Name

WILLIAM H. JOCO

Present Position

Lead QA/QC Engineer

Employee No

1074

Age

** ***** ***

Date of Birth

October 4, 1960

Status

Married

Sex

Male

Nationality

Filipino

Finished Degree

Bachelor of Science in Mechanical Engineering

School Graduated

Qualification

University of Santo Tomas

Certified Welding Engineer (Welding Coordination Personnel)

By Philippine Welding Society and Japan Welding Engineering Society

Certificate number: PWS-JWES-12-0119-16 Valid Until July 13, 2022

RT Film interpretation LEVEL II

Cert. number NDT-RFIC-002 Issued Sept 9, 2019 Valid Until Sept 5, 2024

Total Years of Experience

30 years

Contact number +639*********

Email address adn0vw@r.postjobfree.com

COMPANY: JGC PHILIPPINES, INC. – QHSE Department

A. Corporate Position : LEAD QA/QC ENGINEER/ WELDING ENGINEER

B. Business Address : JGC PHIL. BLDG 2109 Prime St. Madrigal Business Park, Ayala, Alabang, Muntinlupa City

C. Date Hired : JULY 3, 2000 up to July 10, 2020

JOB DESCRIPTION

1.Establishes QA/QC policy and procedures in cooperation with engineering group, to ensure that the applicable QA/QC related project requirement will be specified and implemented.

2.Manages the QMD related activities during project proposals, i.e. ITB review, manhour estimation, manpower mobilization plan and proposal narratives.

3.Manages the QMD related activities in the project execution in Home office and construction Sites.

4.Conduct Pre-inspection meeting for each category of work, clarify the inspection policy of client and JPHIL, and set up among vendors/subcontractors to ensure workable project quality system

5.Monitors and controls inspector’s quality activities to confirm that they comply with the specified procedures to achieve quality.

6.Adheres to “Code of Discipline”, “Compliance Code of Business Ethics and Conduct”.

7.Performs other task that may be assigned by immediate superior from time to time.

8.Assist the function of QMD Manager

9.Acts as Project Quality Control Manager or Field Quality Control Manager for large project.

10.Support CMS internal External Audit.

11.Manages Project Internal and External Quality Audit.

12.Prepare Inspection and Test Plan (Quality Control) for various projects

13.Review Quality Control Procedures submitted by sub-Contractor for various projects.

14.Prepare Quality Control Specification for various projects.

15.Review QC/NDT personnel qualification for various projects.

16.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR)

VARIOUS PROJECTS WITH JGC PHILIPPINES, INC.

COMPANY : JGC PHILIPPINES

A. Job Position : Project Quality Control Manager

B. Project : Chromite Recovery Plant

C. Location : Surigao del Norte, Philippines

D. Plant Owner : THPAL

E. Duration : May 2019 to July 2020

JOB DESCRIPTION:

1.Responsible for supervision of Project Quality Control activities and coordinate project quality control efforts to ensure the desired results obtained.

2.Attend to Kick off meeting and discuss to vendor the quality control Project requirement.

3.Hold Pre-inspection meeting with vendor and discuss quality control project requirement prior to start of fabrication.

4.Review Vendor /Supplier Inspection and Test Plan (ITP) for equipment and materials.

5.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR)

6.Assure Vendor ITP define the extent of owner and applicable government agency involvement in all inspection and test activities.

7.Review and approve inspection and testing procedure submitted by Vendor/ supplier as appropriate.

8.Appoint Inspector who verifies the result of the inspection and testing carried out by Vendor/Supplier.

9.Prior to issuance of IRC, assure all the works as agreed in Purchase Order are completed except approval of MDR by Vendor/Supplier, all test and inspection are satisfactorily completed and passed, all punch list items are closed except previously contactor agreed carry-over work to Construction site.

10.Assure Non- conformities are identified and documented on equipment and /or materials and relevant to Vendor and subcontractor services during procurement and construction phases shall be controlled and documented in accordance with Project Nonconformity control procedure for vendor and subcontractor.

COMPANY : JGC PHILIPPINES

A. Job Position : Field Quality Control Manager

B. Project : Chromite Recovery Plant

C. Location : Surigao del Norte, Philippines

D. Plant Owner : THPAL

E. Duration : Feb. 2019 to April 2019

JOB DESCRIPTION

1.Responsible for supervision of field Quality Control activities and shall coordinate project quality control efforts to ensure the desired results obtained.

2.Review inspection/test procedures for each category work prepared by the subcontractors. Attend to inspection/test with client.

