Post Job Free

Resume

Sign in

Engineer Manager

Location:
Dubai, United Arab Emirates
Posted:
December 20, 2020

Contact this candidate

Resume:

A t u l D e s a i

Dubai, United Arab Emirates 009**-**-******* aditv9@r.postjobfree.com

Objective:

To pursue a highly rewarding career, seeking for a job in challenging and healthy work environment where I can utilize my skills and extensive knowledge & work experience efficiently for organizational growth. Academic accomplishment:

Bachelor of Engineering in Constructions - Mumbai University

Safety management in Euro Link, Dubai, UAE (2006)

Project management program training, Dubai, UAE (2006)

Accident management by ISQEM, Dubai, UAE (2008)

Membership of society of engineers’ association of UAE 2013

Registered with Dubai Municipality for G+1 building 2013

Appointed Persons training (Mammut)2016

Various training programs arranged by Khansaheb including PMDP, HSE, Sustainability, teamwork, conflict management, communication skill etc. (2016-2017)

IOSH supervising safely (Euro link), Dubai (2017)

IOSH supervising safely Euro link), Dubai (2019)

Appointed Persons training (Arbrit) 2019

Confined space coordinator training (Euro link), Dubai (2019)

Also have been shouldering responsibility of project Logistic coordinator, emergency coordinator, excavation coordinator, hot work/demolition permit issuer etc. while encouraging workers & the subordinate staff to execute works with best constructions & EHS practices through on-site trainings

/awareness programs.

Professional Experience:

KHANSAHEB CIVIL ENGINEERING LLC, DUBAI

o Senior site agent (construction manager)

[from Jan’2014] as senior agent/ construction manager executed following projects shouldering responsibilities such as

Coordinating & supervising site activities (civil works, finishes/interiors, MEP, hard & soft landscaping) at various stages for smooth operation in close coordination with the senior management, the consultants and the client.

Attend meetings with Management. Prepare internal programs to achieve management target and getting approval from management and progress monitoring.

Coordinating with Consultants, site agents, MEP Engineers, Site Engineers, Foremen and Sub contractors, suppliers to get work progress with in stipulated time.

Solving site problems and drawing discrepancies. Assist the execution teams with site inspections and approvals. Coordination with authorities and arrange permits, inspections & approvals.

Preparation and following of submittals and getting approvals of materials and drawings, material procurement, machinery and man power arrangement.

Site management with EHS considerations and in coordination with EHS team and department focusing on the company EHS policy implementation at site and on-site training requirements through safety inspections.

Complete logistic management including material deliveries, equipment arrangement and control, site set up, on-site men and machine traffic control etc. o AARP Farmhouse at Al Khawaneej – (project for Al Rostamani) o Construction of large storm water tanks in Al Fujairah – (project for Fujairah City Center/Majed Al Futtaim)

o DIFC / GV-11 Commercial Development (5B +C+H+12 storey building project for DIFC, Dubai) o Midriff Commercial Development (Khansaheb 35) – for Khansaheb investment LLC o Beach Palace Development – Engineer’s Office (project for H.H. Shaikh Mohammed) o Dry Storage Facility- for DIMC (project for H.H. Shaikh Hamdan) o Zabeel palace Gate & Majlis - Engineer’s Office (project for H.H. Shaikh Mohammed) GOLDEN TOWER CONTRACTING LLC, Dubai

[ from October 2012 to oct 2013]

Provided technical services as DM registered engineer and SOE member. WATERMAN L.L.C., Dubai

o Site Manager

[ from March 2009 – August 2012] Various projects involving construction of swimming pools, water features, hard landscaping and soft landscaping Waterman is a specialized engineering firm undertaking turn-key projects in the field of water treatment, swimming pools and water features, hard and soft landscaping in the Middle East As Project Manager/ Project engineer, managed resources and activities starting from at various stages of the project such as

Sales, coordination with designers, estimation dept, follow up with client etc.

Complete on site execution works for pools, Jacuzzis, w/features, hard landscaping and soft landscaping which includes all types of civil works as well as electro-mechanical installations

Complete coordination with various in-house departments such as design & estimation, procurement & purchase and accounts

Hard & soft Landscaping works (coordination with subcontractor, suppliers and s/vision)

Co-ordination with various agencies such as the client or the developer, project consultants, Main contractors and suppliers. Same time managing subordinate staff and workers and having coordination with higher management.

Complete management of resources including manpower, machinery and materials

Trouble shooting and maintenance

SHIMIZU CORPORATION (managed by SHIMZ Japan), Dubai Marina Apartments at Palm Jumeirah Island, Dubai

[ October 2006 - January 2009]

The Prestigious project coming up in the heart of Palm Island includes construction of 06 towers located on east and west wings. It also includes 10 units of luxurious town houses, 05 on each wing. The towers

(3B+C+14) and town houses are surrounded by podiums housing multi storey car park areas and utility buildings spread over the large area in both wings. As Site Manager, managed resources and activities starting from at various stages of the project such as

Complete piling works including pile testing and dewatering works for the project

Complete sub structure including raft, pile caps and Superstructure works which includes diaphragm walls, columns and slabs etc.

Landscaping works (coordination with subcontractor and direct supervision)

Co-ordination with various agencies such as project consultants, subcontractors and suppliers. Same time managing subordinate staff and workers and having coordination with higher management.

