CONTACT INFORMATION Hadi Ghodrat

Postal Address: No.141, 29/5 Al., Ghasrodasht St., Shiraz, Iran Cell-Phone: +989*********, +987*********

Email: ***********@*****.***, ***********@*******.***.**.** linkedIn: https://www.linkedin.com/in/Hadi-Ghodrat-0a846456/ WORK EXPERIENCES

2011-Present Civil and Geotechnical Engineer

Iranian Oil Ministry-Khangiran Gas Refinery/3rd refinery of South Pars Gas Complex (SPGC)

Some of key responsibilities are listed as below:

- Geotechnical and structural design/check/rehabilitation of on-site and offshore structures such as pipe racks, equipment foundations, industrial shelters, above ground or underground reservoirs, connection roads, open tail water ponds, outfall open channels, retaining walls, slope stability, sea lines and relative connections via finite element tools based on national codes and domestic marine considerations.

- Feasibility study and rehabilitation method for disturbed industrial structures such as pipe racks, onsite and offshore trains due to abuses, operational events, unallowable loading, corrosion.

- Feasibility study and rehabilitation method for damaged industrial onsite and offshore foundations due to settlement or corrosion.

- Feasibility study and rehabilitation method for damaged retaining walls and earth fills due to settlements or unallowable horizontal deflection according to national codes and marine considerations.

- Preparation of design scope, cost estimation and cooperation with contract department in order to select qualified consultant/design team.

- Cooperation with and managing the consultant/design teams via technical communication, determination and allocation of technical tasks, technical control of design process including calculation notebooks and design steps, construction drawings, cost estimation and price lists, time scheduling and tender documents.

Some of the recent project activities are listed as below: Project Name Date Activity Responsibility

3rd refinery (SPGC)-flare

area modification and

stabilization project

2019

(ongoing)

- Slope stability of the flare area as an the highest level of flare stacks in all South Pars Gas Complex and

huge rock blocks stabilization, modification and

stabilization of flares pipe rack foundations against settlement, road pavement design (overall steep:

more than 50 ̊).

Project Manager

3rd refinery (SPGC)-Unit

129 catch pit and storm

basin wall deflection

modification

2019

(ongoing)

- Concrete retaining wall deflection modification

method for unit 129-catch pit with creational

methods against oily water seepage and via fastest method

- Concrete separation wall stabilization method for unit 129- storm basin (unbounded length is about

50m and depth of about 20m)

Project Manager

Pars1 block area- General

Outfall open channel

modification

2019

(ongoing)

- Concrete outfall open channel stability modification, harshly intensive concrete corrosion due to

unallowable polluted water discharge

Project Manager

team member

and South Pars

Gas Complex

Representative

Unit 103-Pipe rack

deflection modification

2019

(ongoing)

- 5 floors pipe rack deflection modification (total height from base: about 27m), due to operation

mistake and non-predicted equipment loads.

Project Manager

Underground melted

sulfur reservoirs

modification (Khangiran

Gas Refinery)

2016-

2017

- 4 concrete reservoirs for melted sulfur (internal temperature: about 175̊c), harshly corrosion in walls and roofs were modified by special treatment

material and suitable curing method.

Technical

expert and

Client

Representative

2011-Present Geotechnical Engineer

A part time cooperation with Pars Payab consultant engineers co. has been doing and some of key responsibilities are listed as below:

- General supervision on the site investigation process such as coring (wash boring, continues coring) and sampling (disturbed core barrel and SPT sampler) and undisturbed (Shelby) and in- situ test including SPT, CPT, Plate load test, pressure meter test, van shear test.