3.Verify inspection documentation and test results performed by engineers or inspectors.

4.Hold regular meeting with client on quality aspects

5.Hold Special Inspection Meeting between client and JGC Phils. to address problems regarding inspection and quality control activities.

6.Conducts Kick-off meeting for each discipline between Client and JPHIL inspectors/engineers of the discipline to review inspection policy and procedures and discuss detailed procedures including inspection items to be witnessed by client.

7.Witness qualification test of welders and welding procedures and determines the validity in accordance with regulations, codes, specifications and procedures. Arrange daily inspection schedule.

8.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR)

9.Sets up and control documentations, filing system for all documents pertaining to inspection and quality control.

10.Monitor engineers, inspection and quality control activities to ensure conformance to QA/QC requirements and specified procedure.

11.Hold Quality Control Meeting between JPHIL and subcontractor to emphasize procedures, progress or other inspection and test matters.

12.Insure timely resolution of any QC problem encountered during construction.

13.Supervise field radiography and coordinating the schedule of related works such as piping, heaters and tank construction.

14.Assist safety group in maintaining safety operation in welding and radiography.

15.Evaluates and classifies each welder’s performance by periodical examination of radiographs on production welds.

16.Ensure calibration of inspection, test and measuring equipment.

17.Clarify nonconformity whether major or minor, reviews disposition of the nonconformity, recommends disposition to Field Engineering Manager and Construction Manager for their approval, and approves corrective action for minor conformity.

COMPANY : JGC Philippines

A. Job Position : Field Quality Control Manager/Welding Engineer

B. Project : LOBP

C. Location : North Harbour, Manila, Philippines

D. Plant Owner : PETRON

E. Duration : May 2017 to Jan. 2019

JOB DESCRIPTION:

1. Responsible for supervision of Field Quality Control activities and shall coordinate project quality control efforts to

ensure the desired results obtained.

2. Review inspection/test procedures for each category work prepared by the subcontractors. Attend to inspection/test

with client.

3. Verify inspection documentation and test results performed by engineers or inspectors.

4. Hold regular meeting with client on quality aspects

5. Hold Special Inspection Meeting between client and JGC Phils. to address problems regarding inspection and

quality control activities.

6. Conducts Kick-off meeting for each discipline between Client and JPHIL inspectors/engineers of the discipline to

review inspection policy and procedures and discuss detailed procedures including inspection items to be witnessed

by client.

7. Witness qualification test of welders and welding procedures and determines the validity in accordance with

regulations, codes, specifications and procedures. Arrange daily inspection schedule.

8. Sets up and control documentations, filing system for all documents pertaining to inspection and quality control.

9. Monitor engineers, inspection and quality control activities to ensure conformance to QA/QC requirements and

specified procedure.

10. Hold Quality Control Meeting between JPHIL and subcontractor to emphasize procedures, progress or other

inspection and test matters.

11. Insure timely resolution of any QC problem encountered during construction.

12. Supervise field radiography and coordinating the schedule of related works such as piping, heaters and tank

construction.

13. Assist safety group in maintaining safety operation in welding and radiography.

14. Evaluates and classifies each welder’s performance by periodical examination of radiographs on production welds.

15. Ensure calibration of inspection, test and measuring equipment.

16. Clarify nonconformity whether major or minor, reviews disposition of the nonconformity, recommends disposition

to Field Engineering Manager and Construction Manager for their approval and approves corrective action for

minor conformity.

17.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR)

COMPANY : JGC Corporation

A. Job Position : Piping /Welding Inspector/ Welding Engineer

B. Project : SRC MOGAS COGEN

C. Location : Jurong Island Singapore

D. Plant Owner : Singapore Refining Company

E. Duration : Sept 2015 to Feb 2017

JOB DESCRIPTION:

1.Monitor actual execution of change in the work by design change issued.

2.Arranges daily inspection program and hold it available for client inspection as required.

3.Compiles report and submit to Field QC Manager.

4.Keep all documents on inspection and quality at field office.

5.Watch and controls activities implemented by Sub contractor’s inspectors.

6.Checks and review inspection reports and submits to FQCM.

7.Monitor and control welding activities through CMS (Construction Management System)

8.Assure minimum NDT requirement is met.

9.See to it that NDT personnel are qualified per SNT-TC-1A.

10.Witness welder qualification test

11.Review of welder’s qualification record and witness

12.Welder qualification test.

