Resume

Sign in

Resident Engineer International Limited

Location:
Al Ain, Abu Dhabi, United Arab Emirates
Posted:
July 27, 2021

Contact this candidate

Resume:

Versatile and a highly dedicated professional with nearly 3 decades of rich

experience in supervising project activities along with revitalized effective resource utilization to maximize output

Extensive experience in heading construction of highways and roads, bridges, large scale infrastructure, pipeline networks, and construction of steel and reinforced concrete structures

Expertise in managing multiple construction projects while developing baselines; controlling projects with respect to cost, resource deployment, time overruns and quality compliance to ensure satisfactory execution of the same Track record in planning & spearheading cost control activities for the projects / Business Area including contract administration in compliance with Contractual Obligations

Worked on multi-million dollar projects including: o Wahat Al Zaweya Project (AED 3.5 Billion)

o Construction of TPI Surface Treatment Plant (AED 56 Million) Resourceful in managing quantity survey related activities involving resource planning, in-process inspection & coordination with internal departments Resourceful in finalizing requirements & specifications in consultation with engineering consultants/ collaborators, external suppliers, contractors & clients

Rich exposure in coordinating project activities including estimation & costing, design consultancy & civil engineering, with a flair for adopting modern methodologies; excels in ensuring timely completion and handover of the same as per defined parameters; skilled in ensuring compliance Skilled in implementing HSE Standards; gained exposure in conducting audits, training, and taking preventive corrective action to minimize risk/accidents Strong commercial acumen with efficiencies in guiding overall activities, encompassing evaluation / quotation of tenders and competitive bids (technical and commercial), analysis of technical & commercial deviations and managing the spectrum of contractual obligations/techno-negotiation matters Respect and Leverage Human Capital: Motivate, mentor and lead talented professionals; live the culture and lead by example Member of the Engineering Society in Jordan

MS Office Suite and Internet Applications

Core Competencies

Leadership & Strategy Planning

Project Management

Resource Optimization

Budgeting, Cost Estimation &

Control

Contract Administration

Knowledge Sharing/Training

Quality/Risk/Compliance

Management

HSE Management

Techno-commercial Operations

Team Management & Leadership

Soft Skill

Leader

Brevity

Visionary

Inter-personal skills

Academic Details

Bachelor in Civil Engineering

from IAU-USA

Diploma in Surveying from Al

yarmook-Jordan

Diploma in Civil Engineering

from Ibn Khaldoon-Jordan

Diploma in Project Management

from Sharja-UAE

Scaling new heights of success and leaving a mark of excellence at each step; targeting senior level assignments in Project/ Construction Management

adnww8@r.postjobfree.com +971*********

Professional Affiliation

MOAWYA HAMZA ABDUL LATIF

Executive Summary

IT Skills

Since Jun’18 with Wahat Alzaweya L.L.C., UAE as Project Manager – Client Representative Aug’98 – May’18 with Pellfrischmann Ltd./ Conseco International Ltd., UAE as Project Manager –Senior Resident Engineer Mar’96--Jun’98 with Rendel Palmer and Triton Consulting, UAE as Assistant Resident Engineer Dec’94 - Dec’95 with Conseco International Limited, UAE as Senior Site Inspector 1990-1994 with General Transport Company, UAE as Site Engineer Key Result Areas:

Working on Infrastructure, Roads, High-rise Buildings, Piled Foundations, Post Tensioned Applications and other civil activities

Gained extensive exposure in Structural and Infrastructure works Playing a key role in governing the preparation of monthly progress reports involving progress & details for engineering, procurement, construction and commissioning activities Chairing as well as actively partaking in project review meetings in order to assess project progress & de-bottlenecking Please confirm the additional points:

Fixing deadlines and target programme of work for all projects and directing the executing team to finish the project in time & troubleshooting the all over problems with deployment of suitable manpower, equipment and materials Identifying risks of projects and developing strategies to avoid threats and mitigating the effects of those which are essentially unavoidable

Streamlined and established the processes, guidelines, performance and quality standards for supervising the projects Ensured implementation of projects along with emphasizing on timely completion and within budget with focus on enhanced profitability

Enforced alignment of project strategy with business objectives and made modifications to promote efficient project completion

Finalizing requirements & specifications in consultation with engineering consultants/ collaborators, external suppliers, contractors & clients

Scrutinizing of contract/ tender documents for reviewing technical specifications, estimates, tenders and performing evaluations of day-to-day activities

