Resume

Sign in

Civil Engineering Project

Location:
Dubai, United Arab Emirates
Posted:
March 25, 2021

Contact this candidate

Resume:

CURRUCULAM VITAE

R. SELVAM

DUBAI, UAE

Mobile: +971*********

Email: adk6u3@r.postjobfree.com

Objective

To take up noteworthy, distinguished challenging assignments which paves way for company’s remarkable growth as well as my own career growth. Total Experience & Accomplishments: 20+ years in Structural Steel Detailing, Fabrication drawings, Temporary Traffic Management and RCC Bar bending drawings / Schedule. Experience Profiles

Position : Design Coordinator (Mar 2019 to till date) Organization : SCIENTECHNIC L.L.C., Dubai.

Position : Design Coordinator (Nov 2015 to Mar 2019) Organization : HLG CONTRACTING L.L.C., Dubai.

Position : Structural Detailer (Jan 2007 to Oct 2015) Organization : Wade Adams L.L.C., Dubai.

Position : AutoCAD Draughtsman (Aug 2005 to Dec 2006) Organization : Al Futtaim Carillion L.L.C., Dubai. Position : AutoCAD Draughtsman (July 2004 to July 2005) Organization : Dalal Mott MacDonald, Chennai.

Position : AutoCAD Draughtsman (Dec 2001 to July 2004) Organization : Valdel Engineers & Constructors, Bangalore. Position : AutoCAD Draughtsman (May 1998-Nov 2001) Organization : Drafts Cad Services, Chennai.

SCOPE OF WORKS:

Under taking all kind of engineering Scope drawing for coordinate with design team and construction team, preparing project schedule and shop drawing checking the drafting, detailing & leading the drafting team.

Preparing Temporary Traffic management layouts.

Good track record in preparing structural steel drawings & reinforcement drawings.

Preparation of fabrication drawings and RCC Bar bending drawings/schedule for the entire Project.

Computer Proficiency

Operating Systems : Ms-Windows.

Software : AutoCAD (All Versions), Ms-Office,

Microstation, RC Cad & Civil-3d.

PROJECTS HANDLED:

ITS 2020 PROJECT:

ITS 2020/1B and ITS2020/1C Projects worth AED 150 million and 200 million respectively.

The ITS 2020/1B project covers the deployment of DMS, associated control cabinets and support structures, while ITS2020/1C project covers the deployment of field ITS outstation cabinets, hub cabinets, MDBs, feeder pillars and a fibre optic communication network throughout Dubai to provide ITS coverage for Sheikh Zayed Road, Sheikh Mohammed Bin Zayed Road, Al Khail Road and other 23 roads for extending the current E and D roadways monitoring and control coverage from current level 11% to 100%. Besides, it provides updated Advanced Traffic Management System (ATMS) to replace the existing outdated Falcon ATMS.

DUBAI AIRPORT UPGRADE JUNCTION AT AIRPORT ROAD

New bridges and tunnels around the Airport Road in Dubai. The Dhs400million upgrade comprises the construction of bridges and tunnels at the Rashidiya and Airport Road interchanges with Casablanca Street, Marrakech Street and Nad Al Hamar Street. This includes a three-lane flyover at the Marrakech Street – Airport Road Interchange. Temporary Traffic Management Scheme, Structural works, shop drawings and Site Coordination’s.

R902/2A Improvement of Sheikh Mohammed Bin Zayed Road

This project consists of construction of 24.5km of Roads including Two Bridge, widening of the existing roads & Bridges. This project also includes the utility networks for Water, Etisalat, Du, Irrigation, Street lighting, Electricity, Drainage, Protection for Existing Services and Future Crossings and relocation of existing services. Responsibilities:

Preparation of design Calculation report and design sheets for form works for Retaining Wall, Underpass and Bridges.

Design verification calculations for chambers and Thrust block design.

Coordination with drafting team and preparation of Scaffolding Formwork drawings. Coordination with Engineers at site.

Preparation of Design spread sheets.

Checking of Civil & Structural drawings and issued to site for construction. Tender: Metro Route 2020

This project consists of construction of 11km of Metro route and Roads including all utilities Protect and diversion.

Preparing Temporary Traffic management layouts.

