Post Job Free

Resume

Sign in

Engineer Piping

Location:
Hyderabad, Telangana, India
Posted:
April 10, 2021

Contact this candidate

Resume:

KRISHNA KISHOR G

Mobile No: +91-880*******

Email: adlkjb@r.postjobfree.com

CAREER SUMMARY

My professional experience primarily focuses on construction management for Oil, Gas and Petro chemical plants.

Qualified technical Team leader having more than 14 years of experience in major oil, gas and utilities projects in Middle East Countries and India. Possess practical and hands on experience in all aspects of mechanical construction works including piping, welding, fabrication, pump packages, blowers, heat exchangers, Tank construction, Vessels, Pipeline Pigging & Drying activity associated piping systems, Fire Fighting systems, Foam skids etc. - in industries such as Oil & Gas, Petro-chemicals, Refineries & Power plant.

Highly organized and dedicated with a positive attitude.

Self-motivated, able to set effective priorities and handle multiple assignments under high pressure within tight deadlines; adapt easily to new concepts and responsibilities.

WORK EXPERIENCE (15+ YEARS)

Area Construction Manager, Sep 2018 – Nov 2020

Company Name : JGC Construction International Pte. Ltd.

Deputation to JGC GULF International Ltd.

Project Name : Enhancement of Fire Protection Project (EFPS)

Description : An EPC project for upgrading existing Fire water network for the Entire Refinery and

Tank Farm

Client Name : Bahrain Petroleum Company (BAPCO)

Location : Bahrain

Roles and Responsibilities

Preparation construction schedule in line with master schedule

Co-ordination between management, Execution staff and subcontractor

Managing resources for optimum utilization

Achieve construction milestones

Ensure safety at Worksites and Maintain “Accident Free Site”

Responsibilities for systematic planning the job, to enable timely mobilization of resources men, material and machinery

Resolving field problems and liaison client under the supervision of Mech. Eng. and process Depts

Prepare site instruction to the subcontractor to perform the additional construction activities which has risen due to the design errors and additional requirements by the Client

To give suitable instructions for make field routings in order to solve the engineering solutions as per site condition

Coordinate to Area manager and Safety Supervisor for unloading and loading of all incoming and outgoing deliveries

Conduct daily and weekly progress meeting to discuss all site issues including upcoming requirements

Receiving the approved drawing for fabrication and preparing the fabrication schedule according to priority

Fabrication supervision and erection of structure, Pipelines, Fire Hydrants, Fire Monitors, Foam skids and Fire water pumps

Prepare Hydrotest packages and coordinate for the approval of the hydro-test packages. Monitoring of Hydrotesting activities

Take corrective action to clear all the piping& Equipment related punch lists and co-ordinate with the subcontractor and the Client till closing the punch lists

Taking lead for the shutdown jobs on running plant

Coordinate with the subcontractor to complete the re-instatement test packages in order to complete the mechanical completion

Coordinate with Client to get approval for the Tie-in activities

Coordinate with Client for the PTW approval

Alignment of the mechanical equipment like: Pumps & Compressors

Support and Assistance for Commissioning and Performance Guarantee test run of Fire water pumps and complete network

Area Construction Manager, Sep-2017 to Aug-2018

Company Name : JGC Construction International Pte. Ltd.

Deputation to JGC GULF International Ltd.

Project Name : Sitra Storage Tanks & Field Pipeline

Description : An EPC project for addition of new Hydrocarbon liquid storages tanks and field pipelines

from new Central Gas Plant (CGP)-III

Client Name : Bahrain National Gas (BANAGAS)

Location : Bahrain

Roles and Responsibilities

Responsible for Mechanical and piping works

Responsible for preparation of Construction Schedule and to monitor daily activities on day to day basis

Piping materials Handled Carbon steel, RTR and Stainless steel

Fabrication, erection for the Tanks and Field pipelines

Review of Hydrotest packages and Monitoring of Hydrotesting

Take corrective action to clear all the piping related punch lists and co-ordinate with the subcontractor and the Client till closing the punch lists

