RESUME
MOHAMMAD AMANULLA +91-986*******
**-****-* ******* *****, Opp. Govt Junior College +91-949*******
Tadipatri, Ananthapuramu, AP-515411 ********.*@*****.***
SUMMARY:
Experienced Senior Engineer Electrical with a demonstrated history of working in the solar energy. Skilled in Execution, commissioning and O&M of Solar PV Power Plants. Strong Technical Skills professional with a Bachelor of Technology (B. Tech) focused in E.C.E.
PROFESSIONAL SUMMARY:
Sr. Engineer-Electrical with 9 years of experience that includes
Executed 350MW above PV array Solar Power Plant at Various locations.
Engineer Drawings approval coordination at client end
Operations & Maintenance in PV array Solar Power Plant at Various locations.
Hands on experience with commissioning, Operation & Maintenance activities in solar PV power plant.
Inverters performance analyzing through SCADA.
Maintaining Daily, Weekly & Monthly reports regarding generation & breakdowns.
Commissioning of SMA & ABB SOLAR Inverters
Designed for cable routing and grouping strings for 30 MW PV array.
DC – Electrical cable routing and commissioning of DC equipment.
AC – Electrical cable routing and commissioning of AC equipment.
Network & Communication System Installation of PV array.
MIS reports, V lookup, pivot tables.
TECHNICAL SKILLS:
MS-Office, Windows family.
AUTOCAD skills.
EDUCATIONAL CREDENTIALS:
B. Tech in Electronics and Communication Engineering (2006-10) from VIF College of Engineering & Technology (JNTU-H), Moinabad, Hyderabad. With 61.22% aggregate.
Intermediate in M.P.C (2004-06) from Aditya junior college (Board of Intermediate), Palakol, Andhra Pradesh. With 73.70% aggregate.
SSC (2003-04) from Taylor high School (Board of Secondary Education), Narsapuram, Andhra Pradesh with 65.60% aggregate.
WORK EXPERIENCE:
VIKRAM SOLAR LIMITED (Sept 2017 – till date)
Working as a Senior Engineer-Electrical in VIKRAM SOLAR LIMITED. From Sept 2017 to till date.
CURRENT PROJECT DETAILS:
2X100 MW PV array Solar Power Plant, At Talaricheruvu(V), Tadipatri District: - Ananthapuramu, Andrapradesh.
Operation & Maintenance activities in 100MW solar PV power plant.
Land survey coordination
Test pile foundations execution
Managing different vendors for drawing submission, scheduled deliveries & services, ensuring the work is done with in time and in compliance with contracts.
Interface between internal departments like production, engineering, procurement, finance and site personnel.
Engineering drawings approval coordination with APGENCO.
Equipment inspection Scheduling and clearance coordination.
Supporting role in Billing.
AUROBINDO PARMA LTD (Feb 2017 – Sept 2017)
Worked as Senior Executive-Solar Projects in AUROBINDO PARMA LTD. From Feb 2017 to September 2017
PROJECT DETAILS EXECUTED IN AUROBINDO PHARMA LTD:
30MW PV array Solar Power Plant, At Varisam, District: - Srikakulam, Andrapradesh
Solar Modules Installation.
Junction Box Testing. Inverter Commissioning
Monitoring and Managing Civil Works Foundations of Structures and Inverters.
Designed for cable routing and grouping strings for 30 MW PV array.
Erection of mechanical works to Mount Structures.
PV array Plant monitoring & Maintenance.
Resolving Problems to Increase the Power Generation of Plant.
RENEW POWER VENTURES PVT LTD (June 2016 – Jan 2017)
Worked as Electrical Engineer- execution in RENEW POWER VENTURES PVT LTD. From June 2016 to January 2017.
Land survey coordination
Switch yard civil works
Soil testing coordination
Test pile foundations execution
Piling for tracker based system.