Improvements of the 5th Industrial Intersection / Sharjah (Emirates Road) Second Stage: - Improvements of Al Dhaid Road I/C, King Abdul Azeez I/C & UNIVERSITY City I/C. (M/s. PARSONS - DUBAI,)

This project consists of construction of 22.8km of Roads including Three Bridge, Six Fly Over, widening of the existing roads & Bridges. This project also includes the utility Networks for Water, Etisalat, Du, Irrigation, Street lighting, Electricity, Drainage, Drainage Pumping Station and Future Crossings and relocation of existing services. AL AIN WILDLIFE PARK AND RESORT (AWPR) (M/s. Hyder Consulting,) This project consists of Design and construction of Earth Works, Roads, Landscaping, Retaining Wall and Infrastructure Works such as utility networks for Sewer, Storm Water Drainage, Gas, Irrigation, Street Lighting, Water, Etisalat, Du, Electrical, Future Crossings And relocation of existing services. This project also includes innovation of existing ZOO, SAFARI facilities, Resorts, Commercial & Residential Buildings. Contract R842/4 IMPROVEMENTS OF AL KHAIL ROAD (M/s. Consult Aecom,) This project consists of construction of 3.5km of Roads including Three Bridge widening of The existing roads. This project also includes the utility networks for Water, Etisalat, Du, Irrigation, Street lighting, Electricity, Drainage and Future Crossings and relocation of Existing services.

Improvement of Al Safooh Area Road Network (M/s. PARSONS - DUBAI,)

Preparation of formwork supporting arrangement for bridge deck.

Erection methodology and fabrication details of deck erection machine.

Preparation of the Pier, pier cap and abutment formwork arrangement. Improvement of Al Hamidiya Interchange – (M/s. IDROESSE - Ajman,)

Preparation of formwork supporting arrangement for bridge deck.

Movable working platform for finishing works around the bridge.

Preparation of the Pier, pier cap and abutment formwork arrangement. Development of Mirdif Interchange – (M/s. AFRICON - DUBAI,)

Preparation of formwork supporting arrangement for bridge deck.

Movable working platform for finishing works around the bridge.

Preparation of the Pier, pier cap and abutment formwork arrangement. Sharjah International Airport Apron Expansion Project - (M/s. HALCROW)

Preparation of general arrangement and details of steel staircase drawings.

Preparation of general arrangement and details of steel truss drawings... SPECIAL EXPLOSURE

Have undergone 2 months deputation in Dubai for the Jumeirah Lake Tower J3– Dubai. PROJECTS EXECUTED

● Jumeirah Lake Tower J3, Hotel & Residential Apartment Bldg., of M/S., Mott MacDonald - Dubai.

● Qatar Science & Technology Park-Building 05, of M/S., Mott MacDonald - Dubai. Area of Exposures in Structural Steel Detailing

Cement Plant

Chettinad Cement Corporation Ltd., Transfer Tower TT – 3 and TT – 4. (Clinker Silo L & T Cements, Central plant at Tadipatri.

● Preparation of marking plan and Elevation, Column details, Beams Column Bracings.

● Plan Bracings and Truss, Rafter & Tie Bracing & Purlins, Side sheeting Cheqd.

● Plate details and Bill of materials.

Hospital Building

Government of Gujarat, Prime Ministers National Relief Fund. G.K.General Hospital, Bhuj

Preparation of Marking Plan of Beams, Jackets, Slabs, Sunken Slabs.

Fabrication Details of Main Beams, Secondary Beams and Jackets.

Details of Concrete Planks and Connection Details between Beams to JACKETS, Concrete Beams to Steel Beams, Beams to Shear Walls and Insert Details in Concert Beams.

Resorts

Taj Maldives Pvt. Ltd., Taj Lagoon Resort Renovation & Upgrading. Male’ Atoll, Maldives (M /s. Larsen & Toubro Ltd.,)

General Arrangement and Details of wooden truss, Connectors and Gusset plates for

Connecting truss to truss and truss to jack truss etc. Bridges

Construction of Watrak Bridge. - M/s. Larsen & Toubro Ltd., General layout of casting yard, details, fabrication details of Trestles, Fabrication Details of Side Shutter and Bottom Shutter.