Ensure safety at Worksites and Maintain “Accident Free Site”

Play a vital role in leadership and Develop Team Sprit among subordinates

Ensure effective utilization of Men, Materials and Plant & Machineries available at Worksites

Conduct regular meetings with subordinates / sub-contractors for Progress Monitoring

Plan the job, to enable timely moralization of resources – men, materials and machinery

Piping Superintendent, Feb 2016 to Aug 2017

Company Name : JGC Construction International Pte. Ltd.

Deputation to JGC GULF International Ltd.

Project Name : North Arabian Unconventional Gas Projects – System A (NAUG-A)

Description : An EPC project for exploration of Unconventional Gas from Well head, processing of the Gas

and transportation to storage facilities

Client Name : Saudi Aramco

Location : Saudi Arabia

Roles and Responsibilities

Receiving the approved GA drawing and pipeline fabrication at site according to the priority

Follow-up Civil excavation activities with Subcontractor

Coordinate with QC dept & Subcontractor for the NDE arrangements

Prepare the Pipe Segments schedule (1.2 Kms) and monitoring the Segment readiness

Coordinate with Area manager and Safety Supervisor for 1.2 Kms Pipeline lowering activities

Monitoring the water filling & Pigging activities for the entire Pipeline

Preparation of Hydrotest packages and Monitoring of Hydrotesting activities

Responsible for preparation of Construction Schedule and to monitor daily activities on day to day basis

Conduct daily and weekly progress meeting to discuss all site issues

Piping Superintendent, May 2013 to Jan 2015

Company Name : JGC Construction International Pte. Ltd.

Deputation to JGC GULF International Ltd.

Project Name : SADARA Aromatics Project

Description : An EPC project for establishment of new Aromatics unit

Client Name : Joint Venture of Saudi Aramco and DOW Chemicals

Location : Saudi Arabia

Roles and Responsibilities

Receiving the approved drawing for fabrication and preparing the fabrication schedule according to priority

Verification of isometric drawings with respect to P&ID

To attain final walk through of complete piping system and verify clearing of all punch list to prior to mechanical completion

Actions to be prepared and implemented for clearing any NCR raised by QC departments or clients

Erection & Alignment of the Static equipment’s lik: Pressure vessels & Exchangers & Reactors & Elevated flare

Arrangement of required manpower, piping materials, equipment’s, etc. As per requirement

Prepare Hydrotest packages and coordinate for the approval of the hydro-test packages. Monitoring of Hydrotesting activities

Resolving field problems and liaison client under the supervision of Mech. Eng. and process Depts.

Alignment of the mechanical equipment like: Pumps & Compressors

Site Fabrication supervision and spool erection activity monitoring

Monitoring lifting activities like: Pumps & Compressors & Heat exchangers etc

Receiving the approved drawing for shop fabrication and preparing the shop fabrication schedule according to priority

Coordination with MCS (Warehouse) department to updating incoming materials and status as per project material delivery schedule to do further Piping construction schedule.

Piping Superintendent, Feb 2012 – Jan 2013

Company Name : Petrofac International Ltd.

Project Name : ASAB FFD project (Green Field)

Description : An EPC project for Full Field Development project

Client Name : Abu Dhabi Company for Onshore Petroleum Operations Ltd (ADCO)

Location : Abu Dhabi

Roles and Responsibilities

Receiving the approved drawing for fabrication and preparing the fabrication schedule according to priority

Verification of isometric drawings with respect to P&ID

Responsible for Mechanical and piping works

Responsible for preparation of Construction Schedule and to monitor daily activities on day to day basis

Piping materials Handled Carbon steel, RTR and Stainless steel

Review of Hydrotest packages and Monitoring of Hydrotesting

Take corrective action to clear all the piping related punch lists and co-ordinate with the subcontractor and the Client till closing the punch lists