13.Witness hydrostatic testing and pneumatic test

14.Coordinate with government (MOM) Inspector for high pressure Steam line Inspection.

15.Review of test packages

16.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR).

17.Monitor and controls construction supervisor and inspector’s quality activities to confirm that they comply with the specified procedures.

COMPANY : JGC Corporation

A. Job Position : Piping/Welding inspector/Welding Engineer

B. Project : SHDS

C. Location : Jurong Island Singapore

D. Plant Owner : EXXON Mobil

E. Duration : March 2013 to Dec, 2014

JOB DESCRIPTION:

1.Prepare documents required for implementing quality control

2.Assure sub-contractor is using the latest approved drawings and specification.

3.Monitor actual execution of change in the work by design change issued

4.Compiles report and submit to Shop QC Supervisor.

5.Keep all documents on inspection and quality at field office.

6.Watch and control activities implemented by sub-contractor inspectors.

7.Checks and review inspection reports and submits to Shop QC Supervisor.

8.Monitor and control welding activities through CMS (Construction Management System)

9.Assure minimum NDT requirement is met prior to spool delivery to construction site.

10.Monitor pipe spools movement using CMS.

11.See to it that NDT personnel are qualified per SNT-TC-1A.

12.Review of welder’s qualification record and witness welder qualification test.

13.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR)

14.Interpret/Evaluate radiographic film.

15.Witness NDT test i.e. MPI, DPT, UT, etc.

16.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR).

17.Review Post weld Heat Treatment chart.

18.Coordinate with government (MOM) Inspector for high pressure Steam line Inspections.

19.Monitor and controls construction supervisor and inspector’s quality activities to confirm that they comply with the specified procedures.

20.Approve final inspection records by signing them. Assure documents are complete prior to handover to client

COMPANY : JGC Philippines

A. Job Position : Lead QC Inspector

B. Project : TJCP (Taganito JGC-Chiyoda Joint Venture)

C. Location : Taganito Claver Surigao del Norte, Philippines

D. Plant Owner : THPAL

E. Duration : August 2011 to Dec, 2013

JOB DESCRIPTION:

1.Responsible for welding, piping tank/thickeners and equipment quality issue

2.Hold regular quality control meeting with sub-contractor

3.Conduct piping /welding inspection in compliance with project requirements.

4.Conduct tank/thickener inspection in compliance with project requirements.

5.Conduct equipment (static, rotary, package) installation in accordance with project requirements.

6.Witness welder qualification test.

7.Review inspection reports prior to submission to client.

8.Assure all inspection items/documents according to ITP are complete prior to pressure testing.

9.See to it that all punchlist (category A) are cleared prior to pressure testing.

10.Assure all NDT requirements line class wise and welder wise are met.

11.Review completeness of test package prior to hydro testing

12.Review of welder qualification test record.

13.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR)

14.See to it all welders are qualified according to project requirement.

15.Assign quality control inspectors for all areas.

16.Monitor subcontractor’s quality control activities.

17.Report tp FQCM all non-compliance activities.

COMPANY : JGC/KBR (JK Joint Venture)

A. Job Position : Piping QC Inspector

B. Project : Pearl GTL Project Ras Laffan, Qatar

C. Location : Ras Laffan Qatar

D. Plant Owner : Shell

E. Duration : February 7, 2008 to Dec. 31, 2009

JOB DESCRIPTION:

1.Monitor actual execution of change in the work by design change issued.

2.Arranges daily inspection program and hold it available for client inspection as required.

3.Compiles report and submit to Field QC Manager.

4.Keep all documents on inspection and quality at field office.

5.Watch and controls activities implemented by Sub contractor’s inspectors.

6.Checks and review inspection reports and submits to FQCM.

7.Monitor and control welding activities through CMS (Construction Management System)

8.Assure minimum NDT requirement is met.

9.See to it that NDT personnel are qualified per SNT-TC-1A.

10.Witness welder qualification test

11.Review of welder’s qualification record and witness

12.Welder qualification test.

13.Witness hydrostatic testing and pneumatic test

14.Review of test packages

15.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR).

16.Monitor and controls construction supervisor and inspector’s quality activities to confirm that they comply with the specified procedures.

COMPANY: JGC CORPORATION

A. Job Position : PIPING/WELDING INSPECTOR

B. Project : LSDP

C. Location : KINGDOM OF BAHRAIN

D. Plant Owner : BAPCO

E. DURATION : JAN. 2006 – AUG. 2007

JOB DESCRIPTION

1.Monitor actual execution of change in the work by design change issued

2.Arranges daily inspection program and hold it available for client inspection as required.

