KRISHNA KISHOR G
Mobile No: +91-880*******
Email: adlkjb@r.postjobfree.com
CAREER SUMMARY
My professional experience primarily focuses on construction management for Oil, Gas and Petro chemical plants.
Qualified technical Team leader having more than 14 years of experience in major oil, gas and utilities projects in Middle East Countries and India. Possess practical and hands on experience in all aspects of mechanical construction works including piping, welding, fabrication, pump packages, blowers, heat exchangers, Tank construction, Vessels, Pipeline Pigging & Drying activity associated piping systems, Fire Fighting systems, Foam skids etc. - in industries such as Oil & Gas, Petro-chemicals, Refineries & Power plant.
Highly organized and dedicated with a positive attitude.
Self-motivated, able to set effective priorities and handle multiple assignments under high pressure within tight deadlines; adapt easily to new concepts and responsibilities.
WORK EXPERIENCE (15+ YEARS)
Area Construction Manager, Sep 2018 – Nov 2020
Company Name : JGC Construction International Pte. Ltd.
Deputation to JGC GULF International Ltd.
Project Name : Enhancement of Fire Protection Project (EFPS)
Description : An EPC project for upgrading existing Fire water network for the Entire Refinery and
Tank Farm
Client Name : Bahrain Petroleum Company (BAPCO)
Location : Bahrain
Roles and Responsibilities
Preparation construction schedule in line with master schedule
Co-ordination between management, Execution staff and subcontractor
Managing resources for optimum utilization
Achieve construction milestones
Ensure safety at Worksites and Maintain “Accident Free Site”
Responsibilities for systematic planning the job, to enable timely mobilization of resources men, material and machinery
Resolving field problems and liaison client under the supervision of Mech. Eng. and process Depts
Prepare site instruction to the subcontractor to perform the additional construction activities which has risen due to the design errors and additional requirements by the Client
To give suitable instructions for make field routings in order to solve the engineering solutions as per site condition
Coordinate to Area manager and Safety Supervisor for unloading and loading of all incoming and outgoing deliveries
Conduct daily and weekly progress meeting to discuss all site issues including upcoming requirements
Receiving the approved drawing for fabrication and preparing the fabrication schedule according to priority
Fabrication supervision and erection of structure, Pipelines, Fire Hydrants, Fire Monitors, Foam skids and Fire water pumps
Prepare Hydrotest packages and coordinate for the approval of the hydro-test packages. Monitoring of Hydrotesting activities
Take corrective action to clear all the piping& Equipment related punch lists and co-ordinate with the subcontractor and the Client till closing the punch lists
Taking lead for the shutdown jobs on running plant
Coordinate with the subcontractor to complete the re-instatement test packages in order to complete the mechanical completion
Coordinate with Client to get approval for the Tie-in activities
Coordinate with Client for the PTW approval
Alignment of the mechanical equipment like: Pumps & Compressors
Support and Assistance for Commissioning and Performance Guarantee test run of Fire water pumps and complete network
Area Construction Manager, Sep-2017 to Aug-2018
Company Name : JGC Construction International Pte. Ltd.
Deputation to JGC GULF International Ltd.
Project Name : Sitra Storage Tanks & Field Pipeline
Description : An EPC project for addition of new Hydrocarbon liquid storages tanks and field pipelines
from new Central Gas Plant (CGP)-III
Client Name : Bahrain National Gas (BANAGAS)
Location : Bahrain
Roles and Responsibilities
Responsible for Mechanical and piping works
Responsible for preparation of Construction Schedule and to monitor daily activities on day to day basis
Piping materials Handled Carbon steel, RTR and Stainless steel
Fabrication, erection for the Tanks and Field pipelines
Review of Hydrotest packages and Monitoring of Hydrotesting
Take corrective action to clear all the piping related punch lists and co-ordinate with the subcontractor and the Client till closing the punch lists
Ensure safety at Worksites and Maintain “Accident Free Site”
Play a vital role in leadership and Develop Team Sprit among subordinates
Ensure effective utilization of Men, Materials and Plant & Machineries available at Worksites
Conduct regular meetings with subordinates / sub-contractors for Progress Monitoring
Plan the job, to enable timely moralization of resources – men, materials and machinery
Piping Superintendent, Feb 2016 to Aug 2017
Company Name : JGC Construction International Pte. Ltd.
Deputation to JGC GULF International Ltd.
Project Name : North Arabian Unconventional Gas Projects – System A (NAUG-A)
Description : An EPC project for exploration of Unconventional Gas from Well head, processing of the Gas
and transportation to storage facilities
Client Name : Saudi Aramco
Location : Saudi Arabia
Roles and Responsibilities
Receiving the approved GA drawing and pipeline fabrication at site according to the priority
Follow-up Civil excavation activities with Subcontractor
Coordinate with QC dept & Subcontractor for the NDE arrangements
Prepare the Pipe Segments schedule (1.2 Kms) and monitoring the Segment readiness
Coordinate with Area manager and Safety Supervisor for 1.2 Kms Pipeline lowering activities
Monitoring the water filling & Pigging activities for the entire Pipeline
Preparation of Hydrotest packages and Monitoring of Hydrotesting activities
Responsible for preparation of Construction Schedule and to monitor daily activities on day to day basis
Conduct daily and weekly progress meeting to discuss all site issues
Piping Superintendent, May 2013 to Jan 2015
Company Name : JGC Construction International Pte. Ltd.
Deputation to JGC GULF International Ltd.
Project Name : SADARA Aromatics Project
Description : An EPC project for establishment of new Aromatics unit
Client Name : Joint Venture of Saudi Aramco and DOW Chemicals
Location : Saudi Arabia
Roles and Responsibilities
Receiving the approved drawing for fabrication and preparing the fabrication schedule according to priority
Verification of isometric drawings with respect to P&ID
To attain final walk through of complete piping system and verify clearing of all punch list to prior to mechanical completion
Actions to be prepared and implemented for clearing any NCR raised by QC departments or clients
Erection & Alignment of the Static equipment’s lik: Pressure vessels & Exchangers & Reactors & Elevated flare
Arrangement of required manpower, piping materials, equipment’s, etc. As per requirement
Prepare Hydrotest packages and coordinate for the approval of the hydro-test packages. Monitoring of Hydrotesting activities
Resolving field problems and liaison client under the supervision of Mech. Eng. and process Depts.
Alignment of the mechanical equipment like: Pumps & Compressors
Site Fabrication supervision and spool erection activity monitoring
Monitoring lifting activities like: Pumps & Compressors & Heat exchangers etc
Receiving the approved drawing for shop fabrication and preparing the shop fabrication schedule according to priority
Coordination with MCS (Warehouse) department to updating incoming materials and status as per project material delivery schedule to do further Piping construction schedule.
Piping Superintendent, Feb 2012 – Jan 2013
Company Name : Petrofac International Ltd.
Project Name : ASAB FFD project (Green Field)
Description : An EPC project for Full Field Development project
Client Name : Abu Dhabi Company for Onshore Petroleum Operations Ltd (ADCO)
Location : Abu Dhabi
Roles and Responsibilities
Receiving the approved drawing for fabrication and preparing the fabrication schedule according to priority
Verification of isometric drawings with respect to P&ID
Responsible for Mechanical and piping works
Responsible for preparation of Construction Schedule and to monitor daily activities on day to day basis
Piping materials Handled Carbon steel, RTR and Stainless steel
Review of Hydrotest packages and Monitoring of Hydrotesting
Take corrective action to clear all the piping related punch lists and co-ordinate with the subcontractor and the Client till closing the punch lists
Piping Engineer, Jan 2011 – Dec 2011
Company Name : JGC Arabia LTD
Project Name : Manifa Utilities Project
Description : An EPC project for Crude oil Processing and associated utilities plant
Client Name : Saudi Aramco
Location : Saudi Arabia
Roles and Responsibilities
Preparation construction schedule in line with master schedule
Co-ordination between management, Execution staff and subcontractor
Managing resources for optimum utilization
Achieve construction milestones
Responsibilities for systematic planning the job, to enable timely mobilization of resources men, material and machinery
Resolving field problems and liaison client under the supervision of Mech. Eng. and process Depts.
Prepare site instruction to the subcontractor to perform the additional construction activities which has risen due to the design errors and additional requirements by the Client
To give suitable instructions for make field routings in order to solve the engineering solutions as per site condition
Piping materials Handled Carbon steel, RTR and Stainless steel
Fabrication, erection and testing of Field piping
Review of Hydrotest packages and Monitoring of Hydrotesting
Piping Engineer, Jul 2009 – Dec 2010
Company Name : Technicas Reunidas Gulf Co. Ltd
Project Name : Saudi Kayan Petrochemicals Project
Description : An EPC project for Petro Chemical complex
Client Name : Saudi Kayan
Location : Saudi Arabia
Roles and Responsibilities
Responsible for preparation of Construction Schedule and to monitor daily activities on day to day basis
Piping materials Handled Carbon steel, RTR and Stainless steel
Fabrication, erection and testing of Field pipelines
Review of Hydrotest packages and Monitoring of Hydrotesting
Preparation of weekly & two weeks ahead schedule chart of piping fabrication /field erection
Take corrective action to clear all the piping related punch lists and co-ordinate with the subcontractor and the Client till closing the punch lists
Provide technical assistance for any clarification raise by sub-con/ Inter discipline & clients during piping/equipment/Structure installations
Involved in Reinstatement activities for Clear the B punch items.
Monitoring of Sub-con activities under assign area for Piping fabrication and field erection
Supervise the implementation of field design modification (As built) and and follow up field instruction request by the sub-con in case of change work order required due to engineering design/material error
Piping Engineer, Sep 2008 – Jun 2009
Company Name : Technicas Reunidas Gulf Co. Ltd
Project Name : Hawiyah Gas Plant Expansion
Description : An EPC project for Expansion of Processing facilities
Client Name : Saudi Aramco
Location : Saudi Arabia
Roles and Responsibilities
Modification of Isometrics & P&ID According to site situation and make As Built.
Involved in Reinstatement activities for Clear the B punch items.
