Post Job Free

Resume

Sign in

Tejas Air Force

Location:
India
Salary:
9 -10 LPA
Posted:
September 28, 2021

Contact this candidate

Resume:

Confidential C

Asha Onkarappa

E-Mail : adot95@r.postjobfree.com

Phone: +91-998******* / 994-***-****

Total years of experience: 9+ years

Native: Davangere, Karnataka

Current location: MWC, Chennai

PROFILE SUMMARY

Totally 9+ years of experience in Harness design and PLM support as a senior Engineer with major experience in PLM & PDM

Currently working with Magna InfoTech from Feb’ 2019 to current

Previously worked with Capgemini, Bangalore Oct’ 2012 to Feb’ 2019 (7.3 Years)

Previously worked with Aeronautical Development Agency (ADA), Bangalore from Aug’ 2011 to Oct’2012 (1.2Years) SKILLS SETS

• 3D Wiring Harness Routing

• 2D Wiring schematic & Drawing

• 3D Flattening

• Product Lifecycle Management (PLM)

• Training on Creation of 3D model of P&G Plastic components

• Aerospace Structural B Bracket drawings creation

• Composite Drawings

Tool Expertise:

Enovia, Catia v5, 3D experience and hand on experience on UG-NX CAD tools, signee, process simulate. ORGANISATIONAL EXPERIENCE

RENAULT NISSAN TECHNOLOGY & BUSINESS CENTRE INDIA, CHENNAI (Apr’2015 to Current) Project 05. Renault Capture, Currently CMFB project - Feb’2017 to Current (Role – Sr. Engineer) Creation of wiring harness 3D model with bracket design using CATIA Tool respecting the standards of design with the input from cross functional team, schematic team and PDE (part owner). Continuous interaction with Supplier & Customer for finalizing the Design

Roles and Responsibilities:

• Projects handled – BBA (Renault KWID), HBC (Remote Project).

• Understanding the Customers (France) need and Checking the feasibility of the design in Vehicle Zone.

• Following the Norms, Technical rules & Regulation in design process

• Simulation check (Cocoon Macro) for the Routing to analyze the dispersion of bundle.

• Coordinating with DMU Vehicle Team for the Design Freeze

• Exporting the Wiring Harness DATA (xml) to suppliers for generating Drawing (2D).

• Milestone Checks & Deliveries for the supplier 2D preparation.

• Strong Knowledge in Product Lifecycle Management (PLM) using ENOVIA & CATIA Project 04. Engineering support for business users -April ‘2015 to Feb’2017 (Role – Sr. Engineer) Harness support

Incident management, Business validation during new release, following up the topics with corporate for permanent fix Floor Support: Floor support for various engineering departments (E, g BIW, Harness,) to resolve their queries Functional Training for electrical users

Electrical Support - Harness designers, Generic model team CAPGEMINI INDIA PVT. LTD.-SOGETI GMBH, BANGALORE (Oct’2012 to Feb’2019) Project 03. Secondary structures Installation and Design support forXWBA350 (Role – senior consultant) Creating installation drawings of Secondary structures for B Brackets for A350 Confidential C

As per AIRBUS Standards using CatiaV5

Design and updating of B brackets using CatiaV5

Creation of DT (Design tree) in Enovia

Filling PDM link attributes.

Good knowledge on 3D and 2D standards of Airbus methodology. Customer co-ordination. Picture drawing creation for AKC updating Project 02: Creation of rib drawing without using CPD license for VTP A350 A/C Study the requirement placed by the Designer Manufacturing team for feasible solutions. Modification to be carried out in the related drawings and models according to the comments provided by the respective teams Quality check of Drawing

Finally uploading the V5 models & drawings into Enovia V5 VPM database AERONAUTICAL DEVELOPMENT AGENCY (ADA), BANGALORE: (March 2011 to Sept 2011) Project 01-Electrical Harness design in 3D DMU for LCA Tejas A/C Client: Indian Air Force (IAF) & Indian navy. Duration: March 2011 to Sep2011

Worked on CATIA-V5 R19, Electrical Harness for LCA Tejas aircraft.

Well versed with the concepts of CATIA V5: EHI, EHA, Part Modeling, and Assembly Drawing & Installation Drawings Creation

Electrification of the standard parts like “Connectors, Back shells, Junction Modules, Circuit Breaks, and Relays”

Harness Installation drawing Creation for LSP8 & PV5 A/C, Checking the routing

path both in Catia GA as well as on Physical a/c.

3D Electrical Harness looms Design, Connector, Back shell- Part modeling and

drafting activities.

Preparation of breakdown list for start and end connectors, with the coordination of Electrical Design Group, installation of secondary support structure for LCA.

Routing the harness in proper feasible way from starting to end by using

Electrical Harness Design workbench.

Creating the 3d xml files, loom routing electrical installation drawing.

Promoting the 3D Model and 2d drawing to Design Quality group for release.

Any queries raised by Inspection/Shop floor regarding the deviation on electrical loom routing to be absorbed by making higher issue for future series of aircraft

ACADEMIC DETAILS

B. TECH (Industrial & production) from University of BDT college of engineering, Davangere in 2010; secured 60% PERSONAL DETAILS

Name : Asha Onkarappa

Father’s Name : Onkarappa K V

Languages known : Kannada, English, Hindi, Telugu, Tamil Marital status : Married

Permanent address : DCM township, Davangere-577002 I hereby declare that the information furnished above is true to the best of my knowledge ASHA ONKARAPPA

Date: 27/09/2021

Place :Chennai



Contact this candidate