Post Job Free

Resume

Sign in

Power Project Plant

Location:
Indore, Madhya Pradesh, India
Posted:
March 16, 2022

Contact this candidate

Resume:

SUSHANT SHEGAONKAR Email:adqh5z@r.postjobfree.com;adqh5z@r.postjobfree.com

Mobile: +91-947*******; +91-798******* Passport Number: J9785567, Skype ID: svs.sushant07

Objective:

To manage and supervise execution of the assigned domain for a project in line with overall project plan and requirement of user as per organizational guidelines and internal / statutory requirements to ensure completion of assigned domain/ package as per performance parameters of time, cost and quality.

Mechanical Engineer over 18 years experience in Erection & execution of Thermal Power Project in field of FGD, ESP, Boiler package, Piping, TG Auxiliary and Ducting

Milestone Achieved:

Successful completion of erection and COD of 2x660 MW, Boiler for NTPC Solapur in record time. (After hydro hydrotest to COD only 211 days )

Successful completion of Erection and COD of 2x600 MW, Boiler for Moserbare Thermal Power Project, Anuppur, Madhya Pradesh.

Successful Completion of erection and record hydro test of2x300 MW in 5month 16 days after celling girder erection, Boiler for Rosa Thermal Power Project (RTPP) at Rosa, Shahjahanpur, (U.P.).

Successful Completion of Erection and COD of ESP and Duct 2x300 MW for Dinbandhu Dinanath Thermal Power Project, Yamunanagar, Haryana.

Professional Experience:

Mecwel Construction Pvt. Ltd (Sept 17,2021 – till date)

Working as a Site Manager (Site Incharge) for 3x660 MW, WFGD Project NTPC Sipat, Bilaspur Chattisgarh.

Job Responsibility:

Reporting to MD for Erection and execution of 3x660 MW, WFGD Project NTPC Sipat, Bilaspur Chattisgarh.

Monitoring of subcontractor activities in terms of safety, quality and timely completion of works.

Forecasting the future problems in construction, identifying the problems while construction is going on & accordingly problems will be solved through proper channel.

Liaising with clients and government bodies.

Providing technical data to prepared weekly and monthly reports on project Progress.

Identifying and reports on discrepancies in original design or in contract documents that necessitate contract modifications obtain engineering review & approval.

Purchasing and Hiring of T&P as per site requirement.

Attend Site Meetings with clients and contractor.

BGR Energy System (Nov 16, 2017 – Sept 10,2021)

Worked as a Manager Site Mechanical for 2x660 MW, NTPC Hotgi,TPP.in Field of Boiler Pressure part.

Projects:

2X600 MW NTPC Hotgi, Solapur, TPP, Maharashtra.

Boiler Supplier: M/s. Hitachi Europe Limited.

Contractor M/s PMPL

Job Responsibility:

Reporting to AVP Mechanical for erection and alignment of Boiler package Unit #2.

Erection, Alignment & Welding of Boiler Pressure parts, Piping, Structure and Duct & Insulation.

Maintain the erection schedule. Track the erection work as per the schedule suggest course connection to bring back the schedule on track.

Manpower and resource planning to meet the erection schedule.

Coordinate with customer as well H.O. regarding the work progress.

Review weekly & monthly reports of package assigned, escalate issues and drive corrective actions.

Responsibilities of erection engineers to describe at site.

Ensure implementation of construction QA/ QC processes and safe working culture.

Attend Site Meetings with clients and contractor.

Forecast the amount of work to executed and hence plan the cash flows at site.

LANCO INFRATECH LTD (Feb 16,2010 – Oct 29,2017)

Assistant Manager Mechanical

Joined as Sr. Engineer in Lanco Infratech Ltd. and Promoted to Assistant Manager.

Projects:

2X600 MW Moser Baer MP power project, Anuppur. EPC Contractor Lanco InfraTech Limited.

Boiler Supplier: M/s. Harbin Turbine Company Limited.

Turbine Supplier: M/s. Harbin Turbine Company Limited.

2X660MW Amarkantak Stage - II Super Critical Thermal Power Project, Korba,Chattisgarh

ESP Suppler: M/s.Fieda (Zhejiang Feida Environmental Science & Technology Co., Ltd).

Boiler Supplier: M/s. Dongfang Electric Corporation Limited.

Turbine Supplier: M/s. Harbin Turbine Company Limited.

Generator Supplier: M/s. Harbin Electric Machinery Company Limited.

JobResponsibility:

Erection, Alignment & billing of Boiler Pressure parts, structure

Erection, Alignment & billing of ESP and Duct at Amarkantak site.

