Curriculum Vitae
MOGAMAT ABDOL
Position : SURVEYOR.
Date of Birth : 1972/08/29.
Nationality : SOUTH AFRICAN.
Marital Status : MARRIED.
Highest Educational Qualification : TECHNIKON S2.
Years in Construction : 22 Yrs.
Years at Power Construction
NQF level
:
:
20 Yrs.
MATRIC WITH DISTINCTION
(MATHEMATICS)
Profile:
Dear Hiring Manager.
I joined Power Construction (Pty) Ltd in 1998 as a Civil Trainee, employed with-in their low-cost housing developments team.
I then joined the Survey Learnership Program in 2000, which lead me towards achieving my goal as SURVEYOR L1 (Level1) in 2009.
Between 2004 – 2008, I had an opportunity to survey Power Constructions civil teams, taking full responsibility for all survey related operations as required or identified on site, within the field of Surveying.
During this time, I have gained an extensive amount of experience in a range of Survey Skills, which include but not limited to –
PROFILES (PEGS) FOR ROAD WORK LAYER WORKS WITH ELEVATIONS, KERBING PEGS, OVERHEAD SIGNAGE GANTRY STRUCTURES, BRIDGE PIERS, PILLING LOCATIONS, POSITIONS OF STRUCTURES, EARTHWORKS, SEWER AND STORMWATER MANHOLES, DRAINAGE INLETS, AS BUILT DATA SURVEYS, SUBMISSION OF AS BUILTS TO ENGINEERS DEPARTMENT FOR APPROVAL, TACHE-OMETRIC SURVEYS, SETTING OUT AND ELEVATION CONTROL OF UNDERGROUND SERVICES INCLUDING THE EXCAVATION, LAY AND BACK FILLING OF UNDERGROUND SERVICES, (SEWER, STORM-WATER, WATER MAINS AND DUCTS), EARTHWORKS VOLUME QUANTIFICATIONS AND COMPLETION OF WORK AND MOS FOR END OF MONTH CERTIFICATE. MS OFFICE SUITE (Excel, Word etc.) AND SURVEY SOFTWARE PROFICIENT. TOTAL STATION AND ROBOTIC STATION PROFICIENT and TRIMBLE GPS SURVEYING EXPERIENCE.
As of JANUARY 2008 - 2019 I have been privilege to have worked and successfully completed several large Civil Contracts/Projects with Power Construction where I have managed to gain much valuable experience in the Setting out of Road Works (Freeway) and a variety of Civil Construction Works over several years. These Contracts involves working to world class standards (ISO 9001), and I have had the opportunity of involving myself in most if not all SURVEY RELATED DISCIPLINES as required or identified on a Civil Works Site.
Key areas of Experience / Skills Surveying – All Construction Surveying Responsibilities as required on SITE/ As Identified.
• SETTING OUT ROAD LAYER WORKS PEGS INCLUDING THE FINAL ELEVATIONS FOR CONSTRUCTION PURPOSES.
• SETTING OUT OF UNDERGROUND SERVICES (SEWER, STORM-WATER & WATER-MAINS), SIGN GANTRIES, and CONCRETE STRUCTURES AS PER THE DESIGN.
• UNDERGROUND SERVICES - PIPE WORK/DUCTING WITH PIPEWORK EQUIPMENT. (UNDERGROUND SERVICES) USING A PIPE LASER & DUMPY LEVEL.
• EXPERIENCE IN THE USE OF NIKON TOTAL STATIONS WITH CEASAR ON-BOARD SOFTWARE.
• SETTING OUT USING A TOTAL STATION. (NIKON DTM). ROAD WORK PROFILE PEGS WITH ELEVATIONS.
• SETTING OUT DESIGN ELEVATIONS USING A DUMPY LEVEL. (AUTO-LEVEL).
• ROAD LAYER WORKS ASBUILTS USING A TOTAL STATION WITH ELEVATIONS AND AUTO-LEVEL (DUMPY LEVEL).
• ROAD LAYER WORKS ASBUILTS REDUCTIONS & SUBMISSIONS TO ENGINEERS OFFICE FOR LAYER WORKS APPROVAL.
• TACHEO-METRIC SURVEYS USING A TOTAL STATION.
• TACHEO-METRIC SURVEYS USING A TRIMBLE GPS & BASE STATION.
• EXPERIENCE IN UTILISATION OF TRIMBLE GPS SYSTEMS (ROVER) WITH BASE STATION.
• EARTHWORKS QUANTITIES AND VOLUME CALCULATIONS USING THE LATEST CIVIL ENGINEERING SOFTWARE (MODEL MAKER & ROAD MAKER).
• USING TRIMBLE ROBOTIC STATIONS AND MACHINE CONTROL–FOR SETTING OUT & ELEVATIONS. (TRIMBLE SPS SERIES).
• TRIMBLE ROBOTIC STATIONS FOR GRADE CONTROL ON CONSTRUCTION MACHINERY. (GRADER & MILLING MACHINE).
• CALCULATING & LOADING OF DESIGNS ONTO TRIMBLE GRADE CONTROL CONSTRUCTION EQUIPMENT.
• MANAGING SURVEY ASSISTANTS & LEARNER/JUNIOR SURVEYORS.
• MS OFFICE PROFICIENCY (EXCEL, WORD, OUTLOOK, MODEL MAKER, TRIMBLE BUSINESS CENTRE.
• ABLE TO TAKE INITIATIVE.
• FLEXIBILITY IN TERMS OF WORKING HOURS.
