RESUME OF IYYAPPAN.R
IYYAPPAN.R Aravanam pettai,
Email : adlurw@r.postjobfree.com, Manavasi post, Karur dist,
Mobile-984*******
To Work in a challenging atmosphere, to put use my theoretical knowledge your esteem organization and give you are the best output. Technical Qualification : Diploma in Electrical & Electronics Engineering Percentage : 68 %
Institution : MPMNJ Polytechnic College, Chennimalai. Year of Passing : April-2003
MS-Office & CAD
Diploma in Computer Application
Making Notification Using SAP
Team Work
Electrical āCā License Holder
Transformer erection Work (750KVA&1000KVA)
1) One year worked in M/s. Saroja Madurai Electricals as a supervisor from 02.02.04 to 07.02.05.
RESPONSIBILITY:
HT Laying Supervision
Building Wiring Supervision
PROFESSIONAL SNAPSHOT
EDUCATION QUALIFICATION
SOFTWARE EXPOSURE
EXTRA CURRICULAR ACTIVITIES
WORK EXPERIENCE (15 YEARS)
RESUME OF IYYAPPAN.R
Panel to Generator wiring and maintenance Supervisor.
Panel Wiring
Generator Operator
Stabilizer Wiring
Stabilizer Sub-Assembling work
PCB Maintenance
Stabilizer Testing
2) I Have Completed My Apprentice (Govt.) in M/s Power cap Systems
(Madras) Pvt. Ltd, from 14.02.05 to 13.02.06.
RESPONSIBILITY:
Machine / Equipment Wiring.
Rectify the faults
Network Cable Laying / Maintenance
Burglar Alarm Wiring Done for entire factory
UPS Wiring.
Transformer testing & Assembling Work
3) One year worked in M/s. Consul Consolidated Pvt. Ltd. from 15.04.06 to 21.05.07.
RESPONSIBILITY:
Stabilizer Testing & Wiring.
Variac sub assembling.
Assembling Work.
4)Suzlon Energy LTD
I have worked In Operation and maintenance in wind turbines (600kw & 1250kw) in Suzlon Energy Ltd for July-2007 to April 2014 Suzlon Energy Ltd.
1. Maintaining machine Availability Above 98%
The wind turbine status monitored in CMS and improves the running hours, if any deviation occurred that will solve immediately. Preparing maintenance schedule and do it with in that period. Role: Rectify the deviation.
RESUME OF IYYAPPAN.R
2. Failure mode analysis
When the break down occurred, the root cause will find by analyzing the program me and DIO feedback, after that needed design and testing will conduct.
Role: Requirement analysis, Design, Development and testing 3. Other responsibilities Undertaken
Making Notification using SAP
Attending Customer and clearing their doubts
Preparing weekly and monthly reports
5. Azure power India Pvt Ltd
I. Operation and Maintenance in Solar Field (600kw & 10MW) in Azure power Pvt Ltd for April 2014 to till Date
Solar plant maintenance and Break down attending work.
Daily Reporting work.
Preparing maintenance schedule and do it with in that period.
Half yearly Maintenance.
Yearly maintenance
Fathers Name : V. Ramaswamy
Date of birth : 05/03/1984
Gender : Male
Nationality : Indian
Marital Status : Married
Languages Known : Tamil, English, Hindi.
I hereby declare that the information furnished above is correct to the best of my knowledge.
Place : Yours Sincerely
Date : (R.IYYAPPAN)
PERSONAL DETAILS
DECLARATION