Inspected the Gasket, Valve installation and Bolt Torqueing of the Completed line.
Ability to manage operations with a diverse multi-cultural/multi-national workforce.
Control Calibrated Measuring and testing Equipment’s are used in the Project.
Conduct all worker activities in the safe and environmental policies and procedure
Material inspections & Test package review and verification.
Monitoring of Sub-con activities under assign area for Piping fabrication and field erection
Preparation of work schedule as per work front availability and weekly progress report chart.
Coordinates with all concern departments & discipline for field activities
Preparation of weekly & two weeks ahead schedule chart of piping fabrication /field erection
Supervise the implementation of field design modification (As built) and and follow up field instruction request by the sub-con in case of change work order required due to engineering design/material error
Coordination with MCS (Warehouse) department to updating incoming materials and status as per project material delivery schedule to do further Piping construction schedule.
Handle different Materials– Alloy Steel (P11), Stainless Steel (304/316/321&347), Alloy Steel, PTFE, & RTR(GRP/FRP)
Provide technical assistance for any clarification raise by sub-con/ Inter discipline & clients during piping/equipment/Structure installations
Construction Engineer, Oct 2007 – Jul 2008
Company Name : SGS Inspections Ltd
Project Name : Turn Around & Inspection (T&I), Shutdown
Description : Total Complex Shutdown (TCS) for the maintenance of existing facilities
Client Name : Indian Oil Corporation Ltd. (IOCL)
Location : Bihar, India
Roles and Responsibilities
Work in schedule Shutdown of Coker-A and AVU-II (Ascosporic vacuum unit)
Witness Hydro test of Heat Exchanger, Fin-Fan Coolers, vessels, Piping, and Valves.
Work in schedule Shutdown of Fluidized catalytic cracking unit (FCCU), Crude distillation unit (CDU), Vacuum distillation unit (VDU), Viscosity breaker unit (VBU), and Catalytic reactor unit (CRU).
Carry out major job in Coker-A shut down is inside of column strip line welding,
Reactor repair welding.
Carry out inspection of coke-cutting structure replacement welding job and pipeline.
Review of engineering drawings.
Carry out Radiographic Interpretation as per acceptance standard ASME SEC VIII.
Monitor Pre-heat, post-heat and Stress relieving of CS, LAS and SS piping.
Witness Hydro test of Heat-Exchanger, Fin-Fan Coolers and Vessels.
Witness Hydro test of Furness tubes, all piping loops.
Witness of to measure all piping thickness by using Ultrasonic Testing machine.
Carry out internal Inspection for Corrosion.
Experience in repair & inspection of high thickness alloy steel nozzles of reactors.
Involve in Documentation Work.
Responsible for Welding processes Viz. SMAW, SAW, GTAW, GMAW, and FCAW.
Coordinating with Senior Inspection Engineers, Preparation of Inspection reports, Verification of test reports and Completion of inspection booklets.
Carrying out various stage inspections during fabrication.
Perform Destructive & Non –Destructive Testing Before & After Stress – Relieving Process.
Carry Out Internal Inspection of Heat-Exchangers, Pressure Vessels, Columns,
and Reformer.
Mechanical Engineer, May 2005 – Sep 2007
Company Name : Megha Engineering & Infrastructures Ltd.
Project Name : Pipeline Lift Irrigation Project
Description : An EPC project for Water lift Irrigation
Location : Hyderabad, India
Roles and Responsibilities
Responsible for the shop / onsite fabrication and erection of materials as per drawings.
Manpower / material co-ordination and supervision.
Ability to read interpret technical drawings, fabrication procedures, material traceability, etc
Raw material identification reports and verifies the material as per standard against the Mill Test Certificate.
Perform Dimensional Checking, Pre weld Fit up, accordance with applicable drawing and specification.
Knowledge in various welding process like SMAW, GTAW, SAW.
Supervision work of sub-Contractors.
Ensure the quality of all work in accordance with the contractual requirements, codes and practices.
Raw material inspection with MTC review and dimensional inspection of plates.
Plate Marking, cutting and rolling of shells as per specifications.
Assembly of shells into pipes at fit-up stage.
SOFWARE SKILLS
MS-Office, Navisworks (3D Review), Primavera (basic), Auto Cad.
EDUCATION QUALIFICATION
Bachelor’s Degree in Mechanical Engineering
Higher Secondary School Certification
GENERAL INFORMATION
Name : Krishna Kishor G
Occupation : Lead Mechanical Supervisor
Date of Birth : 06/Apr/1984
Nationality : Indian
Marital Status : Single
Languages : English, Hindi, Telugu, Tamil
Telephone : +91-880*******/ +973-********
Email Address : adlkjb@r.postjobfree.com
Passport No : G5819831
Issue Date : 18-01-2017
Expiry Date : 17-10-2027
Address : 152/1, Nagendra colony,
Chinamushidivada, Visakhapatnam
Andhra Pradesh, India
HOBBIES
Movies
Photography
Travelling and Site seeing
Trekking
DECLARATION
I hereby declare that all the above provided information are my own and true to my knowledge.
Place:
Date
Signature
KRISHNA KISHOR