Post Job Free

Resume

Sign in

Site Engineer Power Project

Location:
Dubai, United Arab Emirates
Posted:
August 18, 2021

Contact this candidate

Resume:

PROFESSIONAL SUMMARY

Result-driven and Highly-Organized Professional with leadership skills as a strong foundation in the areas of strategic planning & execution, quality assurance, quality control, fit-out operations, project management, construction management, and team building & management. Ability in determining, and agreeing on quality procedures, and standards; assessing the needs; setting up service standards. Proven exposure of various quality assurance & control methodologies; proficiency in implementing and shaping the company’s QA/QC processes and strategies; robust technical skills, both functional and non-functional, manual and automation, ideally in a continuous delivery environment. Demonstrated exceptional capabilities in quality assurance, continuous improvement, and industry recognized best practices and risk management. Expert skills in ascertaining areas of issues & implementing changes to improve performances. Excellent interpersonal, communication and consultative skills to interact with and influence senior people in the company.

WORK EXPERIENCE

Since May 2018 with Al Ali Construction and Development (Ras Al Khaimah – UAE) as Senior Project Engineer

Key Deliverables:

Complying with relevant standards, policies, guidelines, and legislations in project completion. Determining the requirements and specifications, involving in project management and delivery.

Assuring maintenance of safety, quality, and environmental aspects of the projects. Streamlining the project operations by establishing the systems and processes. Handling the projects right from the piling stage to the internal finishing stage.

Assuring compliance with the construction drawings, approved project quality assurance plan and health & safety plan across overall construction operations.

Developing robust coordination with the client, PMC, and contractor for addressing & resolving technical queries effectively. Spearheading the vendor & material approval aspect, including material tests, and factory visits. Ensuring accordance with the specified quality in project completion for inspection, and acceptance by the client.

Streamlining the project operations through timely supply of overall materials to the site. Analyzing subcontractor performance and preparing project schedule.

Directing a cross-functional team of over 3000 workers and coordinating with the 50 subcontractors while reporting to the project manager. Major Projects:

AT Intercontinental hotel and Resort (RAK Properties) Mina Al Arab, 450 million.

TWIN TOWER 2 Tower of 20 Story (MR Properties) Al Qawasim Cornish’s, 200 million.

MovenPick Hotel and Resort (Marjan Island), 500 million.

Marbella Villa 205 no Mina Al Arab, RAK properties, Rasalkhiamah. September 2010 – May 2018 with Nael & Bin Harmal Hydro Export Est., Abu Dhabi, UAE as Project Engineer

Key Deliverables:

Entrusted with the overall accountability of planning, implementing, and overseeing construction activities of various construction projects.

Liaised with the consultant in carrying out inspection of overall operations/work.

Looked after the overall operations, ensured compliance to the schedule, and executed necessary changes with prior approval of project manager

Held responsible for documenting the construction progress daily. CORE COMPETENCIES

Strategic Planning& Execution

Quality Assurance

Quality Control

Project Management

Fit-out Works

Construction Management

Quality Inspection

QA/QC Plans & Procedures

Project Estimation

Contract Management

Stakeholder Management

Process Improvements

Operational Excellence

Team Management

Leadership Acumen

AREA OF EXPOSURE

Exhibit exceptional capabilities in

construction projects of

residential and official complexes,

steel structure works, filling

stations and pumps, infrastructure

development works, mosque, pre-

engineered steel structure sheds,

water purification plant, LPG gas

factory, waste water treatment

plant, blending plant, renovations

work, residential tower, schools,

oil field development, community

mall, hotels and resort.

Solid history in the leading major

projects pertaining to

infrastructures facilities like

pipeline, sewerages, storm water

line, potable water line, oil pipe

line, electrical cable services,

telecom cable services,

underground, mechanical

services, different filling stations,

oil terminal, checking bays,

airports, bank & restaurants

renovation, high-rise towers,

roads & bridges, infrastructure &

piping works, deep foundation &

piling works, school & college

buildings, army residential &

official cantonments, pre-

engineered steel structures

buildings & sheds, waste-water

PMP CERTIFIED SYED ZEESHAN AHMED

Mobile: 009***********, 009************ (Mob) & 009*********** (WhatsApp) Email: adn813@r.postjobfree.com

RESULT-ORIENTED Civil ENGINEER FIT-OUT ENGINEER

Offering over 18 years of experience in managing different phases of quality operations. Capable of handling multiple projects at a time with minimum supervision. Proficient in managing the Fit-out works/projects right from conception to handling over.

Noteworthy Accomplishments:

Effectively oversaw 65,000 cubic meters of concreting works across the entire project.

Resourcefully complied to the safety and quality, eliminated the occurrence of any incidents or accidents, and completed whole structural works

Accredited with an appreciation award from Al Ain municipality for the excellent project execution. Meticulously spearheaded project operations toward the completion within the stipulated time.