3.Compiles report and submit to Filed QC Manager.

4.Keep all documents on inspection and quality at field office.

5.Watch and controls activities implemented by

6.Sub contractor’s inspectors.

7.Checks and review inspection reports and submits to FQCM.

8.Monitor and control welding activities through CMS (Construction Management System)

9.Assure minimum NDT requirement is met.

10.See to it that NDT personnel are qualified per SNT-TC-1A.

11.Witness welder qualification test

12.Review of welder’s qualification record and witness

13.Welder qualification test.

14.Witness hydrostatic testing and pneumatic test

15.Review of test packages

16.Interpret/Evaluate radiographic film.

17.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR).

18.Monitor and controls construction supervisor and inspector’s quality activities to confirm that they comply with the specified procedures.

19.Conduct Positive Material Identifications Test and UT Thickness Gauging of various equipments, vessel internals, welding and piping materials

20. Review final inspection records.

21. Assure documents are complete prior to handover to client.

COMPANY: JGC CORPORATION

A. Job Position : PROJECT QC ENGINEER

B. Project : DOLPHIN PROJECT

C. Location : YOKOHAMA. JAPAN

D. Plant Owner : DOLPHIN ENERGY

E. DURATION : JAN. 2004 – DEC. 2005

JOB DESCRIPTION

1.Review vendor Quality Control Documents

2.Attend vendor Clarification and Kick-off Meeting discuss quality control and client requirements

3.Preside Pre-inspection Meeting at vendor shop

4.Review all relevant documents are duly approved prior to fabrication

5.Monitor P.O. fabrication status

6.Assign Inspector to attend to various inspection which requires JGC/Client attendance and monitor fabrication inspection activities

7.Arrange inspection with Third Party whenever their attendance is needed

8.Provide latest drawing, procedures and other pertinent documents to JGC Satellite offices

9.Review shop inspector’s report and give copy to concern person and discipline for comments

10.Assure that approved Inspection and Test Plan is being implemented by vendor during fabrication.

11.Coordinate with client regarding inspections which requires Client’s attendance

12.Coordinate with concern discipline engineer concerning ordered equipment status

13.Periodic coordination with JGC Satellite office concerning fabrication status

14.Assure that all necessary inspections according ITP were conducted, and all related documents reviewed before releasing the equipment for shipment

15.Review vendor’s Manufacturing Data Record

COMPANY: JGC PHILIPPINES, INC.

A. Job Position : Field Quality Control Manager

B. Project : PETRON CNU / EEP PROJECT

C. Location : PETRON BATAAN REFINERY

D. Plant Owner : PETRON

E. DURATION : AUGUST 12, 2002 – DEC. 2003

JOB DESCRIPTION:

1.Responsible for supervision of field Quality Control activities and shall coordinate project quality control efforts

to ensure the desired results obtained.

2. Review inspection/test procedures for each category work prepared by the subcontractors. Attend to inspection/test

with client.

3. Verify inspection documentation and test results performed by engineers or inspectors.

4. Hold regular meeting with client on quality aspects

5. Hold Special Inspection Meeting between client and JGC Phils. to address problems regarding inspection and

quality control activities.

6. Conducts Kick-off meeting for each discipline between Client and JPHIL inspectors/engineers of the discipline to

review inspection policy and procedures and discuss detailed procedures including inspection items to be witnessed

by client.

7. Witness qualification test of welders and welding procedures and determines the validity in accordance with

regulations, codes, specifications and procedures. Arrange daily inspection schedule.

8. Sets up and control documentations, filing system for all documents pertaining to inspection and quality control.

9. Monitor engineers, inspection and quality control activities to ensure conformance to QA/QC requirements and

specified procedure.

10. Hold Quality Control Meeting between JPHIL and subcontractor to emphasize procedures, progress or other

inspection and test matters.

11. Insure timely resolution of any QC problem encountered during construction.

12. Supervise field radiography and coordinating the schedule of related works such as piping, heaters and tank

construction.

13. Assist safety group in maintaining safety operation in welding and radiography.

14. Evaluates and classifies each welder’s performance by periodical examination of radiographs on production welds.

15. Ensure calibration of inspection, test and measuring equipment.

16. Clarify nonconformity whether major or minor, reviews disposition of the nonconformity, recommends disposition

to Field Engineering Manager and Construction Manager for their approval and approves corrective action for

minor conformity.