- Geotechnical investigation planning (boring arrangement and drilling depth determination), type and number of in-situ and laboratorial tests

- Test result analyses and representative parameters determination

- Geotechnical calculation including bearing capacity of shallow foundations and deep foundations (offshore and onshore), slope stability analysis, liquefaction

Some of the recent project activities are listed as below: Project Name Date Activity Responsibility

Abbas-Abad Complex

(Tehran)

2013-

2015

- Geotechnical investigation of Tabiat bridge,

Abrisham1 bridge, Abrisham2 bridge, Solar system

complex, Painting house, Flower house, Music house Technical

expert

Some-E-Olia Dam 2015-

2016

- Master construction supervision Master

Supervisor and

Technical

Expert

Vargar Dam 2017 - Phase1 design Project Manager

and

Geotechnical

Expert

Azadegan Highway 2013 - Geotechnical investigation Technical expert

Roodik Shrimp Dock 2015 - Geotechnical investigation and foundation design Technical expert

2007-2011 Geotechnical Engineer

Imensazan Consultant Engineers Institute, Tehran (Iran) Check, review and comment on the geotechnical design and soil-structure interaction analysis for different tunneling aspects and the geotechnical design of underground structures

Some of the activities are listed as below:

- Review and check of the design reports for the soil-structure of the tunneling and lining.

- Review and check of the design reports for the face pressure analysis of the mechanized tunneling.

- Review and check of the design reports for the face pressure analysis of the mechanized tunneling.

- Review and check of the report for Tunnel Boring Machine

(TBM) selection based on the ground condition along the tunnel route.

- Review and check of the risk analysis report due to the tunnel induced ground settlement along the tunnel line.

- Review and check of the design reports for stability analysis of the access galleries for the temporarily retaining structure of underground rail way stations.

- Performing the parallel checks of different geotechnical analysis including the ground stability, tunnel induced settlement, soil pressures around the segmental tunnel line, etc. by modelling and running the numerical analysis.

- Field and laboratory testing plans for the geotechnical site assessments,

- Design aspects for the mechanized tunneling. This task was involving the required design activities for

EDUCATION RECORDS

2016-Present Phd candidate

civil/transportation engineering at Payam-E-Nur University of Tehran, Tehran, Iran.

Predicted Graduation Date: Sep, 2020

2004-2007 M.Sc. degree

civil/Geotechnical engineering at Kharazmi University of Tehran, Tehran, Iran.

GPA: 17.52 /20 (percentile: 87.60%)

Graduation Date: Feb, 2007

2000-2004 B.Sc. degree

Civil engineering at /dam and network at Power and Water University of Technology, Tehran, Iran.

GPA: 16.89 /20 (percentile: 84.45%)

Graduation Date: Sep, 2004

PUBLICATIONS

- Tabatabaei, S. A., Moosavi, S. R., Samadi, S., Ghodrat, H., Taghinejad Omran, A, (2018),

"Application of Bitumen Emulsions in Road Construction”, Vol. 1, Asr-E-Ghalam Inc., Iran.

- Keymanesh, M. R., Ghodrat, H., (2018), "Study of Traffic Pattern and Vehicle Violation on Roads Leading to Shiraz (Iran) in March, Proc. of Int. Conf. on New Horizons in the Engineering Science, Istanbul, Turkey.

- Ghodrat, H., (2015), "Study of Oil Contaminated Soil Influences on Bearing Capacity of Shallow Foundations (Case-Study: Shahid Hasheminejad Gas Processing Co. (SGPC)), Proc. of Int. Conf. on Science and Engineering, COI: ICESCON01_0520.

- Ghodrat, H., (2014), "Geotechnical Investigation Planning of subway Projects in Urban Areas", The Electronic Journal of Geotechnical Engineering, Vol. 19, Bundle Y, PP. 8561-8568.

- Ghodrat, H., Yazdinejad, A., Hoseinimasum, J., Barjinikhabbaz, M., (2013), "An investigation on the stack vibrations and geotechnical rehabilitation solutions, case-study: Khangiran Gas Refinery", seventh international conference on case histories in geotechnical engineering, Chicago, United States.

- Khosrotash, M., Bonakdar, A., Ghodrat, H., (2013), "An innovative method for passing collapsed zone using foam-concrete (case-study: Ghomroud water conveyance tunnel-Lot1", World Tunneling Congress, Switzerland.