Played a significant role in upholding HSE requirements with high-class supervision and maintained a zero-accident policy.

Bestowed with the Best Job Performer Award from ADCO HSE twice. January 2007 – August 2010 with Civil Co. - Civil Engineering & Contracting, Abu Dhabi, UAE

Career Elevation:

Site Engineer

QA/QC Engineer

Key Deliverables:

Site Engineer

Shouldered with the entire responsibility of carrying out a site survey for assuring land levelling prior to initiation of construction operations.

Played a stellar role in interpreting the planned designs and measurements to the workers and marked the actual location on site.

Actively facilitating easy reference by formulating and upholding design documents of construction projects.

Effectively generate BBS / RFIs and escorted consultant during the inspection of works. QA / QC Engineer

Headed the QC aspect of construction project works with a QC team of inspectors, and reported the same to the QA/QC Manager.

Ensured quality by inspecting incoming materials as per applicable inspection check list and other documents. Played an instrumental role in managing inspection tasks daily distribution for the assigned QC Inspectors at the project site.

Proactively delivered inspection coverage for the various construction activities.

Liaised with the QC Inspectors in ensuring technical support and coordination to each site. Adhered to the methods statements, ITP (specifications) approved shop drawings and approved mock-ups, standards & procedures in leading inspections.

Actively participated in the monthly quality surveillance meetings for detailed discussion on agenda items and aware the project team of the potential QC problems and implementing remedial action before they become critical. Noteworthy Accomplishments:

Successfully administered and oversaw 50,000 cubic meters of concreting works during the execution of the whole project. Acknowledged the ‘best job performer’ award from ADCO in appreciation of the best performance.

Played a stellar role in casting more than 2000 cubic meters of concrete in one day. PRIOR WORK HISTORY

January 2003 – December 2006 with Ziauddin Ahmed & Company Pvt. Limited, Karachi, Pakistan as Project Engineer

(Spearheaded a team of 50 workers and reported to the Chief Operating Officer) Noteworthy Accomplishments:

Liaised with the client in finalizing the bill of approximate value of 7.5 million.

Steered & led an exhaustive audit of the bill with minor variations.

Meticulously involved in assessing and analyzing the of rate escalation with great margin and positive impact on the company.

Successfully headed multiple projects of 5 large projects right from planning through execution stages.

Played an instrumental role in finalizing 10 bills of different projects.

Efficaciously secured 2 open Bid/Tender on merit basis.

Accredited with appreciation letter and awards as compliments to the work. treatment plants, auto-parts

factory sheds, oil & gas full field

development, power

projects/substation/pumping

stations, residential villas &

bungalows, piling works, and

hotels & resorts.

EDUCATION

BE Civil Engineering, from NED

University of Engineering and

Technology, Karachi Pakistan in

2002.

H.S.C Science (Pre-Engineering),

from DJ Sindh Government Science

College, Karachi in 1998.

S.S.C Science, from Cork’s

Government Boys Secondary

School Muslimabad, Karachi in

1996.

CERTIFICATION

MS-Office (MS-Word, Excel, Power

point, Internet Browsing)

MS-Project Software and

Primavera certified (Knowledge)

PMP Training Certification course

AutoCAD (2D) certified from

Autodesk

HSE- PTW Certified from Abu

Dhabi, for Oil & Gas Division.

High HSE Job performance

Certificate from ADCO, Abu Dhabi

UAE

RAK Municipality certified G+4 and

G+8 approved

PMP Certified

TECHNICAL PROFICIENCY

Well-versed with the Microsoft

office, STAAD Pro, PCA-Col, Etab,

and Internet browsing.

PERSONAL DOSSIER

Date of Birth: 13th December 1979

Linguistic Abilities: English, Hindi,

Urdu, and Arabic.

Nationality: Pakistani.

Visa Status: Residence

Location Preference: UAE

Driving License: UAE

RAK Municipality Approved:

G+1, G+4 and G+8 Approved

ANNEXURE - MAJOR PROJECTS HANDLED

PAKISTAN

Project Construction Of Retail Outlet Petrol Pump Station 3 Nos Duration 2 Years

Client (PSO, SHELL, TOTAL PARCO, CALTEX) KARACHI, PAKISTAN Value Pak Rs.20 MILLION

Scope Construction of petrol pump station including civil / electrical / mechanical works and completing the project, testing, commissioning and handover Consists of kisoks, steel canopy, Tyre shop, mart, UGWT, underground fuel tank, Pasco work, and signage work.

Role Team Leader / Site Engineer/Office Engineer

Responsibilities Visit site, prepare BOQ / report / approving subcontractor bills/ conduct audit with client / coordination of all the activities/ material order / site execution as per drawing, testing and commissioning.