COMPANY: JGC/INITEC

A. Job Position : QC ENGINEER

B. Project : OURHOUD PROJECT

C. Location : FABRICATION SHOP, HASSI MESSAOUD, ALGERIA

D. Plant Owner : SONATRAC

E. Duration : DEC. 2, 2001 – MAY 31, 2002

JOB DESCRIPTION

1.Prepare documents required for implementing quality control

2.Assure sub-contractor is using the latest approved drawings and specification.

3.Monitor actual execution of change in the work by design change issued

4.Compiles report and submit to Shop QC Supervisor.

5.Keep all documents on inspection and quality at field office.

6.Watch and control activities implemented by sub-contractor inspectors.

7.Checks and review inspection reports and submits to Shop QC Supervisor.

8.Monitor and control welding activities through CMS (Construction Management System)

9.Assure minimum NDT requirement is met prior to spool delivery to construction site.

10.Monitor pipe spools movement using CMS.

11.See to it that NDT personnel are qualified per SNT-TC-1A.

12.Review of welder’s qualification record and witness welder qualification test.

13.Interpret/Evaluate radiographic film.

14.Witness NDT test i.e. MPI, DPT, UT, etc.

15.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR).

16.Review Post weld Heat Treatment chart.

17.Monitor and controls construction supervisor and inspector’s quality activities to confirm that they comply with the specified procedures.

18.Approve final inspection records by signing them.

19.Assure documents are complete prior to handover to client.

COMPANY: JGC PHILIPPINES, INC.

A. Job Position : QC ENGINEER

B: Project : BAPCO KMP

C. Location : BAHRAIN

D. Plant Owner : BAPCO

E. Duration : FEB. 14, 2001 – AUG. 30, 2001

JOB DESCRIPTION

1.Prepare all formats for report and control.

2.Prepare documents required for implementing quality control.

3.Assure sub-contractor is using the latest approved drawings and specification.

4.Monitor actual execution of change in the work by design change issued

5.Arranges daily inspection program and hold it available for client inspection as required.

6.Compiles report and submit to Filed QC Manager.

7.Keep all documents on inspection and quality at field office.

8.Watch and controls activities implemented by inspectors.

9.Checks and review inspection reports and submits to FQCM.

10.Conducts pre-inspection meetings prior to starting inspection activities for each category of work, to clarify the inspection policy of client and JPHIL, and set it up among subcontractors.

11.Monitor and control welding activities through CMS (Construction Management System)

12.Assure minimum NDT requirement is met.

13.See to it that NDT personnel are qualified per SNT-TC-1A.

14.Review of welder’s qualification record and witness welder qualification test.

15.Interpret/Evaluate radiographic film.

16.Witness NDT test i.e. MPI, DPT, UT, etc.

17.Review of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR).

18.Monitor and controls construction supervisor and inspector’s quality activities to confirm that they comply with the specified procedures.

19.Approve final inspection records by signing them.

20.Assure documents are complete prior to handover to client.

COMPANY: NIKFILL CONS. CO. INC.

A. Job Position: QC SUPERVISOR

B: Project : BPC PROJECT

C. Location : MARIVELES, BATAAN

D. Plant Owner : BPC

E. Duration :AUG. 3, ‘98 – JUNE 15, ‘00

JOB DESCRIPTION

1.Arranges daily inspection schedule and hold it made available for client use as required.

2.Monitor and control activities implemented by (sub-contractors) inspectors.

3.Confirm whether sub-contractors use the specifications and drawings of latest revision.

4.Monitor actual execution of change in the work by design change issued.

5.Inspect equipment and piping installation according to applicable drawings and specifications.

6.Conduct welding inspection for piping, tanks, silos, steel structures, and others.

7.Witness welder qualification test.

8.Check material identification of piping

9.Conduct equipment-receiving inspection.

10. Ensure correct electrode handling.

11.Monitor welding activities through CMS to provide information such as welder performance, NDT performance report, inspection status report, daily welding report, and NDT rate by line class, repair status, and other important information for accurate monitoring.

12. Interpret radiographic films according to applicable codes.

13. Monitoring of repair (by RT) status.

14. Monitor welder penalty status.

15.Witnessing of flange and shaft alignment for rotating Equipment.

16.Review test packages to conform to specification and client requirements.

17.Conduct welding line check and punch listing to satisfy specification and client requirements.

18.Witnessing of hydrostatic test, pneumatic test, flushing, air blowing and another test.

19.Observe and implement general safety practices at site.