Floating tenders, conducting fair price / market analysis, negotiation and selection of contractor / vendors Evaluating & implementing (Sub) Contracting Works as well as negotiation, award and review of (Sub) Contracts as per contract regimes

Identifying & developing vendor’s source for achieving cost effective purchase of equipment, accessories & timely delivery so as to minimize project cost and ensuring on time payment to vendors Refer to Annexure for all the project details*

Personal Details

Date of Birth: 19th July 1968

Nationality: Jordanian

Marital Status: Married

Passport No.: N707413

Address: P.O. Box No. 17343, Al Ain, Abu Dhabi U.A.E. Visa Status: UAE Employment Visa

Languages Known: English, Arabic and Urdu (basic)

Professional Experience

Wahat Al Zaweya Investment & Real Estate Development L.L.C Project Title: A number of inimitable residential and commercial projects that constituted a strong feeder for property market in the emirate of Abu Dhabi AED 3.5 Billion Role: Project Manager

Description: Wahat Al Zaweya Project has been envisioned as a city filled with all the elements of modern luxury, designed for a distinguished lifestyle in line with the UAE’s goal of making its people and residents the happiest in the world. The visionaries behind this stunning piece of Abu Dhabi real estate Wahat Al Zaweya Project is synonymous with an affluent lifestyle in Abu Dhabi. Extending over 23 million square meters, it is one of the greatest integrated residential projects in the country

Pellfrischmann Ltd./ Conseco Int’l (Feb’16 - May ’18) Role: Project Manager – Resident Engineers

Project Title: Construction of TPI Surface Treatment Plant AED 56 Million Description: Tawazun precision industries (TPI) project construction of surface treatment plant building and associated utility Infrastructures roads and parking. The plant will perform special processes and activities supporting TPI Aero structures manufacturing such as anodizing, cleaning before and after NDT, dye penetrant inspection and painting and shot peening

Conseco International Ltd. (Jun’13 - Feb’16)

Project Title: Stage 7 & 8 Roads, Al Ain Municipality Roads and Infrastructure Projects AED 128 Million Roads projects for Al Ain Municipality

Role: Project Manager –Senior Resident Engineer

Description: Project Manager – Senior Resident Engineers for 4 Nos. of Roads Projects; Resident Engineer for road project stage 8-2.Stage 7 and stage 8 roads works with Al Ain Municipality, as a coordinate engineer between Conseco, AAM, TPD and the all other authorities. ADNOC building offices, as a Coordinate Engineer between Conseco, AAM, TPD and the all other authorities Musanada schools- Abu Dhabi and Al Ain Pellfrischmann Ltd./Conseco International Ltd. (Dec’12 - Jun’13) Project Title: Etihad Airways-Training Academy Centre Role: Assistant Resident Engineer

Description: AED 63 Million project, Building Airways Pilots Training Center for Etihad Airways and associated utility Infrastructure

Pellfrischmann Ltd./ Conseco International Ltd. (2007-2012) Project Title: Al Raha Beach Development / Al Zeina Role: Resident Engineer

Project Description:

This project involved development of a new gateway in Abu Dhabi, United Arab Emirates. The project worth was AED 5.8 billion, residential project consisting of structural and infrastructural works. Site area covered 133,000m2, 7 Precincts containing a mix of 12 storey buildings, townhouses and villas 320,000m3 of concrete, 40,000 tonnes of reinforcement; productivity per week was 5,000m3 The piling work consisted of 600mm, 750mm, 900mm, 1000mm, 1200mm and 1500mm of casing types of total 1,542 piles installed by Swissboring

Use of precast twin wall for construction of retaining wall, precast concrete plank and beam system for all the ground floor slabs, Doka Jumping System for 28 lift cores, prefabricated concrete encased steel shell stair system (Stairmaster - first time in UAE) and post tensioned slab done by VSL All apartment partitions walls were self delivered by using Hebel Acoustic wall system, external walls are self delivered using solid blocks. All bathrooms were done by Modular pods, a preassembled bathrooms coming from the factory, erected by using cranes, hoists and skates

Screed and Tiling was done by Deemah stone, dry wall lining and ceiling by Cloisall, MEP jobs by BK Gulf, bathroom connections by AMP, lifts by Otis, painting by Roseville, external scaffolding by Al Laith, glazing by Yuanda, EIFS cladding by Belhasa and roof waterproofing by Sika

Administered the Paving and infrastructural work

Conseco International Limited - 2003 - 2007

Project Title: Roads in Mabazzara in Jebel Hafeet, Al Ain Role: Operations Manager (Al Ain Office)

Description: The project was concerned with the construction of a 7.3m carriageway from the existing Jebel Hafeet road to the existing reservoir and restaurant. Two 4m wide footbridges were constructed providing access across the existing wadi. Annexure (Project Details)

The total length of the carriageway was 2.2km with two roundabouts, parking areas for the restaurant and two parking areas at the reservoir.

