Post Job Free

Resume

Sign in

Chief Surveyor/Snr. Surveyor

Location:
Abu Dhabi, United Arab Emirates
Posted:
January 11, 2022

Contact this candidate

Resume:

Page * of *

CV MUHAMMAD IRFAN

Muhammad Irfan

Position applied For: Chief Land Surveyor

A Highly Successful and confident Land Surveyor with over 17 years’ experience, included 14 years Gulf experience in managing all Land survey activities and survey staff My expertise is covering 7No.EPC Oil and Gas project with ADNOC, 3No.Infrastructure project, 2No.Road projects and 2No. 37 floor building tower projects.

CONTACT WORK EXPERIENCE

+971-**-*******

+92-333-*******

adpv0l@r.postjobfree.com

Chack # 138/10-R Th. jahanian.

District Khanewal (Pak.)

BRIEF DESCRIPTION OF PROJECTS

EPC Pipeline Projects with ADNOC IN (07 No.) U.A.E I have completed 7 EPC (Engineering procurement and construction) project in oil and Gas field (ASAB, Sahil, Habshan(Bab) Bu-Hasa and Rumaitha oil and Gas Field) in UAE

Infrastructure projects (03 No.) U.A.E

I have completed 2 Infrastructure Project with GASCO Gas Plant and DAM project in UAE and Pak

Hi-Rise Building Project (02 No.) U.A.E

I have completed 02 Thirty-seven Floors Tower Project in Dubai UAE

Topographic survey,

Topographic survey, prepare topographic survey report, Underground deduction survey, Cross Sectional survey, Leveling and Traversing, Land equation survey for existing property for payment to land owner,

Conversation of datum according to different countries Regions, Preparing GIS Data base drawings, Completed various topographic project in UAE, OMAN, Ethiopia, Somalia, Iraq, Kenya

ROAD Construction Project (02 No.) OMAN

I have completed 02 Road Projects in Muscat OMAN

Road Designing

Excellent experience to prepare Road alignment sheet cross sections and design profiles

Quantity survey

Fully expert in quantity calculation of Earth work Cut and Fill quantities in civil 3d, and all other quantity related calculations

Pipe line Bending survey

Fully expert to calculate pipe line horizontal and vertical bend according to pipe line alignment sheet

USES OF SURVEY INSTRUMENT

All types of Survey Instrument like LEICA Total station, SOKIA Total station, NIKON Total station, NIKON NIVO, TOPCON Total station, TOPCON G.P.S, TRIMBLE G.P.S, LEICA G.P.S, and Rotation laser level EDUCATION

Three-year diploma in Civil

Engineering

INDUSTRY EXPERTISE

Oil & Gas (Pipe line and infrastructure

Projects) (UAE) (06 years)

Road Construction (OMAN) (06 years)

Hi Rise Building (UAE ) (03 years)

Dams and Infrastructure (03 Years)

TECHNICAL SKILLS

Expert in AutoCAD CIVIL 3D

AutoCAD

Microsoft office (Word, Excel,

Global Mapper

All types of survey instrument Total

Station, Auto Level and GPS

Creating Topographic data from

Google earth

Approved from ADNOC

PERSONAL DETAIL

Driving license: U.A.E Abu Dhabi

and (OMAN Muscat)

Current Location: Abu Dhabi, UAE

Visa Status: UAE Employment visa

Current position: Chief Surveyor

LANGUAGES

English – Fluent

Arabic– Fluent

Urdu, Hindi– Fluent

Page 2 of 4

CV MUHAMMAD IRFAN

CAREER SUMMARY

1: AL ASAB EST GEN.TRANSPORT & CONTRACTING ESTABLISHMENT (UAE) APR-2016 to Present (6 years) POSITION : Chief Surveyor (OIL AND GAS FIELD) Current Working PROJECT 01: IGD-E (PHASE 1) PAKAGE 3 Onshore pipeline & Habshan5 Plant Modification Pipe line and infrastructure project (Completed) Work Scope Construction for extension of Habshan5 Gas plant) CLIENT : GASCO (Abu Dhabi Gas Industries Ltd) U.A.E

PROJECT 02: EPC for TIE-IN Works at South East- -PACKAGE-A in Asab and sahil Field, oil pipe line and oil well up gradation project (Completed) CLIENT : ADNOC (Abu Dhabi Company for Onshore Petroleum Operations Ltd) Work Scope (Construction of 120Km pipeline,53 oil wells facilities and 5 manifold in RDS)

