Post Job Free

Resume

Sign in

Land Surveyor

Location:
Doha, Qatar
Salary:
As per your company standard
Posted:
December 10, 2023

Contact this candidate

Resume:

Page * of *

CURRICULUM VITAE

Name :Syed Kabeer Salim

Designation :Sr Land Surveyor .

Experience :12+ Years

Mobile No :+974-********

Email :adqi6j@r.postjobfree.com

Visa Status : Valid QID with NOC.

Driving License:Under Process

Career objective:

Professional Sr. Land Surveyor with more than 12+ yearsof experience & seeking a challenging position as a Land Surveyor in a dynamic environment with a desire to progress further in the same field and likes to grow with the organization and prove to be an asset for its effective functioning and be a team player for the achievement of organizational goals and its success.

Key Responsibilities:

Conducting Surveys:Performing field surveys using various instruments like total stations, GPS, and laser levels to measure and collect data on land, buildings, and other features.

Boundary Analysis: Researching and analyzing legal documents, deeds, and previous surveys to establish property boundaries accurately.

Topographic Mapping:Creating detailed topographic maps showing elevation, contours, and physical features to assist in construction and engineering projects.

Construction Layout: Setting out reference points and markers to guide construction processes, ensuring buildings and infrastructure are built according to approved plans.

GPS Technology:Utilizing Global Positioning System (GPS) equipment for precise location-based data collection and mapping.

Data Processing:Processing and analyzing survey data using software such as AutoCAD, GIS, and survey-specific software to generate maps, plans, and reports.

Legal Compliance:Ensuring surveys comply with local, state, and national regulations, codes, and standards.

Environmental Impact Assessment:Conducting surveys to assess the impact of construction projects on the environment and natural resources.

Project Management:Managing survey projects from planning to completion, including client communication, budgeting, and timeline management.

Geodetic Surveys:Conducting geodetic surveys to establish precise measurements of the Earth's surface, essential for large-scale mapping and satellite positioning systems.

Site Inspection:Visiting sites to assess conditions, verify data, and address any challenges that might affect the accuracy of the survey.

Documentation:Creating detailed and accurate survey reports, drawings, and documentation for clients, regulatory authorities, and project stakeholders.

Research: Staying updated with the latest surveying techniques, equipment, and regulations through continuous research and professional development.

Risk Assessment:Identifying potential risks and challenges related to survey projects and developing mitigation strategies.

Team Collaboration:Collaborating with architects, engineers, and other professionals to integrate survey data into overall project plans.

Click to buy NOW!

P

D

F

-

X

C

h

a

n

g

e

h

t

t

p

:

/

/

w

w

w

.

g

u

t

h

c

a

d

.

c

o

m

Click to buy NOW!

P

D

F

-

X

C

h

a

n

g

e

h

t

t

p

:

/

/

w

w

w

.

g

u

t

h

c

a

d

.

c

o

m

Page 2 of 5

Communication:Effectively communicating survey findings and technical information to clients and non- technical stakeholders.

Equipment Maintenance:Regularly calibrating and maintaining surveying instruments and equipment to ensure accuracy and reliability.

Quality Assurance:Implementing quality control procedures to verify the accuracy of survey data and deliver high-quality results to clients.

Public Safety:Ensuring safety protocols are followed during field surveys, protecting both surveying teams and the public in the vicinity of survey sites.

Client Relations:Building and maintaining positive relationships with clients by understanding their requirements, addressing concerns, and delivering exceptional surveying services. Professional Experience: 12+ Years

Client : Shell Tower Lusail

Project : Velero Hetol Doha, Fit out Work (Steel Structure, Facade, Glass Panel, and Aluminum Panel’s, Alignment and Levels)

providing the control points traversing and Shifting the Levela Period : MARCH- 2023 to TILL DATE

Client : Reliable Surveyors, Telangana, India

Project : Boundary line marking Column Setting out and Gate Levels providing Detail Topographical survey

Period : OCT- 2018 to JAN - 2023

Client : Brookfield MULTIPLEX Abu Dhabi

Project : Al Maraya Center

External Faced checking as main contractor, Steel Structure, Facade, Glass Panel, and Aluminum Panel’s, Alignment and Levels

providing the control points traversing and Shifting the Levela Period : March 2016 to August 2018

Client : Al Nabooda

Project : Abu Dhabi Airport – all utility, manholes layout cover levels, ducting – (Sewer, Storm water, irrigation, pipe Lining 315Ø To 3000 Ø survey Work)-Pipe Lining

& excavation all Services (LV, MV, HV,ELV, Tel & AFL) Period : July - 2013 to July - 2015

Client : AL Barha Towers – Abu Dhabi

Click to buy NOW!