Planning, Billing and Making Protocols in Amarkantak site.

Erection and Alignments of Boiler Pressure Part, Coal Piping and Ducting at Anuppur Site.

Erection, Alignments & Welding of LP Piping at Anuppur Site.

Erection and Alignment of TG Auxiliary Equipment at Amarkantak Site.

Responsible for day to day site work of domain engineering as per scheduled plan.

Ensure safety and quality at site.

Petron Engineering Construction Limited. (May 29, 2008 to Feb 14, 2010).

Leading Construction Company in Power plant and Oil gas

Worked as a Fabrication and Erection Engineer

Projects:

2X300 MW Rosa Thermal Power Project (RTPP) at Rosa, Shahjahanpur,(U.P.)-242001 from29May2008 to 19 Sept 2009.

Boiler Supplier: M/s. Harbin Turbine Company Limited.

3X 660 MW Adani Maharashtra Ltd, Tiroda,Dist-Gondia,Maharashtra from 20Sept 2009 to 14 Feb 2010.

Boiler Supplier: M/s. Dongfang Electric Corporation Limited.

Job Responsibility:

Erection, Alignment & Welding of Boiler Pressure Parts at Rosa Site.

Erection, Alignment & Welding of Air Gas Ducting at Rosa Site.

Ensure implementation of construction QA/ QC processes, making protocols at Rosa Site.

Co-ordinate Site contractor for correct Installation and timely Complete the Task at Rosa Site.

Ensure the Safety and quality.

Mobilization of Site and contractor at Tiroda Site.

Erection and Alignment of Boiler Structure at Tiroda Site.

Attend daily site Meeting with clients and contractors.

Sunil HiTech Engineers Ltd. (OCT 20, 2006- APR 20, 2008).

2X300 MW DeenbandhuDinanathChhoturam Thermal Power Project (Reliance Infrastructure) at Yamuna Nagar, Haryana

ESP Supplier: M/s. Shanghai Electricals Ltd (China)

Worked as a Project Engineer

Job Responsibility:

Planning, Erection, Alignment & Welding of ESP (Electrostatic Precipitator).

Planning, Erection, Alignment & Welding of Flue Gas Ducting.

Site Billing and contractor billing.

Making Protocols and records of document.

Co-ordinate labor / manpower resources to meet program critical dates.

Ensure the adherence to safety and Quality Standards.

Ensure implementation of construction QA/ QC processes.

Grind well Nortan Ltd. MIDC, Butibori, Dist-Nagpur, Maharashtra (Oct20, 2004 - Sept19, 2005).

Leading Manufacturer & Exporter of Abrasives & Silicon Carbide

Worked as a Production Engineer

Job Responsibility:

Manpower planning for the Schedule task.

Power Press Planning and Programming.

Maintenance of Power Press.

Maintain Dispatched list of Product.

RasayantrikUdyog,Industrial Area,Chandrapur,Maharashtra (June 01, 2003 to May30, 2004)

Fabrication and Manufacturing of Tank and Pipes for power plant and cement plants

Worked as a Production Engineer

Job Responsibility:

Manpower Planning for Fabrication & Welding task of Tank, Shielding, Pipe and Sleeves.

Monitoring of Incoming and Outgoing Material.

Generating & maintain reports for new task.

Costing of Product for Fabrication.

Give instruction to Worker for Fabrication and Bottleneck Of drawing.

Trainings

Power Plant Familiarization, NTPC PMI-NOIDA

Safety at Construction site, NSC e-learning Kolkata

Educational Qualification:

B-Tech Mechanical from Institute of Mechanical Engineering, Mumbai in 2013(Correspondence)

Diploma in Mechanical Engineering from Govt. Polytechnic College, Bramhapuri, Chandrapur in 2003.

HSC from LokamayaTilakJr.College,Bramhapuri, Dist: Chandrapur in 1998.

SSC from LokmanyaTilakVidyalaya, Bramhapuari,Dist : Chandrapur in 1996.

Personal Information:

Father's Name : Shri VasantShegaonkar

Date of Birth : July 12, 1980

Languages Known : English, Hindi, and Marathi

Marital Status : Married

Permanent Address : Anchaleshwar Ward,

Near Shiwaj Square, Chandrapur-442402

Maharashtra

Declaration:

I, hereby solemnly declare that all the statements made in the above are true and correct to the best of my knowledge and belief.

Sushant Shegaonkar

Place: Sipat, Bilaspur



Contact this candidate