Post Job Free
Sign in

Cycle Power General Electric

Location:
Sahiwal, Punjab, Pakistan
Salary:
As Par your Package
Posted:
September 06, 2021

Contact this candidate

Resume:

RESUME

Name : Imran Ashraf

Applied For : Plant Operator

Nationality : Pakistan

Date of birth : April 20 1999

Current location : Sahiwal, Pakistan

Email : ************@*****.***

Cell Phone # : +92-307-******* +92-340-*******

Address : Chak No 59/5.L Tahsil & District Sahiwal

01 august 2018 to onward

Currently I am working as “Plant Operator” at 225 MW CCPP

Saif Power Limited, Sahiwal, Pakistan.

Job Responsibilities

Safe and efficient operation of plant post and report to control room operator and shift In-charge in case of any abnormality or deviation in the parameters / set points.

Monitoring of all equipment on regular basis in the assigned areas of field.

Responsible for safe and effective emergency handling and trouble shooting at plan post by proper communication with Shift In-charge, control room operator and other operational posts.

Assist in safe & smooth gas turbine, HRSG, steam turbine and other BOP System after routine or emergency stop & smooth power line up with emergency system.

Safe startup and shutdown of equipment of the post. Fills out all required checklists.

Observe gauges, dials, or other indicators to make sure a machine is working properly.

Perform general housekeeping

Writing shift end book and perform shift handover / takeover activities properly

Saif Combine Cycle Power Plant (225MW):

Gas Turbine (General Electric)

FRAME 6FA

Two Gas turbine units, single shaft, heavy duty gas turbines are model of Frame 6FAsupplied by GE (General Electric) Company along with two generators provided by GE as well 75MW each.

Dual Fuel with and Water injection system.

All Auxiliaries motor driven.

Mark VI control system.

Fire and Hazardous gas detection system.

Heat Recovery Steam Generator

HEAT RECOVERY STEAM GENERATOR (Hangzu Boiler CHINA).

Two HRSG’s type of dual pressure, horizontal duct, non-supplement fire and natural circulation.

HP steam pressure 90bar, temperature 537 C and flow 110 t/h.

LP steam pressure 6.0bar temperature 280 C and flow 13 t/h.

Three element control system

Steam Turbine

STEAM TURBINE (SST-900).

Steam turbine 75 MW is single shaft, double pressure, single flow, Impulse and condensing steam.

HP steam flow 210 t/h, HP steam pressure 90 bar, HP steam temperature 533 C.

LP steam flow 36 t/h, LP steam pressure 6.0 bar, LP steam temperature 280 C.

Steam turbine exhausts temperature 42 C.

Ball cleaning system to clean tubes of condenser cooler with rubber balls.

Turbine ETS (Emergency Trip System) for OPC (Over speed Protection Control) and AST (Automatic Shutdown Tripping).

Static Excitation and stator cooling water systems for steam turbine generator.

Water Treatment Plant

Two double pass double train primary RO membrane-based technology used water and each productive output 45 t/h.

Two double pass double train secondary RO units and each of capacity is 35t/h.

67 t/h capacity Mix bed system to removes ions in water.

Chemical dosing system of WTP.

Balance of Plant (BOP)

Balance of plant includes cooling tower system, firefighting system,

Open and Closed cycle system, unloading area of HSD and wastewater treatment plant.

Switch Yard

132KV switch yard system six main outgoing feeders.

Safety & Skill Improvement courses

Firefighting training.

Gas turbine operational training.

HSE courses & training.

LOTOTO (Lock out Tag out Try Out).

PTW (Permit to Work) Procedure.

Personal Details

Father’s Name

Muhammad Ashraf

Date of Birth

20-04-1999

Marital Status

Married

Nationality

Pakistani

C.N.I.C. Number

36502-0323812-3

Passport Number

NIL

Academic Qualifications

Trade

Institute/Board

Passing year

D.A.E.

Diploma of Associate Engineer.

(Mechanical)

P.B.T.E. Lahore.

Govt. College of Technology Sahiwal, Pakistan.

2018

Metric

B.I.S.E. Sahiwal

Govt. High School 60/5-L Sahiwal.

2015

computer skills & other knowledge

Analytical thinking, planning.

Tolerant and flexible to different situations.

Strong verbal and personal communication skills.

MS Office

Internet

CMMS (Maximo).

Waiting for Your Kind Response



Contact this candidate