Piping Engineer, Jan 2011 – Dec 2011

Company Name : JGC Arabia LTD

Project Name : Manifa Utilities Project

Description : An EPC project for Crude oil Processing and associated utilities plant

Client Name : Saudi Aramco

Location : Saudi Arabia

Roles and Responsibilities

Preparation construction schedule in line with master schedule

Co-ordination between management, Execution staff and subcontractor

Managing resources for optimum utilization

Achieve construction milestones

Responsibilities for systematic planning the job, to enable timely mobilization of resources men, material and machinery

Resolving field problems and liaison client under the supervision of Mech. Eng. and process Depts.

Prepare site instruction to the subcontractor to perform the additional construction activities which has risen due to the design errors and additional requirements by the Client

To give suitable instructions for make field routings in order to solve the engineering solutions as per site condition

Piping materials Handled Carbon steel, RTR and Stainless steel

Fabrication, erection and testing of Field piping

Review of Hydrotest packages and Monitoring of Hydrotesting

Piping Engineer, Jul 2009 – Dec 2010

Company Name : Technicas Reunidas Gulf Co. Ltd

Project Name : Saudi Kayan Petrochemicals Project

Description : An EPC project for Petro Chemical complex

Client Name : Saudi Kayan

Location : Saudi Arabia

Roles and Responsibilities

Responsible for preparation of Construction Schedule and to monitor daily activities on day to day basis

Piping materials Handled Carbon steel, RTR and Stainless steel

Fabrication, erection and testing of Field pipelines

Review of Hydrotest packages and Monitoring of Hydrotesting

Preparation of weekly & two weeks ahead schedule chart of piping fabrication /field erection

Take corrective action to clear all the piping related punch lists and co-ordinate with the subcontractor and the Client till closing the punch lists

Provide technical assistance for any clarification raise by sub-con/ Inter discipline & clients during piping/equipment/Structure installations

Involved in Reinstatement activities for Clear the B punch items.

Monitoring of Sub-con activities under assign area for Piping fabrication and field erection

Supervise the implementation of field design modification (As built) and and follow up field instruction request by the sub-con in case of change work order required due to engineering design/material error

Piping Engineer, Sep 2008 – Jun 2009

Company Name : Technicas Reunidas Gulf Co. Ltd

Project Name : Hawiyah Gas Plant Expansion

Description : An EPC project for Expansion of Processing facilities

Client Name : Saudi Aramco

Location : Saudi Arabia

Roles and Responsibilities

Modification of Isometrics & P&ID According to site situation and make As Built.

Involved in Reinstatement activities for Clear the B punch items.

Inspected the Gasket, Valve installation and Bolt Torqueing of the Completed line.

Ability to manage operations with a diverse multi-cultural/multi-national workforce.

Control Calibrated Measuring and testing Equipment’s are used in the Project.

Conduct all worker activities in the safe and environmental policies and procedure

Material inspections & Test package review and verification.

Monitoring of Sub-con activities under assign area for Piping fabrication and field erection

Preparation of work schedule as per work front availability and weekly progress report chart.

Coordinates with all concern departments & discipline for field activities

Preparation of weekly & two weeks ahead schedule chart of piping fabrication /field erection

Supervise the implementation of field design modification (As built) and and follow up field instruction request by the sub-con in case of change work order required due to engineering design/material error

Coordination with MCS (Warehouse) department to updating incoming materials and status as per project material delivery schedule to do further Piping construction schedule.