- Ghodrat, H., Khosrotash, M., Torabi, M., Khosrotash, M., (2012), "Geometrical Design of Launch Shaft for Mechanized shield Tunneling", World Tunneling Congress, Thailand.

- Soltanzade, G, Saeedi, M, Rafighi, N., Ghodrat, H., (2010), "seepage preventing measures in Somee Olia Dam", 1st National Conference on Structure- Earthquake- Geotechnics, Babolsar, Iran.

- K. Edalat, M. J. Vahdatirad, Ghodrat, H., S. Firuzian, A. Barari, (2010), "CHOOSING TBM FOR TABRIZ SUBWAY USING MULTI CRITERIA METHOD", JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT (JCEM), 16(4): 531-539, doi:10.3846/jcem.2010.59

- A. J. Choobbasti, Ghodrat, H., M. J. Vahdatirad, S. Firuzian, A. Barari, M. Torabi, A. Bagherian,

(2010), "Influence of Rice Husk Ash Usage in Soil Stabilization Method with Lime", Front. Earth Sci. China, doi: 10.1007/s11707-010-0138-x

- M. J. Vahdatirad, Ghodrat, H., S. Firuzian, A. Barari, (2010), "Analysis of an underground structure settlement risk due to tunneling-A case study from Tabriz, Iran", Songklanakarin Journal of Science and Technology, 32 (2), 145-152.

- M. J. Vahdatirad, Ghodrat, H., S. Firuzian., A. Barari, M. Torabi, (2009), "Analysis of Underground Market Settlement in Tabriz Urban Railway", European Journal of Scientific Research, Vol. 36, Issue. 4. pp.595-604

- Ghodrat, H.,Ghanbari,A. (2007), “Elastic Modulus Assessment for south of Tehran alluvium using results of laboratory and In-situ tests”, 3rd national congress of civil engineering, Tabriz, Iran.

- Abolghasemi, M., Jolokhani, H., Ghodrat, H. and Ramezanian, A. (2005), “Suitable layout for intake location in sinuous rivers and the effect of flow diversion on pothole location”, 12th civil engineering students conference, Tehran, Iran.

- Ghodrat, H., Nabipour, M., (2004), “workshop of Dams, the greatest hydraulic structures-case study: Karkhe dam”, civil engineering students conference of power & water university of technology, Tehran, Iran.

- Khalaj Amirhosseini, Y., Ghodrat, H., (2003), “an investigation on seepage from dam bodies & reservoirs”, published in website of Power & Water University of Technology, Tehran, Iran. SOFTWARES SKILLS MASTERED

- Skilful at Microsoft Office Suite and AutoCAD-2D.

- Familiar with geotechnical software such as PLAXIS (2D, 3D Tunnel & 3D Foundation), Allpile and Geo-slope package

(SeepW, SlopeW)

- I have limited knowledge of FLAC 3D

ACADEMIC REFERENCES

1

Name of

Ref.

Ali Farhadi Organization Kharazmi University

Occupation Assistant Professor Relationship professor-student Address

Kharazmi University,

Tehran, Iran. E-mail Address *******@***.**.**

Telephone

No.

+982********* Year(s) Known 15

2

Name of

Ref.

Ali Ghanbari Organization Kharazmi University

Occupation Associate Professor Relationship professor-student Address

Kharazmi University,

Tehran, Iran. E-mail Address ********@***.**.**

Telephone

No.

+982********* Year(s) Known 15

3

Name of

Ref.

Mohammad Javad

Vahdatirad Organization

Vattenfal A/S

www.vattenfall.dk

Occupation

Senior Lead

Geotechnical Design Relationship

Research-

deep friendship

Address

Kolding, Southern

Region, Denmark E-mail Address

*************.**********@**********.***

Telephone

No.

+45 27875135 Year(s) Known 12



Contact this candidate