PROJECT 03: EPC for TIE-IN Works at South East- -PACKAGE-C in Asab and sahil Field, oil pipe line and oil well up gradation project (Ongoing) Work Scope (Construction of 140Km pipeline,66 oil wells facilities and 7 manifold in RDS) CLIENT : ADNOC (Abu Dhabi Company for Onshore Petroleum Operations Ltd)

PROJECT 04: EPC for Replacement of OGD-0 &2 ageing Network in Bab field Habshan, Gas pipe line and Gas Well up gradation project Completed) Work Scope (Replacement of 110KM pipeline and 19Gas wells facilities) CLIENT : ADNOC (Abu Dhabi Company for Onshore Petroleum Operations Ltd)

PROJECT 05: EPC for Asab Phase-2, Stage-1 Project

In ASAB Field, RDS Extension work (Ongoing) Work Scope (Construction of 21 No. Manifold in 6 RDS and 6no of ITR Building etc) CLIENT : ADNOC (Abu Dhabi Company for Onshore Petroleum Operations Ltd)

PROJECT 06: EPC for Rumaitha Thamama Zone B Phase-3 Expansion Development and Conversion of Phase-I/II Co2 Affected wells (Ongoing) Work Scope (Contraction of 20 no’s cluster pad and 30KM pipeline) CLIENT : ADNOC (Abu Dhabi Company for Onshore Petroleum Operations Ltd)

PROJECT 07: EPC for Call-out Contract for Bu-Hasa wellhead remote monitoring and control Implementation and construction of oil network over pressure protection-long term In BUHASA FIELD (Ongoing) Work Scope (206 oil wells upgradation and Modification work in three RDS and CDS) CLIENT : ADNOC (Abu Dhabi Company for Onshore Petroleum Operations Ltd)

PROJECT 08: EPC for Call-Out Contract for ASR Gas Facilities in BAB and Asab HABSHAN BAB AND ASAB FIELD (Ongoing) Work Scope (210 km pipe Line and new and 39 new Gas wells) CLIENT : ADNOC (Abu Dhabi Company for Onshore Petroleum Operations Ltd) Page 3 of 4

CV MUHAMMAD IRFAN

2: ALISCO STRONG PLANT TRAD&CONT.L.L.C (OMAN MUSCAT) (06 years) JUNE-2010 to MAR 2016

POSITION : Chief Surveyor (Road works including bridges) PROJECT 01: Design and Construction of Asphalt Road from Biayaiq to Al Abriyyin-

(KHABOORA) 27-kilo meter in high mountain area

CLIENT : D.G.R (Directorate General of Roads) OMAN

PROJECT 02: Design and construction of hamra’a al’ duru’a aswed garbia, aswed shamalia Asphalt Road in Ibri,45-kilo meter Road CLIENT : D.G.R (Directorate General of Roads) OMAN 3: SEASIF GROUP DUBAI L.L.C. /CITY SURVEY COMPANY (DUBAI, U.A.E) (03 years) OCT-2007 to MAY 2010

POSITION : Sr. Land Surveyor (Building work)

PROJECT : Donna tower-1 & Donna tower-2 thirty four floors twin tower project (Dubai) CLIENT : SESIF GROUP

4: DESCON Engineering Ltd. (MULTAN AND TURBAT.PAKISTAN) (03 years) JULY-2004 to OCT 2007

POSITION : Land Surveyor (Infrastructure project, DAM project) PROJECT 01: Taunsa Barrage Emergency Rehabilitation and Modernization project PROJECT 02: Mirani Dam Project Turbat

PROFESSIONAL HIGHLIGHTS

Supervision of survey crews

Giving daily work schedule to survey teams and monitoring to all survey staff Performance and keep eyes on surveyor’s work accuracy to insure everybody is using Correct drawings, bench marks and proper uses of total station and G.P.S and other Survey instrument like underground utilities scanner auto level etc.

Fully responsible of all survey work done by survey teams under my direction.

Ensure that all survey staff should follow safety parameter.