Project Worth: AED 30 Million

Project Title: Internal Roads in Different Areas of Al Ain Stage – 14 Description: The project encompassed 70 different areas including upgradation of 8km of desert road between two existing roundabouts to dual 3-lane carriageway standard and a 650m runway including two helipads for a private airport in Al Ain. Project Worth: AED 100 Million

Project Title: Roundabout 275 West to Airport Roundabout, Al Ain Description: This project involved construction of a new dual 3-lane carriageway between two existing roundabouts. The length of the project was approximately 10km with a bridge consisting of two independent structures, one for each carriageway, crossing the realigned Wadi Towayya, three roundabouts and twelve side road junctions. The project works included sand dune levelling 75m each side of the carriageway, service works, surface water drainage, street lighting, footways, fencing, slope protection to the wadi and other associated works Project Worth: AED 47 million

Conseco International Limited (Dec’00 - Jun’03)

Project Title: Al Ain Stage 14

Role: Assistant Resident Engineer

Description: Acted as an ARE and Quantity Surveyor for the “Internal Roads in Different Areas of Al Ain Stage – 14” project. Played a key role in examining design drawings, organizing & participating in coordination meetings with designers and consultants, delivering valuable recommendations on solutions for technical problems Performed rigorous planning, monitoring and reporting work progress to upper management Successfully prepared technical submissions for materials, construction methods, quality plan and safety plan Efficiently administered Storm water and sewerage pipeline work Conseco International Limited (Aug’98 - Dec’00)

Project Title: Low Cost Housing and Infrastructure Project in Al Ain Role: Assistant Resident Engineer

Description: Thr project worth was AED 35 million. The project fulfilled the infrastructure requirements for the new areas of Low Cost Housing at Al Salamat and Al Maqam, including roads, accesses and parking areas, provision of surface water drainage and street lighting along with protection and adjustment for existing utility equipment. Also, facility was made for future services.

Rendel Palmer and Triton Consulting (Mar’96 - Jun’98) Project Title: Road and Maintenance in Al Ain

Role: Assistant Resident Engineer

Description: Functioned as an ARE for Al Ain Maintenance Project and Infrastructure Project Internal Roads Stage Liaised and coordinated with PWD Engineers, examined design drawings, organized coordination meetings with designers and contractor as well as suggested suitable solutions pertaining to technical problems Key role in planning, monitoring and reporting work progress to upper management, preparing technical submissions for materials, construction method, quality plan and safety plan Successfully secured clearance drawings from concerned departments Managed cutting, filling, preparation of subgrade layers and sub-base layers Administered:

Concrete Work including split ducts, future ducts, camel underpass, camel protection fence, kerbstone and tiling work Asphalt work in three layers (2 layers base course and 1 layer wearing course) Ensured timely delivery of project and handover to the client Conseco International Limited (Dec’94 - Dec’95)

Project Title: Road and Maintenance Al Ain Project Role: Senior Site Inspector

Description: Acted as a Senior Site Inspector for the Al Ain Maintenance Project and Infrastructure Project Internal Roads. Engaged in performing review of shop drawings

Played a key role in performing a wide range of tasks encompassing: Cutting, filling preparation of subgrade layers and sub-base Concrete work including Helipad bases, split ducts, future ducts Camel protection fence

Kerbstone and tiling work

Monitoring and supervising the thrust borings work under prevailing asphalt Constructing new play yards for several schools Repaving construction of Al Ain Truck Road Asphalt milling

Asphalt work

Ensured timely handover of project to the Client

General Transport Company (1990-1994)

Role: Site Engineer

Title: Internal Roads - Zakher Area in Al Ain

Period: 1994 - 1994

Project Title: Internal Roads – Al Wathba City (PWD) Period: 1992 - 1994

Project Title: Sweihan Second Carriageway (AED 210 million) Project Al Ain Role: General Supervisor

Period: 1990 - 1992



Contact this candidate