• GOOD COMMUNICATION SKILLS.
• ABILITY TO SPEAK, READ AND WRITE IN ENGLISH AND AFRIKAANS.
• TRAINING AND MENTORING OF STUDENTS WITHIN THE FIELD OF SURVEYING.
• 20 YEARS SURVEYING FIELD EXPERIENCE.
• UN-ENDORSED CODE 8 DRIVER’S LICENSE.
YEAR ROLE/TITLE NATURE OF WORK SELECTED PROJECTS VALUE 2020-
2018
SURVEYOR L1 ALL SURVEY
RESPONSIBILITIES AS
IDENTIFIED ON SITE,
INCLUDING EARTHWORKS
AND LAYER WORKS
QUANTIFICATION FOR
MONTHLY COST
CERTIFICATE.
N2 – MOSSEL-BAY – GROOT BRAK
RIVIER - SINGLE CARRIAGE-WAY,
FULL LAYERWORKS
REHABILITATION & ASPHALT
OVERLAY INCLUDING ROAD –
MARKING. CIVIL SERVICES –
SEWER, STORM-WATER AND
WATER-RETICULATION. BULK
EARTHWORKS (CUT & FILL SLOPES)
R 220 000 000
2017-
2016
SURVEYOR L1
ALL SURVEY
RESPONSIBILITIES AS
IDENTIFIED ON SITE,
INCLUDING EARTHWORKS
AND LAYER WORKS
QUANTIFICATION FOR
MONTHLY COST
CERTIFICATE.
N2 – NATIONAL ROAD DUAL
CARRIAGE-WAY FREEWAY, FULL
LAYERWORKS REHABILITATION &
ASPHALT OVERLAY INCLUDING
ROAD –MARKING. BULK
EARTHWORKS (CUT & FILL SLOPES)
R 180 000 000
2015
SURVEYOR L1
ALL SURVEY
RESPONSIBILITIES AS
IDENTIFIED ON SITE,
INCLUDING EARTHWORKS
AND LAYER WORKS
QUANTIFICATION FOR
MONTHLY COST
CERTIFICATE.
LLANDUDNO & CAMPS BAY DRIVE,
FULL LAYER WORKS
REHABILITATION & ASPHALT
OVERLAY INCLUDING ROAD-
MARKING.
R 100 000 000
2014
SURVEYOR L1
ALL SURVEY
RESPONSIBILITIES AS
IDENTIFIED ON SITE,
INCLUDING EARTHWORKS
QUANTIFICATION.
STELLENBOSCH ARTERIAL – CAPE
TOWN – ROAD SURFACE OVERLAY
& ROAD-MARKING.
R 80 000 000
2012 -
2013
SURVEYOR L1
ALL SURVEY
RESPONSIBILITIES AS
IDENTIFIED ON SITE,
EXCLUDING EARTHWORKS
AND LAYER WORKS
QUANTIFICATION FOR
MONTHLY COST
CERTIFICATE.
EAST LONDON AIRPORT – EAST
LONDON – RUNWAY
REHABILITATION & ASPHALT
OVERLAY INCLUDING ROAD-
MARKING.
R 140 000 000
2010-
2011
SURVEYOR L1
ALL SURVEY
RESPONSIBILITIES AS
IDENTIFIED ON SITE,
EXCLUDING EARTHWORKS
QUANTIFICATION.
ALBERTON N3 & N12(40 Km’s) –
GAUTENG – DUAL CARRIAGEWAY
REHABILITATION.
2008-
2009
SURVEYOR L2
MAJOR ROADS SETTING
OUT
ASBUILT LAYER WORKS
REDUCED & SUBMISSION
FOR APPROVAL.
R21 (6 Km’s) – KEMPTON PARK –
GAUTENG – DUAL CARRIAGEWAY
REHABILITATION, ASPHALT
OVERLAY INCLUDING ROAD-
MARKING.
R 100 000 000
2006 -
2007
SURVEYOR L2
MINOR ROADS SETTING
OUT.
SERENGETTI – GAUTENG – GOLF
COURSE ESTATE & WILD-LIFE
SANCTUARY
R 100 000 000
2004 -
2005
SURVEYOR L3
MAJOR ROADS SETTING
OUT.
GEORGE TO KNYSNA- N2 (40 Km’s)-
REHABILITATION OF EXISTING
CARRIAGEWAY
R 80 000 000
2002-
2003
SURVEYOR L3 PIPE WORK & MAJOR
ROADS SETTING OUT.
HANOVER N1 (10 Km’s) &
RICHMOND N1 (10 Km’s)
R 40 000 000
2000 -
2001
LEARNER SURVEYOR EXTENSIVE PIPE WORK
SURVEYING & MINOR
ROADS SETTING OUT.
PHILLIPI – CAPE TOWN
R 10 000 000
Work Reference
Name Role E-Mail Cell
1 Jaybalan
Ayakannoo
Site Agent **********@********.**.** 082-***-****
2 Daniel
Burger
Contracts Manager *******@********.**.** 082-***-**** 3 Charl Cyster Chief Surveyor *******@********.**.** 082-***-**** 4 Gary Hirst Contracts Manager ******@********.**.** 082-***-**** 5 Julian Du Preez Managing Director ********@***.**.** 079-***-**** 6 Faldeelah Abdol Wife **************@*****.*** 078-***-**** Kind Regards
Mogamat Abdol
************@*****.***
CELL: +27-72-740-****
CELL: +27-78-593-****