Ensure that all survey equipment is calibrated & status of calibration is identified as per QA/QC procedure/specification

Excellent leadership, motivational and presentation skills All Kinds of Survey

Topographic survey, Cross Sectional survey, Traversing and Leveling survey, City Mapping, Boundary Survey, Control Survey, Quantity Survey, As-Built Survey, Land contours, Project Layout and setting out, Land equation (property) survey Static Survey & Real time kinematic Survey works, GIS (Geographic Information System) survey.

Topographic Drawing, Town Planning & City Mapping, Utilities with Total Station & GPS.

Prepare all data, charts, plots, maps, records, and documents Related to survey.

Perform joint measurements of the completed work for payment

Project Layout, setting out and underground deduction survey to prepare scan reports for existing underground utilities and prepare survey reports for daily schedule RFI, prepare as built and Handing over survey reports,

Ability to utilize modern computer software and survey equipment.

Quantity survey, quantity calculation for earth work

Prepare all survey reports of the project as per I.T.P and getting approval from consultant

Preparing Method statement and T.R.A for topographic survey and other survey related activity Page 4 of 4

CV MUHAMMAD IRFAN

Construction of High Rise Towers & Building Work” 03 Years” work experience.

Completed 2 project of Building 37 floors tower in Dubai

Full responsible for all survey activity of survey work for the project

Precise vertical and horizontal control of building towers.

Prepare coordinates and elevation data for building setting out i.e. pilling, slabs, column Opening, doors, staircase etc.

Monitoring columns verticality and locations.

Marking of column beams openings and control slab elevation.

Prepare as built reports, and other survey reports

Full expert of all survey activity of high rise building towers. Construction of Roads” 05 Years” work experience

Completed 2 project of road one 45km and other 27 km hilly area Road project in OMAN from start to hand over.

Complete knowledge for designing of Roads, modification in Road alignment and profiles

Calculate cut fill quantities for Road work, Create cross section in civil 3d

Topographic work for road design and collect all information of any Public property coming in side road corridor if any property coming in side Road try to avoid it otherwise prepare croockies for payment

Selection of alignment to avoid road difficult cut and fill in Hill area project.

Creating cross section in AutoCAD civil 3d for cut fill quantities.

Prepare Grid sheet and setting out data for Road work.

Recording O.G.L jointly with consultant and preparing sheet for approval

Giving sensor level for asphalt work and Control earth-filling slopes as per cross section

Calculation of Setting out and elevation data for Retaining walls, box culverts irush Bridges, causeway, cutting benches of road, control cutting slopes, etc.

Full expert of all survey activity of Road work

Construction of infrastructure project Gas Plant with GASCO (ADNOC)

Complete infrastructure project of Gas plant construction in Habshan (Abu Dhabi)

Fully responsible to crate survey data from PDF drawing provided by client, calculate all coordinates and elevation for civil and mechanical structure and prepare survey related AutoCAD drawing from PDF drawing

Fully responsible to Control Anchor Bolt Position accuracy.

Ensue that new construction should properly match with existing structure.

Fully responsible for Erection of Steel Structure works of Gas plant

Fully responsible for Vertical and horizontal control of all mechanical structure.

Fully responsible for Construction of Fire water and Drainage network for Gas plant

Construction of plant Roads and concrete pavement

Taking approval from client for all Survey work done with RFI

Fully responsible to insure that all surveyors work according to safety rules regulation Construction of oil and Gas pipe lines and wells facilities with (ADNOC)

Selection of Rout for new pipe lines

Preparing Route survey sketches and taking approval from concern authorities

Preparing GIS data base drawing to take approval from GIS ADNOC and Bab Master Plan

Topographic for new pipe line alignment, isolation valve compound (IVC) and well Head area

Prepare survey setting out and elevation data for Pipe Line R.O.W, Excavation, Profiles, Bending of pipe lines and TIE IN points as per alignment sheet

Selection of location and construction new isolation valve compound (IVC).

Scanning of underground utilities and prepare scanning reports.

Full responsible for all survey Party works to insure that everybody is using updated drawings and correct control points, and taking approval from client for all survey work done

Getting all type approval for permit to work during construction from ADNOC

Controlling horizontal and vertical bend according to pipe line alignment sheet

Preparing NOC drawings for pipe line project at crossing of third party facilities like GASCO lines, CICPA Fence, ADDC water line sewerage line overhead electric lines etc.



Contact this candidate