PROJECT DETAILS EXECUTED IN RENEW POWER VENTURES PVT LTD:
Project: #01
50MW PV array Solar Power Plant, At ITTGI, District: -Bellary, Karnataka
Project: #02
20MW PV array Solar Power Plant, At Chincholi, District: -Kalaburgi, Karnataka
Project: #03
143 MW PV array Solar Power Plant, At Dichpalli, District: - Kamareddy, Telangana
GE Solar (June 2015 – June 2016)
Worked as Project Engineer-Electrical in GE Solar from June 2015 to June 2016.
Solar Modules Installation.
Monitoring and Managing Civil Works Foundations of Structures
Erection of mechanical works to Mount Structures.
PV array Plant monitoring & Maintenance.
Operations & Maintenance.
PROJECTS EXECUTED IN G.E SOLAR:
Project: #01
CLIENT: SRI LAKSHMI GANAPATHI INDUSTRIES PVT LTD.
1.2MW PV array Solar Power Plant, At Buchigudem, Shadnagar, District: -Mahbubnagar, Telangana.
Project: #02
CLIENT: STERLING & WILLSON LTD.
24MW PV array Solar Power Plant, At Palwai, Gadwal, District: -Mahbubnagar, Telangana.
VOICE GATE TECHNOLOGIES PVT. LTD., (Dec 2013 – Oct 2014)
Worked as VAS Associate in VOICE GATE TECHNOLOGIES PVT. LTD. From December 2013 to October 2014.
Plan and maintain product strategy
Understanding competitive offerings and market requirements
MIS reports.
MS-excel, V lookup, pivot table, macros.
AWAD AL-JOUFI EST, Dammam Kingdom of Saudi Arabia (Feb 2013 – Sep 2013)
Worked as Electrical Engineer in AWAD AL-JOUFI EST. From February 2013 to September 2013.
Direct and co-ordinate construction, installation, maintenance, support and
Documentation activities to ensure compliance specifications.
Reading design specifications and technical drawings.
Co-Ordinate with A/C Works, Pre-Commissioning & Commissioning of Distribution Boards & Make Sure That All the Relevant Processing Equipment & Accessories Are Installed Properly.
Project Details:
Business Gate – Phase II. Al-Khobar, Dammam (K.S.A)
CLIENT: Mohammed & Abdullah Ibrahim Al Subeaei
CIRUS SOLAR SYSTEMS PVT LTD (Mar 2011 – Jan 2013)
Worked as Electrical Engineer in CIRUS SOLAR SYSTEMS PVT LTD. From March 2011 to January 2013.
Solar Modules Installation.
Junction Box Testing. Inverter Commissioning
Weather Station Installation.
Network & Communication System Installation.
Monitoring and Managing Civil Works Foundations of Structures and Inverters.
Supervision of cable routing works of DC connections and Communication of PV array.
Erection of mechanical works to Mount Structures.
PV array Plant monitoring & Maintenance.
Resolving Problems to Increase the Power Generation of Plant.
PROJECT DETAILS EXECUTED IN CIRUS SOLAR SYSTEMS PVT LTD:
Project: #01
CLIENT: SUN BORNE ENERGY SYSTEMS PVT LTD.
Worked as an Electrical Engineer for 5MW PV array Solar Power Plant, At Bhachau, District: -Kutch, Gujarat
Project: #02
CLIENT: GMR POWER PLANT.
Worked as an Electrical Engineer for 25MW PV array Solar Power Plant, In Gujarat Solar Park. At Charanka, District: -Paatan, Gujarat.
Project: #03
CLIENT: ALEX ASTRAL POWER PVT. LTD.
Worked as an Electrical Engineer for 5MW PV array Solar Power Plant, At Nokhodaya, District: -Bikaner, Rajasthan.
PERSONAL PROFILE:
Full Name : MOHAMMAD AMANULLA
Father’s Name : IBRAHIM ADIL
Marital Status : Married.
Languages Known : English, Hindi, Urdu, Telugu & Guajarati.
Passport Number : K6574092
Permanent Address : Flat No 402 Sai Thirumala Residency Plot No 51-56
Survey No 18 Maktha Mahaboob Pet
Janapriya West City Miyapur Hyderabad-500049
DECLARATION:
I hereby declare that the above mentioned information and particulars are true and correct to the best of my knowledge.
Date:
Place:
(MOHAMMAD AMANULLA)