Chennai MRTS–Phase-II (Metropolitan Transport Project) (Thirumaillai to Velachery) Fabrication details of Front Supporting Trestle, Rear Supporting beam, PSC girder side shifting Sequence at Front & Rear Support, Fabrication details of Spud. RAPID TRANSID SYSTEM – Elevated Corridor – Delhi

Preparation of formwork details of precast segment.

Erection methodology and fabrication details of deck erection machine.

Construction methodology of Bridge

Wadi Abdoun Bridge - Hashemite Kingdom of Jordan (Dar Al-Handiasah)

Preparation of formwork details of precast segment

Erection methodology and fabrication details of deck erection machine.

Construction methodology of Bridge.

Area of Exposures in R.C.C. Structure

Sri Sathya Sai Institute of Culture and Music for SSSCT at Puttaparthy - M/s. Larsen & Toubro Ltd.,

Numeration details of first floor slab and beam at 104.850 LVL.

R.C. Details of first floor slab at.104.850 LVL.

R.C. Details of Main and Secondary Beams at first Floor at 104.850 LVL. Burj Dubai Development Old Town Residential (M/s. EMAAR - DUBAI,)

Preparation of Reinforcement Details of All R.C.C. Structures.

R.C. Details of Main and Secondary Beams.

Area of Exposures in Offshore

SASCO (Sharjah aviation services company LLC) Expansion Project – Sharjah

Preparation of Foam skid diesel engine foundation, Recirculation Pump foundation

Recovery Pump foundation and other oil and gas storage pump foundations.

Stability check and crack width check for bund and retaining wall.

Foundation design for Recovery Shelter, Recirculation Shelter, Foam Skid Shelter.

Preparation of Pipeline thrust block drawings.

N9-N10 WELL PLATFORM PROJECT - LARSEN & TOUBRO LTD. (Client)

‘N9 & N10’ Platform is a light weight un-manned Jacket structure with 0+4 foundation systems

(0 Main Piles + 4 Skirt Piles), 12 Nos of pile driven conductor Wells, Cathodic protection system for the sub-sea facilities, along with an integrated Boat-landing/Barge Bumper assemply, a Deck structure comprising of Main deck and Cellar Deck, Flare Boom, Building Module, Helideck & Stairs etc.

Preparation of detail engineering drawings for Jacket Horizontal Framings, Cellar Deck & Main Deck Framings and Deck Truss Details. I was also involved in the preparation of GFO mto for the above project.

9- CLAMP ON PROJECT - LARSEN & TOUBRO LTD. (Client) In this project I was Involved in developing conceptual details during pre-bid and at present Design drawings of clamp-on structures for 9 offshore platforms. The following are the different jobs I handle in this project.

Preparation of standard details such as conductor orientation and elevations, conductor guide and clamp details.

Fixing the location of clamps based on pre-engineering survey report

Deck extensions details

Conductor make-up length details

Calculation of surface areas and preparation of anode distribution drawings

Given a pre-engineering survey report I can prepare the basic layout for sub-sea clamps of which sizes shall be later confirmed by the concerned engineer. PS2 & PS3 PROJECT - LARSEN & TOUBRO LTD. (Client)

‘PS2 & PS3’ Platform is a light weight un-manned Jacket structure with 4 foundation systems (4 Main Piles), Cathodic protection system for the sub-sea facilities, along with an integrated Boat- landing/Barge Bumper assembly, a Deck structure comprising of Main deck and Cellar Deck, Flare Boom, Building Module, Helideck & Stairs etc. Preparation of detail engineering drawings for Jacket Horizontal Framings, Cellar Deck & Main Deck Framings and Deck Truss Details. I was also involved in the preparation of GFO mto for the above project.

Personal Details

Name : R. SELVAM

Fathers Name : P.RAJA

Date of Birth : 14-07-1979

Sex : Male

Marital status : Married

Passport Number : T 3928262

U.A.E Driving License : Light Vehicle (Automatic). Educational Qualification : BE (Civil Engineering - 2014-2017) DIPLOMA (Civil Engineering 2011-2014)

Declaration

I hereby declare that the above-mentioned particulars are true to the best of my knowledge and belief.

Yours Sincerely,

(R. SELVAM)



Contact this candidate