KRISHNA YADAV
Mobile: +91-707*******
Email: adiy6a@r.postjobfree.com
Position Applied for : civil FOREMAN
Date of birth : 2nd of Jan 1981.
Nationality : Indian.
Marital status : Married.
Gender : Male
Passport No : L2402629
OBJECTIVE:
Seeking position as a civil supervisor in a leading construction company in Architectural / civil sector. Where I could endeavor to utilize my adequate experience efficiently. Detail mentioned here
Passed Diploma in civil engineering from state Board of Technical Education Jharkhand, Ranchi
SSC passed from Bihar Examination Board, Patna
CAREER HISTORY
1.
I have total14 experience
I have 2 years Experience are Carpenter Foreman
working as Foreman Shapoorji Pallonji Middle East LLC OMAN
Work Curry Out Working constructing DUQAM REFINERY EPC-2 as Carpenter Forman, coulam,wall all type form work preparation coulam shutters, wall shutter all type slab
.
I have 1 year 6 months Experience are Carpenter Foreman
working as Foreman atPRORR BAU GmbH Doha metro green line
Work Curry Out Working as civil Forman, concrete work
Form work and Steel Work and Grouting Work. Tunnel in side form work and steel work
I have 2 Years& 6 months experience as Civil foreman in Specialized Projects Co.Ltd, Dammam.
Work carried out:
Constructing of Dammam Autism Center, KSA. Projects
Key Roles and Responsibilities:-
Working as a civil foreman.
Execution of all the work as per the drawings and specification.
Handling over of the projects on time required while execution happened from client/consultants sides.
Checking of structural layout and levels for structural work.
Checking of block work, plaster, flooring, ceramic work, marble work, cladding work and aluminum work etc.
Procurement of material as per the need and site conditions.
From Dec 2013 to Present
I have 7 years experience as a Civil foreman in Ms.AL JABER ALEC BUILDING LLC. Abu Dhabi, UAE
Work carried out:
1)Project name : Dubai International Airport AX 124
Key Roles and Responsibilities:
Execution of all the work as per the drawings and specification.
Execution of RCC structures, plants/Non plant building retaining structures, pile and raft foundation of heavy structures, equipment’s and supporting structures and platforms.
Handling over of the projects on time required while execution happened from client/consultants sides.
Checking of structural layout and levels for structural and plumbing work etc.
Checking of block work, plaster, flooring, ceramic work, marble work, cladding work and aluminum work etc.
Procurement of material as per the need and site conditions.
2)Project name : World trade center District Phase -2 (Dubai)
Key Roles and Responsibilities:
Execution of all the work as per the drawings and specification.
Execution of RCC structures, plants/Non plant building retaining structures, raft foundation of heavy structures, equipment’s and supporting structures and platforms.
All claims variations and extension of time required while execution happened from client/consultant sides.
Procurement of material as per the need and site conditions.
Keeping punctuality and discipline
Supervise and construct of all works ia the drawing and specification.
Using of leading.
Able to read shop side working drawing.
Daily site program according to engineer and report every day to manager.
3)Project name : Park hayat hotel (Abu Dhabi)
Key Roles and Responsibilities:
All types beam and slabs shuttering work.
Returning wall and core wall
Checking of the structural layout and levels for structural works etc.
Preparation of columns wall shutter.
4)Project name : Dubai marina mall
Key Roles and Responsibilities:
Execution of all the work as per the drawing and specification.
Raft and foundation of heavy structures.
Round columns, Round core wall and all type slab, beam, shuttering work.
Vertical and Horizontal Blanding.
From March 2006 to April 2013
Job outline:
Being bachelor of civil foreman with more than 8 years experience in architect & finishing sector with an excellent grade of company’s sites supervisor or civil foreman.
Estimating structural (Floor tiles, Wall tiles, layout and Plaster work) stage construction.
Observing of day to day and generating weekly and monthly production report.
Responsible for all drawing & estimates function related to construction work report to chief engineer.
Punctuality and discipline.
I can extend great support to the Civil Engineering Department in streamlining the activities and the project. I hope you will consider my candidature for the applied post as per my qualifications and proven abilities.
(Krishna Yadav)