20.Check and review inspection reports for client’s approval.

OTHER COMPANIES INVOLVED

COMPANY : HYUNDAI ENGG & CONS.

A. Job Position : MECHANICAL QC ENGR.

B: Project : HNF PROJECT

C. Location : RAS LANUF LIBYA

D. Plant Owner : RASCO

E. Duration : NOV. 10, ‘96 – MAR. 15, ‘98

JOB DESCRIPTION

1.Conduct inspection as per approved Inspection and Test Plan (ITP).

2.Work to commence as per approved Work Plan Procedure (WPP).

3.Assure all equipments are installed according to approved procedure or vendor’s procedure.

4.Check equipment layout to conform to the design drawing.

5.Verify that equipments are installed completely according to vendor’s drawing.

6.Monitor equipment installation status.

7.Monitor welding activities.

8.Assure WPS/welder are qualified in accordance with the requirement of ASME IX prior to commencing of welding activities.

9.Witness welder qualification test.

10.Prepare welder qualification record

11.Conduct welding inspection and piping dimensional check.

12.Conduct fit-up inspection prior to welding.

13.Assure minimum NDT project requirement.

14.Verify spool and in-line valves are installed according to drawing.

15.Prepare punch-list items.

16.Witness hydrostatic test, leak test, flushing, air blowing and other test.

17.Prepare documentation for client’s approval.

COMPANY: ABB SAE SADELMI

A. Job Position: QC WELDING INSPECTOR

B: Project : AL-TAWEELAH POWER & DESALINATION STAGE “B”

C. Location : SHAHAMA, ABU DHABI, UAE

D. Plant Owner: W. E. D.

E. Duration : OCT. 9, ’94 – MAR. 15, ‘96

JOB DESCRIPTION

1.Ensure a continuous survey of erection activities to achieve quality requirement with reference to quality control plan and construction programs.

2.Witness level, dimension, slope, spacing and alignment check of evaporator/module block to block joint for desaltor assembly.

3.Inspect and monitor all welding activities before, during and after welding on boiler, desalination piping and module internal/external welding works. Internal works include cladding restoration of evaporator block joints, water box, and interconnecting pipe joints

4.Witness NDT activities in accordance with project specification and applicable codes.

5.Verify and check tubing materials, commence dimensional inspection and monitor tubing activities such as inserting, expanding, cutting/trimming and flaring on each stage to conform to specification.

6.Witness/coordinate pressure testing of completed boiler, desalination piping shell side and interconnecting water boxes.

7.Conduct final inspection with owner/Consultant/ Representative in the completeness of piping system, module welding cladding and internal surface preparation of module prior to tubing activities.

8.Prepare and submit all documents for owner review and acceptance.

COMPANY : JGC CORPORATION

A. Job Position: WELDING INSPECTOR

B: Project : NNPC ELEME PETROCHEM

C. Location : RIVERS STATE NIGERIA

D. Plant Owner: NNPC

E. Duration : JAN, ’93 – APRIL ‘94

JOB DESCRIPTION

1.Ensure implementation of welding procedure specifications.

2.Assure works and material conforms to project specification and procedure.

3.Monitor daily welding accomplishment.

4.Monitor welder accomplishments and performances.

5.Assure minimum NDT requirement is met.

6.Qualify welder in accordance with ASME IX.

7.Interpret-evaluate radiographic films.

8.Verify all materials used in NDT comply with applicable code requirements.

9.Verify correct dimension and length of sub-assemblies, also includes wall thickness, bevel angle, alignment, fit-up, root gap cleanliness and other to be completed prior to welding and installation.

10. Assure punch items are cleared prior to pressure testing.

11. Witness hydro test, pneumatic test, flushing, air blowing and other test.

12. Prepare documents for client’s approval.

COMPANY: P.T. BIXINDO UTAMA

A. Job Position: NDT TECHNICIAN

B: Project: (VARIOUS PROJECTS)

C. Location: BATAM ISLAND INDONESIA

D. Plant Owner: P.T. MCDERMOTT INDONESIA

E. Duration: NOV. ’91 – NOV. 92

JOB DESCRIPTION

1.Conduct MT and PT level II category inspection on Woodside Goodwyn “A” 17,000 tons sub-structure jacket.

2.Perform final visual inspection prior NDT inspection.

3.Assure surface condition, weld size, etc. are met as per specification.

4.Recommend repair/rework for defective welding.

5.Assure arc strikes are totally eliminated.

6.Prepare reports and