Construction of:

Different checking bay at 5 locations for PSO (Client: PSO Karachi) Different Filling Station

Loading bay / gantry at PSO oil depot, Zot Karachi (Client: PSO Karachi) Fire escape staircase at PSO house, Karachi (Client: PSO Karachi) Construction of blending plant (Pre-Engineered steel structure) for PSO (Client: PSO Karachi)

Mega zoom sign hoarding board for PSO(Client: PSO Karachi) External development work at Agha Khan hospital (Client: Agha Khan Hospital) Construction of mosque

Construction of pre-engineered steel structure from (Mammut Dubai) for Toyota Indus Motors (Client: Toyota Motors Indus, Karachi) Construction of pre-engineered steel structure from (Mammut, Dubai) for Alsons Auto Parts factory (Client: Alsons Auto Part Factory) External development work and road work for Toyota Indus Motors and Alsons Auto Parts factory (Client: Toyota Motors Indus Karachi & Alsons Auto Part Factory)

Construction of LPG gas factory

Construction of boundary wall, residential, official, and barrack’s for army cantonments (Client: CWO Army Cantonment Hyderabad, Karachi) Waste water treatment plant and factory building for Soorty textile mills

(B+G+3 floors) (Client: Soorty Textile Mill, Karachi) Renovation works for KFC, Faysal Bank and United Bank. (Client: KFC, Karachi, UBL Bank, Karachi, Faysal Bank, Karachi)

Construction of cubicle for MTC (Maritime Technology Complex Dockyard)

(Client: Port Qasim Authority Karachi & Pakistan Navy) Construction of water purification plant (pre - engineered structure) for Nestle Pakistan (Client: Nestle Pakistan)

Duration 2 Years

Value Pak Rs. 255 million

Scope Re-engineered steel structure from Mammut and Zamil used to build blending plant.

Specialized mechanical jobs, pipe line and pipe sleeper erection, fully steel structure used to build checking bays.

Hot dip galvanised steel structure used for fire escape staircase. Piling work used as foundation for hoarding sign board. Heavy foundation, big sheds, asphalt work, large industrial flooring, water structure, retaining walls, huge tank installation, huge underground tanks, decorative works, specialized cubicles and raised flooring, heavy machine. Role Team Leader / Site Engineer

Responsibilities Visit site, prepare BOQ / report / approving subcontractor bill/ conducting audit with client / coordination of all the activities/ material order / site execution as per drawing / testing and commissioning. UAE

Projects Centrium Residential Tower, cluster of 4 tower 30 Storey 2B + G + Podium+ 30 Floors Kindergarten School, Ground Floor

Duration 24 Months

Clients ETA Star Property and Developer, Dubai UAE Tecom Property Mussanada, Abudhabu, Alain UAE

Value AED. 400 Million

Scope Construction of tower comprises of pile cap and raft foundation, columns, core wall shear wall basement,

post tension slab, staircase with lift facility, podium on 2nd floor, water feature kid pool, adult pool, jaccuzy, 4 floor car parking, centralized ac system, GRP water tank on roof and basement, high epoxy

Flooring

Role Site Engineer / QA, QC Engineer

Responsibilities Execute site activity, follow up with subcontractor, arrange concrete, BBS preparation, finishing works, Handling labor, inspection with consultant, daily work progress, and coordinate with MEP contractor, quality control, BOQ, cost making.

Projects Infrastructure works for Different types of residential and commercial area in GAREEBA, Alain, UAE, mainly sewerages lines, pipe lines, water supply line, electrical cables lines.

Abudhabi on Shore Oil Operation Development of Full Oil Field at Asab. Al Seef Community Mall and Carrefour Market B+G+1+Roof. Jannah Hotels and Resort Apartment Hotel 130 NO.

Al Shuaibah Residential Complex 162-Villa G+1 + Service Bldg. Infrastructure works for Different types of residential and commercial area for Dubai Police, Dubai Umm Damn, UAE, mainly sewerages lines, pipe lines, water supply line, electrical cables lines, Road works, pump house, Detention Pond, Telecom room, fencing work.

Duration 4 years

Clients Al Ain Municipality

Mussanada Abudhabi, Alain

Sheikh Sultan Bin Tahnoon

ADCO

Dubai Police Merras

Value AED. 1450 Million

Scope Infrastructure work for the residential units, all sewerage lines with man whole, potable water lines, and storm water system.

ADCO power project comprises of 5 substation control rooms building, service building, gate house road work and Pasco work.

AL SEEF mall comprises of luxury mall, fit out shop, restaurant, gym, food court, and basement.

Jannah hotel and resort comprises of 130 hotel apartments, reception building, swimming pool and external pavement work, and Wall paper. Al Shuaibah residential complex comprises of 162 villas G +1 + service building, infrastructure works, road, drainage, water supply, storm water, 5 bed room with lady and men Majlis, kitchen, maid room laundry room, electrical room, driver room and garden.

Role Project Engineer

Responsibilities Drawing preparation

Site execution

Arrangement of material

Inspection with consultant

Coordination with subcontractor

Handle manpower

Resolve technical issues

BBS preparation

Handle quality issues



Contact this candidate