Post Job Free

Resume

Sign in

Power Plant Commissioning Manager

Location:
Gurgaon, Haryana, India
Salary:
Negotiable
Posted:
December 04, 2021

Contact this candidate

Resume:

Vinay Kumar Gupta

Flat no D*- ***, KLJ Platinum Plus,Sector 77, Faridabad HARYANA

Mobile No. 828-***-****; Email: adpjzw@r.postjobfree.com Job Objective

Seeking middle/senior managerial positions in EPC/ Maintenance/ Project Management with a progressive organization of repute.

Career Synopsis

- A Qualified Electrical Engineer with over 28+ years’ extensive experience in plant maintenance, automation, project management, erection & commissioning with a manufacturing and EPC major.

- Erection, commissioning of 4 X 300MW Rosa Thermal Power Plant, 2 x 700 MW Rajpura Thermal Power Plant electrical systems from grass root to final COD. Commissioning of 3 x 800 MW Kudgi Thermal Power plant Generator System. Erection and commissioning of 2x 660 MW Meja Thermal Power Plant

- Managing and developing contractors and sub-contractors for timely completion of awarded work as per schedule. Processing of bills for payment and reconciliation of material.

- Experience in managing preventive and predictive maintenance of Electrical Systems of Co-Generation Plant including TG, Boilers & its auxiliary,Transformers,132 KV Switch Yard, VCB, SF6 CB, PCC, MCC, Motors,750KVA DG Set, Battery, UPS, DCS, Generator Excitation System etc.

- A resourceful professional with expertise in managing a wide continuum of project work encompassing project planning and layout, detailed engineering, budgeting, raising purchase requisition, installation, commissioning, testing and maintenance.

- Effectively handled the engineering & commissioning of projects such as capacity enhancement of Alumina Plant by 6.6 lacs TPY, 37 MW & 41 MW Co-generation Plant.

- Finalizing equipment specification with selected vendors.

- Reduced inventory of running maintenance by standardizing various equipment at the project initializing stage. Organizational Experience

Career Path

Apr’2015 till date Deputy General Manager in Toshiba JSW Power System July’2010-Apr’2015 Deputy General Manager in L &T Power Ltd Nov’2007-July’2010 Deputy General Manager Reliance Infrastructure ltd. Jan’2000-Nov’2007 Area In charge –Elect Maint. Co-gen plant Hindalco Industries limited Mar’1992-Dec’1999 Asst. Superintendent (Engineering Division) Hindalco Industries limited April’2015 till date in Toshiba JSW Power System joined as Deputy General Manager in the Construction Management (Commissioning) of 3x800 MW KUDGI Thermal Power Plant. Responsibility of erection and commissioning of mechanical and electrical system of Generator and its auxiliaries. Managing a team of 27 engineers.

Reporting to Commissioning Manager (Japanese)

Key performance area

Ensure erection completeness and organizing & managing flushing activities for making system ready for commissioning as per approved procedure, meeting criteria.

Managing individual commissioning of Generator & Turbine related system i.e seal oil system, stator cooling water system, Turbine Bearing Lube oil system, gas system etc. to achieve target of synchronization.

Organizing TBM before start of work. Assessing safety hazards and creating safety awareness among staff.

Operation of system as per system requirement.

Preparation of site test record and submission to client

Organizing meeting with client, contractor and team for early resolution of issues related to fronts, material and manpower etc.

Coordinating with engineering and project management team for site urgent enquiry. July’2010 till April’2015 in L & T Power -Deputy General Manager in the project management of 2x 700MW Rajpura Thermal Power Plant. Later on shifted to site with the responsibility of erection and commissioning of electrical equipment.

Managed a team of 5 engineers and 5 electricians to complete the project in time. Reporting to Project Director.

Key performance area

Coordination with engg. consultant for submission of deliverables as per 3 month looks ahead schedule.

Expediting sub vendors for timely submission of drawings, placement of order and delivery at site.

Saved time by successfully commissioning 11KV panels through const power in absence of startup power.

Organizing pre-commissioning/ commissioning test on Generator, IPBD, HT switchgear, Motors etc.

IPBD temperature rise issue in V phase at full load was resolved by providing path to flow of circulating current to ground.

Tripping of generator breaker on synchronization due to inappropriate bucholz relay identified and rectified.

Nov’07 –July2010 Reliance Infrastructure Limited (ADAG Group), as Deputy General Manager. The purview area includes successful erection, commissioning of main plant and BOP electrical system of 4x300 MW Phase I Rosa Thermal power plant project. One month deputation for stabilization of 2x300 MW Yamunanagar Power plant

(HPGCL). Active participation in making Rosa TPP OHSAS certified site. Key performance area

Erection & Commissioning of Generator, GT, UAT, ST, HT/ LT sw.gr, Battery/Charger, MCC etc.

Co-ordination with SEC and other Electrical Equipment supplier for short supply, damage material and pre commissioning check.

Resource planning with contractor to meet erection activities as per L2 schedule.

Coordinating with Government Official for statuary clearances.

Successfully resolved the problem of zero IR value of Generator stator wdg, non availability of SEC engineer during commissioning of AVR, GRP.

Completion of synchronization & COD of 300MW Unit- I & II. Guiding & training a team of 9 engineers to get desired result. Reporting to Construction Manager/ Project director Mar’92 to Nov’07 with Hindalco Industries Ltd., Area in charge Cogeneration Elect. Maintenance. The purview area includes successful engg, commissioning of new power plant project and later on maintenance of 78 MW Power plant (4 turbines & 4 Boilers). A flagship company of Aditya Birla Group. Key Performance Areas (As Area In charge Co-generation electrical maintenance). Plant Maintenance

- Over all responsibility of electrical maintenance of 41 MW Co-Generation Plant.

- Conceiving apt maintenance plans consisting of predictive and preventive plans for curtailing machine downtime. Implemented scheme to avoid tripping of critical equipment.

- Maintaining adequate inventory of spares for replacement purposes.

- Managing the commissioning work inclusive of pre-testing & trial run of equipment. Automation Initiatives

- Developing logical diagrams and I/O sizing for automating the processes.

- Installing VVVF Drives for energy conservation /SCADA signal for Co-gen plant for fault analysis. Project Management

- Spearheading project planning work encompassing study, project layout and design, schematic and interconnection diagrams, budgeting, and determination of equipments.

- Floating request for procuring project requirements and finalizing technical specification in terms of delivery, quantity with selected vendors.

Significant Accomplishments

As Area in charge Cogeneration-maintenance

Played stellar role in timely installation and commissioning of electrical equipments of unit I & II.

In house repair of exciter & Burnt Cable revamping job completed in record time of 11 days. As Asst. Superintendent (Engineering Division)

Distinction of handling the engineering & commissioning of the different projects including.

- 37 MW & 41 MW Co-generation Plant.

Successfully utilized spare capacity of transformer and MCCs to reduce project expense.

Preparation of SLD, cable tray, PA system, illumination layout drawing, freezing equipment specification, placement of order, Cable schedule, BOQ, scheme drawing, Relay setting etc. Commenced professional career with a reputed paper mill company as Engineer (Jan’91-Feb’92) Engineering/ Maintenance Purview

Electrical Systems of Co-Generation Plant.

Educational Credential

B.E. (Electrical) from MITS (State Engg. College), Jiwaji University, Gwalior in 1990. (Secured 74.50%) Date of Birth

6th November, 1966.



Contact this candidate