Tejinder Singh
B-XIV/****,Street No-**,Sant Uatter Dev Nagar,
Sekha Road Barnala,
Mobile +919*********
Email: adjhqv@r.postjobfree.com
CIRRICULUM VITAE
Professional summary
Motivated and results – oriented power plant manager with 13+ years experience in the management of the station operations, maintenance, administration, and technical areas, while maintain the safe, reliable, and environmental complaint operation of the unit
Key Skills
Knowledge of generating stations equipments, material, operations, and power distribution and transmission systems
Demonstrated technical knowledge of fossil, Biomass, Multi fuel, MSW and RDF power plant.
Strong leadership capabilities, able to engage others and hold people accountable
13+ years experience leading supervising employees in a power generation, operation, and maintenance, erection and commissioning of power plants.
Understanding of budgeting and cost reporting
SAP plant maintenance and work clearance experience
Erection and commissioning of Power point 8.25 MW
Erection and commissioning of Power point 4.25 MW
Worked at India’s largest Muncipal solid waste based power plant – 24 MW
Notable Achievement
Was able to light up the power plant at Municipal solid waste based power plant, during downtime
Was able to reduce the cost of plan operation and was appreciated by Management
QUALIFICATION:
2005 B-tech in Mechanical Engg. From Lala Lajpat Rai Institute of Engg. And Technology
Moga (PTU).
2001, 3 year diploma in Mechanical Engg. From Govt. Polytechnic Guru Teg Bhadurgarh
(Moga).
1997 Matric BGS Public School Barnala (CBSE).
Industrial Experience
Ladhar Paper Mills, Ladhar (pb) (1st oct, 2018to continue)
Designation: - Power Plant Head
Current CTC: - 10.20 lac P.A
Expected Salary: - negotiable
Job Responsibilities
Maintenance & Operation of Power Project, maintenance of etp,wtp,pump house (utility dept).
Boiler: -20 TPH,Make: - Tharmax,Working Pressure: - 65kg/cm2, Working Temp: - 485oC
Fuel used: - Rice husk.
Turbine: - 3.0 MW,Make: - Triveni,Working Pressure: - 65 kg/cm2, Working Temp: - 460oC
Type: - Extraction Cum Condensing Turbine
Mishan Engineering Works Private Ltd. (15jan, 2017 to 30 sept, 2018)
Client:- Ramky group (DMSWSL,delhi).
Designation: - General manager O&M.
Job Responsibilities
Maintenance & Operation of Power Project
Boiler: -2x56TPH,Make: - Sanfeng Covanta,Working Pressure: - 42kg/cm2, Working Temp: - 390oC
Fuel used: - Rice husk.
Turbine: - 24 MW,Make: - Hanghou,Working Pressure: - 42 kg/cm2, Working Temp: - 390oC
Type: - Bleed Cum Condensing Turbine
Pragati Paper limited Ltd. Handesra. (20july, 2016 to 13jan,2017)
Designation: - Sr. Manager Power Plant
Job Responsibilities
Maintenance & Operation of Power Project
Boiler: -25 TPH,Make: - Tharmax,Working Pressure: - 65kg/cm2, Working Temp: - 485oC
Fuel used: - Rice husk.
Turbine: - 4.0 MW,Make: - Triveni,Working Pressure: - 65 kg/cm2, Working Temp: - 460oC
Type: - Extraction Cum Condensing Turbine
International Mega Food Park Ltd. Dabwala kalan. (15mar, 2013 to 18 july,2016)
Designation: - Sr. Manager Power Plant
Job Responsibilities
Maintenance & Operation of Power Project
Boiler: -25 TPH,Make: - Partech boiler Ltd,Working Pressure: - 65kg/cm2, Working Temp: - 485oC
Fuel used: - coal, pet coke, rice husk etc.
Turbine: - 4.0 MW,Make: - Max Watt,Working Pressure: - 65 kg/cm2, Working Temp: - 460oC
Type: - Bleed Cum Condensing Turbine
K.R Pulp And Paper Ltd. Shahjahanpur.Uttar pradesh ( 20th feb, 2012 to 12mar, 2013 )
Designation: - Power Plant Manager
Job Responsibilities
Maintenance & Operation of Power Project
Boiler: - 80 TPH
Make: - CVL,Working Pressure: - 65kg/cm2, Type: - Fluidised bed Combustion
Fuel used: - Husk & Coal and Pith.
Turbine: - 12 MW
Make: -Siemens, Working Pressure: - 65 kg/cm2, Working Temp: - 480oC
Type: - Extraction Cum Condensing Turbine
.