P

D

F

-

X

C

h

a

n

g

e

h

t

t

p

:

/

/

w

w

w

.

g

u

t

h

c

a

d

.

c

o

m

Click to buy NOW!

P

D

F

-

X

C

h

a

n

g

e

h

t

t

p

:

/

/

w

w

w

.

g

u

t

h

c

a

d

.

c

o

m

Page 3 of 5

Project : Bank and Council Tower –Structure, Facade, Glass Panel, and Aluminum Panel’s, Alignment and Leves

Period : Sep - 2011 to July - 2013 (Under Shen Young Younda L.L.C) Client : Hamdan Bin Mohammed Bin Rashid Sports Complex – Dubai Project : Sports Complex – Roof, Wall Cladding and Aluminum Panel Period : March - 2010 to May - 2011 (UNDER DUBAI MUNICIPALITY). Client : A Al Nabooda – Jabelali Airport

Project : Jabel ali Airport all utility, manholes layout cover levels, ducting – (Sewer, Storm water, irrigation, pipe Lining 315Ø To 3000 Ø survey Work)-Pipe Lining

& excavation all Services (LV, MV, HV,ELV, Tel & AFL) Period : July - 2008 to March - 2010

Client : Hotel Atlantis – Palm Jumeirah – Crescent Road – Dubai. Project : Sea Water to connecting Pump Station Pipelining Survey Period : Oct – 2006 to June – 2008

Roles & Responsibilities:

Coordinating with the chief surveyor and engineer to check all the alignments.

Coordinating with the chief surveyor and engineer for construction and execution to expedite the job.

Studying the drawings prior to carrying out the works.

Carrying out complete Land survey works for the project.

Coordinating with existing underground infrastructure and service in the zones for the purpose of trial excavation.

Checking and ensuring the excavation areas before providing the level and setting out.

Performing construction surveys to establish lines and grades within the construction site.

Performing property boundary surveys and providing topographic surveys for the construction site areas.

Providing the survey for underground pipelines and other facilities.

Arranging the routine spot checks of the works and records.

Providing the calculations and records in support of all survey activities.

Maintaining necessary records/files (setting out books are properly - maintained and filed when completed).

Click to buy NOW!

P

D

F

-

X

C

h

a

n

g

e

h

t

t

p

:

/

/

w

w

w

.

g

u

t

h

c

a

d

.

c

o

m

Click to buy NOW!

P

D

F

-

X

C

h

a

n

g

e

h

t

t

p

:

/

/

w

w

w

.

g

u

t

h

c

a

d

.

c

o

m

Page 4 of 5

Downloading the data from the instruments and providing it in AutoCAD format for submittals.

Coordinating with the engineer to approve the ITR from consultants.

Complete relevant inspections & checks as required for the approval of ITR.

Identification and tracking of survey instruments and their calibration status.

Maintaining all instruments on the contract, and ensuring a logbook is kept to record on.

Establishment of Traverse and Control Point.

Points setting out and Level Shifting.

Establishing the horizontal and vertical alignment for Roads, Telephone, Drainage, Pipeline and Street Lighting.

Detailed Topographical Survey.

Level Topographical Survey (Desert).

Gate Level Survey.

Alignment of Steel Structures.

Coordinating with the Services Authorities.

Computer and Technical skills:

AUTOCAD.

MS-Office (Excel, Word, PowerPoint, and Outlook).

SAP-For all Company works

Academic Qualifications:

մ Diploma in Land Surveying from Indo – British Academy – India. մ Knowledge of Total Station and Automatic Level

մ Trimble, SOKKIA, & Leica oriented

մ Knowledge of Trimble GPS and Robotic Total Station. մ SSC From the Board of Secondary

Personal details:

Name : Syed Kabeer Salim

Marital status : Married

Religion/ Nationality : Islam/Indian

Languages known : English, Arabic,Hindi,Telugu & Urdu. Passport number : N6008517

Expiry Date : 22/12/2025

UAE Driver License No :2341341

Expiring Date : 16/05/2027

(Syed Kabeer Salim)

Click to buy NOW!

P

D

F

-

X

C

h

a

n

g

e

h

t

t

p

:

/

/

w

w

w

.

g

u

t

h

c

a

d

.

c

o

m

Click to buy NOW!

P

D

F

-

X

C

h

a

n

g

e

h

t

t

p

:

/

/

w

w

w

.

g

u

t

h

c

a

d

.

c

o

m



Contact this candidate