Handle different Materials– Alloy Steel (P11), Stainless Steel (304/316/321&347), Alloy Steel, PTFE, & RTR(GRP/FRP)

Provide technical assistance for any clarification raise by sub-con/ Inter discipline & clients during piping/equipment/Structure installations

Construction Engineer, Oct 2007 – Jul 2008

Company Name : SGS Inspections Ltd

Project Name : Turn Around & Inspection (T&I), Shutdown

Description : Total Complex Shutdown (TCS) for the maintenance of existing facilities

Client Name : Indian Oil Corporation Ltd. (IOCL)

Location : Bihar, India

Roles and Responsibilities

Work in schedule Shutdown of Coker-A and AVU-II (Ascosporic vacuum unit)

Witness Hydro test of Heat Exchanger, Fin-Fan Coolers, vessels, Piping, and Valves.

Work in schedule Shutdown of Fluidized catalytic cracking unit (FCCU), Crude distillation unit (CDU), Vacuum distillation unit (VDU), Viscosity breaker unit (VBU), and Catalytic reactor unit (CRU).

Carry out major job in Coker-A shut down is inside of column strip line welding,

Reactor repair welding.

Carry out inspection of coke-cutting structure replacement welding job and pipeline.

Review of engineering drawings.

Carry out Radiographic Interpretation as per acceptance standard ASME SEC VIII.

Monitor Pre-heat, post-heat and Stress relieving of CS, LAS and SS piping.

Witness Hydro test of Heat-Exchanger, Fin-Fan Coolers and Vessels.

Witness Hydro test of Furness tubes, all piping loops.

Witness of to measure all piping thickness by using Ultrasonic Testing machine.

Carry out internal Inspection for Corrosion.

Experience in repair & inspection of high thickness alloy steel nozzles of reactors.

Involve in Documentation Work.

Responsible for Welding processes Viz. SMAW, SAW, GTAW, GMAW, and FCAW.

Coordinating with Senior Inspection Engineers, Preparation of Inspection reports, Verification of test reports and Completion of inspection booklets.

Carrying out various stage inspections during fabrication.

Perform Destructive & Non –Destructive Testing Before & After Stress – Relieving Process.

Carry Out Internal Inspection of Heat-Exchangers, Pressure Vessels, Columns,

and Reformer.

Mechanical Engineer, May 2005 – Sep 2007

Company Name : Megha Engineering & Infrastructures Ltd.

Project Name : Pipeline Lift Irrigation Project

Description : An EPC project for Water lift Irrigation

Location : Hyderabad, India

Roles and Responsibilities

Responsible for the shop / onsite fabrication and erection of materials as per drawings.

Manpower / material co-ordination and supervision.

Ability to read interpret technical drawings, fabrication procedures, material traceability, etc

Raw material identification reports and verifies the material as per standard against the Mill Test Certificate.

Perform Dimensional Checking, Pre weld Fit up, accordance with applicable drawing and specification.

Knowledge in various welding process like SMAW, GTAW, SAW.

Supervision work of sub-Contractors.

Ensure the quality of all work in accordance with the contractual requirements, codes and practices.

Raw material inspection with MTC review and dimensional inspection of plates.

Plate Marking, cutting and rolling of shells as per specifications.

Assembly of shells into pipes at fit-up stage.

SOFWARE SKILLS

MS-Office, Navisworks (3D Review), Primavera (basic), Auto Cad.

EDUCATION QUALIFICATION

Bachelor’s Degree in Mechanical Engineering

Higher Secondary School Certification

GENERAL INFORMATION

Name : Krishna Kishor G

Occupation : Lead Mechanical Supervisor

Date of Birth : 06/Apr/1984

Nationality : Indian

Marital Status : Single

Languages : English, Hindi, Telugu, Tamil

Telephone : +91-880*******/ +973-********

Email Address : adlkjb@r.postjobfree.com

Passport No : G5819831

Issue Date : 18-01-2017

Expiry Date : 17-10-2027

Address : 152/1, Nagendra colony,

Chinamushidivada, Visakhapatnam

Andhra Pradesh, India

HOBBIES

Movies

Photography

Travelling and Site seeing

Trekking

DECLARATION

I hereby declare that all the above provided information are my own and true to my knowledge.

Place:

Date

Signature

KRISHNA KISHOR



Contact this candidate