Orient Green Power Ltd. (23rd nov, 2010 to 18feb, 2012)
Site No 1. SM Environmental Technologies (P) Ltd. Pachaar Village,Chhipabarod, Rajasthan.
Designation: - Power Plant Manager
Job Responsibilities
Maintenance & Operation of Power Project
Boiler: - 38 TPH, Make: - Cheema Boilers, Working Pressure: - 67kg/cm2, Working Temp: - 485oC
Type: - Travelling Grate,Fuel used: - biomass.
Turbine: - 8 MW,Make: -Hanghou,Working Pressure: - 65 kg/cm2, Working Temp: - 460oC
Type: - Bleed Cum Condensing Turbine.
Site No 2. Amrit Environmental Technologies (P) Ltd. Keshwana.Rajsthan.
Job Responsibilities
Maintenance & Operation of Power Project
Boiler: - 38 TPH,Make: - Cheema Boilers,Working Pressure: - 67kg/cm2, Working Temp: - 485oC
Type: - Travelling Grade,Fuel used: - biomass.
Turbine: - 7.7 MW, Make: -Triveni,Working Pressure: -65 kg/cm2, Working Temp: - 460oC
Type: - Bleed Cum Condensing Turbine.
Chandigarh Distillery and Bottler Ltd Banur. (23rd Oct, 2006 to 18th nov,2010)
Designation: - Shift Engineer
Job Responsibilities
Erection, Commissioning, Maintenance & Operation of Power Project
Boiler: - 55 TPH,Make: - Cheema Boilers ltd,Working Pressure: - 67 kg/cm2, Working Temp: - 485oC
Type: - Fluidised bed Combustion,Fuel used: - Husk, Bio gas& Grain waste,coal, pet coke.
Turbine: - 8.25 MW,Make:-Siemens,Working Pressure: - 67 kg/cm2, Working Temp: - 460 oC
Type: - Back Pressure
Maintenance & Operation of Power Project
Boiler: - 30 TPH,Make: - Cheema Boilers ltd,Working Pressure: - 30 kg/cm2, Working Temp: - 425oC,Type: - Fluidised bed Combustion,Fuel used: - Husk, Bio gas& Grain waste
Turbine: - 3.0 MW,Make:-Alstom,Working Pressure: - 30 kg/cm2Working Temp: - 410 oC
Type: - Back Pressure,
Boiler: - 14 TPH,Make: - Cheema Boilers ltd,Working Pressure: - 18 kg/cm2, Working Temp: - 400oC,Type: - Fluidised bed Combustion,Fuel used: - Husk, Bio gas& Grain waste
Turbine: - 0.85 MW,Make:-Bellis,Working Pressure: - 18 kg/cm2, Working Temp: - 380 oC
Type: - Back Pressure
Boiler: - 12 TPH,Make: - Thermax,Working Pressure: - 10 kg/cm2,Working Temp: - 184oC
Type: - Fluidised bed Combustion, Fuel used: - Husk, Bio gas& Grain waste
INDUSTRIAL ORGANICS Ltd. (TRIDENT GROUP). (8th Nov, 2005 to 20th oct,2006 )
Designation: - Shift Engineer
Job Responsibilities
Erection, Commissioning, Maintenance & Operation of Power Project
Boiler: - 32 TPH,Make: - Cheema Boilers ltd,Working Pressure: - 67 kg/cm2 Working Temp: - 485oC
Type: - Fluidised bed Combustion, Fuel used: - Husk, Coal.
Turbine: - 4.0 MW,Make:-Triveni,Working Pressure: - 67 kg/cm2, Working Temp: - 460 oC
Type: - Back Pressure cum Extraction,Maintenance & Operation of following Boilers
Boiler: - 15 TPH,Make: - Thermax,Working Pressure: - 10kg/cm2 Working Temp: - 184oC
Type: - Fluidised bed Combustion,Fuel used: - Husk & Coal.
Boiler: - 9 TPH,Make: - Thermax,Working Pressure: - 8 kg/cm2 Working Temp: - 170oC
Type: - Fluidised bed Combustion, Fuel used: - Husk.
Boiler: - 3 TPH,Make: - Thermax,Working Pressure: - 8 kg/cm2 Type: - Oil fired
Fuel used: - Diesel/Furnace Oil
Personal Details:
DOB: 13/08/1981
Sex : Male
Martial Status: Married
I hereby declare that above information is true and best to my knowledge.
Date: Signature: