards an
dards.
king, punch-o
ection and m
ns before the
r bolt Centre
/visual inspe
al (Damage o
elevation. E
quipment.
ting condition
accessories o
location and
etc.
p missing, cl
pection of lea
damage cond
ction, orient
of equipme
end and soft
tivities in ac
ure specified
activities w
easuring and
re (Inspectio
ct materials a
nt for all in
WORK E
AL Hajri Co
v’30 2019 – Ja
al (Static & R
andards for p
Specification
ted Internati
ction (RFI) i
ution and imp
confirming sp
tages accordi
deviation ag
out prior to s
n-Conforman
fied drawing
ords.
and experien
nd procedu
out and hydr
material certif
e erection of
e, Distance (B
ection (each
f shell and no
Elevation of
n, grouting c
of equipment
d orientation
lamp bolt tig
ak testing for
dition, acces
tation, eleva
ent after poc
t foot.
cordance wi
d requiremen
with company
d test equipm
n, Measuring
and equipme
nspection ac
E XPERIEN
orporation
an’31 2022
Rotating)
productive f
n, Quality Pla
ional Codes
including da
plementation
pecifications
ing to ITP.
gainst specifi
submission to
nce, Surveilla
g requiremen
nce in conduc
res, interna
ro test witnes
ficate review
equipment c
BCD), and Bo
h item).Confi
ozzles).
Boot section
compressive
t in columns
n, tray level c
ghtening .con
r Trays.
sory conditi
ation, center
cket grout. C
ith the requ
nts for the pr
y and clarify
ment’s were c
g, and Testin
ent’s to ensur
ctivities acco
CE
(Industrial
form of work
an, Inspection
ay to day di
n of inspectio
s, conducting
ied drawing r
o client.
ance, and Qu
nts of Installa
cting walkthr
ational stand
ss.
w.
chipping con
lts projection
rm shell and
n checks (H
test strength
s and drum .
check using
nduct intern
ion. Inspect
ring and an
Confirm 1st
uirements of
roject are bei
ying any tech
calibrated an
ng Equipmen
re the quality
ording to in
Contractors
ks and execut
n Test Plan, I
irect coordin
on activities.
g visual and
requirement
uality Contro
ation.
rough.
dards with
dition, leveli
n.
d nozzle flan
orizontal eq
h as per proje
.confirm mat
laser machin
nal and final
the rotating
nchor bolt t
alignment.
the relevan
ing followed
hnical issues
nd controlled
nt Control) m
y of the proje
spection req
s Al Jubail)
tion complyi
Inspection Ch
nation with
d measureme
ts and specifi
l Inspection
respect to
ing, elevation
nge, orientat
quipment’s) C
ect specificat
terial and tr
ne, Weir plat
inspection o
g equipment
tightening. C
Coupling co
nt ITP. Conti
.
s during ins
d in accordan
monitor the
ect.
quest and u
), Saudi
ing with
hecklist,
clients’
ent test,
ication.
Reports
project
n of pad,
tion and
Confirm
tion and
ay type,
te, draw
of static
t before
Confirm
ondition,
nuously
pection.
nce with
storage
updating
Review issued for construction drawings, plans, work details and construction specifications to ensure that all works implemented at site conforms to Project Quality and Safety Requirements
Check calibration logs and ensure calibrated equipment is displaying current certificate. Monitor the effective implementation of Procedures in accordance with Quality Assurance Manuals, Quality Control Inspection Plans, Project Specifications and Standard Codes.
Check fabrication, welding and assembly of all equipment at fabrication shop and preparing inspection report.
Carry out visual and dimensional checks of piping spools, Equipment, skid and structures as per approved drawings.
Responsibility to conduct inspection, witnessing and monitoring work activities in accordance with the approved inspection test plan and procedures.
Inspection of Structural Fabrication, pressure vessel, activities using SMAW, FCAW, SAW, GTAW & GMAW process.
Ensure post weld heat treatment is carried out as per procedure.
Conduct PMI as per the project specification. If there is any Quality related problems, immediately inform to QC Engineer/ QC Manager.
Hardness of testing materials.
Responsible to make quality control awareness to the peoples in his assigned area.
Conducting the training to the bolt torque /tightening to the pipefitters.
Ensure appropriate tools, equipment’s and materials at site.
Review of Test Package and certification.
Familiar with line checking, punch-out and hydro test witness
Test package clearance.
Ensure the test limits as per Test Block diagram.
Witnessing the reinstatement activities. Coordination, task instruction and performing the work at site.
Witness inspection and testing, ensuring that the testing, inspection methods, and acceptance criteria are in accordance with specified requirements and/or agreed procedures. Review all inspection records for adequacy and verification of results, prepare and submit (NCR) Non-conformance report to the Field QA/QC Manger and assist in developing and implementing necessary corrective actions.
Implementing preventive action according to lesson learned.
Attend the client meeting and internal meeting.
Coordination with the Senior Engineer and other concerned to establish material procurement schedule
Implement project policies and procedures with respect to quality, labor relations, Personnel practices, safety method and procedures through the supervisory staff and employees. EDUCATION
Diploma in Mechanical Engineering (DME).
PROJECTS
Contractor : TECNICAS REUNIDAS SAUDIA FOR SERVICES & CONTRACTING CO LTD (TR) Subcon : NASSER S AL-HAJRI CORPORATION
Position : QA QC MECHANICAL INSPECTOR
Project Title : HARADH HAWIYAH GAS COMPRESSION PROJECT (ARAMCO) Location : SAUDI ARABIA
Period : NOV ‘30 2019 TO JAN’31 2022
Contractor : L.G. BALAKRISHNAN & BROS LTD
Company : L.G. BALAKRISHNAN & BROS LTD
Position : QC MECHANICAL INSPECTOR
Location : TAMIL NADU,INDIA
Period : AUG ‘13 2018 TO OCT’25 2019
Contractor : KUWAIT NATIONAL PETROLEUM COMPANY (KNPC) Subcon : NASSER S AL-HAJRI CORPORATION
Position : QA QC MECHANICAL INSPECTOR
Project Title : MINA AL AHMADI(MAA) REFINERIES-CLEAN FUELS PROJECT (CFP) Location : KUWAIT
Period : JUN ‘01 2016 TO JUL’20 2018
Contractor : HINDUSTAN PETROLEUM CORP LTD
Company : H’RECK ENGINEERS PVT LTD
Position : MECHANICAL QC INSPECTOR
Project Title : PRU (Propylene Recovery Unit)
Location : MUMBAI, INDIA
Period : 03-JAN-2015 to 16-APR- 2016
Contractor : RELIANCE INDUSTRIES LTD
Company : POWERTECH (MECH) PVT
Position : MECHANICAL QC INSPECTOR
Project Title : JERP (Jamnagar Export Refinery Project) Location : GUJARAT, INDIA
Period : 09-MAY-2013 to 24-DEC-14
IT EXPOSURE
Windows XP
Windows Vista
Windows 10
Computer Software
AutoCAD 2013
MS Office
PERSONAL DETAILS
Date of Birth: FEB’10 1991
Languages Known: ENGLISH,TAMIL, TELUGU,MALAYALAM & HINDI. Permanent Address: S/O N.DHATCHNAMOORTHI,
1-59-4, SOUTH ST,
PALAYAMPATTI (PO),
ARUPPUKOTTAI TK,
VIRUDHUNAGAR,
PIN: 626112,
TAMILNADU,INDIA.
Passport No: N3757709
Passport Expiry: OCT’07 2025
Marital Status: Single
Declaration:
I hereby declare that all the above written particulars are true to the best of my knowledge and belief. Awaiting your favorable reply and oblige thanking you in anticipation. Date : SATHISHNARAYANAN.D