Complete management of manpower, machinery and materials DUTCO BALFOUR BEATTY GROUP, Dubai

[ Feb 2006 – Oct 2006] – as Site Agent (independent responsibility directly under Divisional Manager)

As site Agent shouldered the responsibility of the complete site management in Co-ordination with various agencies such as project consultants, subcontractors and suppliers. Same time managing subordinate staff and workers and having coordination with higher management. o Beach Development works at the Jebel Ali Int’l Hotel (consisting of variety of hard and soft landscaping works)

o Construction of sewage treatment plant and construction of water tanks for camp facilities at Jebel Ali Dutco Complex

o G + 2 Dutco Labour Accommodations at the Jebel Ali Dutco Complex o Swimming Pool project for H.H. Shaikh Maktoum on the Al Hayl Island (Abu Dhabi – Off shore project)

[Nov.2005 – March 2006] – as Site Agent (independent responsibility directly under Divisional Manager and with continuous coordination with GM)

The prestigious project consisted of Construction of Indoor swimming pool with pool bar, changing rooms, sitting areas and extensive hard and landscaping works etc. for H.H. Shaikh Maktoum supervised by Ruler’s Court / EO. Managed the entire project including

Complete site mobilization/demobilization and offshore site setup

Managing men, machine, materials logistics for sea transportation (off shore logistic management)

Site execution and Co-ordination with head office, client (EO), consultants, subcontractors/suppliers.

[Sept. 2005 – Dec.2005] – as Site Agent (independent responsibility directly under Divisional Manager)

o Construction of B+G+Terrace luxury villa at khawaneej The project consists of B+G+Terrace+roof luxury villa having high class finishes and external works including swimming pool and landscaping. The project includes main villa, majlis bldg., garage block & service block.

Managed initial stages of the projects including Site execution and co-ordination – Up to foundations and Co-ordination with head office, client, consultants, subcontractors/suppliers & government authorities.

[2005] – as Site Agent (Acting Project Manager, independent responsibility directly under Divisional Manager)

o Construction of Football fields and Center for sports excellence At Jebel Ali Shooting Club The project consisted of construction of building for sports excellence, Two ‘FIFA’ standard football fields with flood lighting arrangement, L.V. & H.V. rooms, Irrigation tank and system for London based club ‘My Sports’

Complete Project Management including Site execution and co-ordination with head office, client, consultant, subcontractors/suppliers & government authorities.

[Mar. – May 2005] – as Site Agent (independent responsibility directly under Divisional Manager and GM)

o Beach Development at Al Quaffey Island, UAE (Abu Dhabi offshore project) This fast track prestigious offshore project consisted of complete beach development works on the Al Quaffey Island for H.H. Shaikh Mohammed. The works included construction of swimming pool, pool bar, BBQ hut, gazebo, gymnasium block, soft and hard landscaping and external services. Managed site co-ordination which involved several agencies leading to the successful timely completion of the job to the Ruler’s satisfaction.

[2004 – 2005] – as Site Agent (Acting Project Manager, independent responsibility directly under Divisional Manager)

o Construction of ‘Spa’ for Jebel Ali International Hotels As acting PM; carried out Complete management (submissions, safety, resource management, coordination with client, consultants, subcontractor, cost control) of this fast track project consisted of B+G+1+Roof bldg. for ‘spa’ having five-star finishes built in less than 06 months confined area without disturbing the hotel operations.

[2003-2004] – as Site Agent

Liaising with the project planning engineer regarding construction programs. Checking materials, logistics, manpower and work in progress for compliance with the specified requirements. Observance of safety requirements. Resolving technical issues with employer’s representatives, suppliers, subcontractors and statutory authorities in coordination with the PM. Authority inspections. Quality control in accordance with CSIs/procedures method statements, quality plans and inspection and test plans, all prepared by the project management team and by subcontractors

o Refurbishment of Jebel Ali Hotel Terraces BoH Service areas o Construction of 6 private luxury villas at Emirates Hill o Construction of B+G+1 private luxury villa at Emirates Hill

[2000-2003] – Sr. Site Engineer

o Construction of 24 luxury villas at Emirates Hill for EMAAR Properties executed all activities for the villas from start to handover

o Development of Al Quoz - Godolphin stables (for engineer’s office) o Jebel Ali Hotel Refurbishment

o Construction of Golf Academy and Caddie yard with Golf Course development works o Construction of Desalination plant for Jebel Ali Hotel – successfully executed the works for the first desalination plant for any private hotel/resort o Construction of Guest Block no. 06 for Jebel Ali Hotel – managed project from start to handover as site incharge

[1995-2000] - as Site Engineer

As site engineer shouldered following responsibilities to execute various projects as listed below Setting out the works in accordance with the drawings and specification. Liaising with the project planning engineer and Project manager regarding construction programs. Checking materials, manpower, equipment requirements & arrangements and checking work in progress for compliance with the specified requirements. Observance of safety requirements. Site inspections and approvals. Work instructions to foremen/ subcontractors and supervision for various site activities including sub structure/ super structure, internal and external finishes, external services, MEP structures and extensive hard and soft landscaping works.

o Construction of DUTCO COMPLEX and DUTCO PLANT YARD at Jebel Ali industrial area o Jebel Ali International Hotels Extension project (structural civil & finishes, external MEP services, utility structures, hard & soft landscaping)- managed around 350 men and a large supervisory subordinate staff in two shifts to complete then one of the largest resort projects in time.

o Wafi Interchange project (Dubai Municipality Project) – supervised extensive external services works for water supply, irrigation, drainage, stormwater, LV & HV power lines and Jet Fuel line

B.G. SHIRKE CONSTRUCTION TECHNOLOGIES PVT LTD, (India) grade 1 contractors Site engineer

Mass Housing Complex for MHADA at Mumbai, India [1995] This huge project consisted of the construction of 42 high rise residential bldgs (few of them built with unique precast erection methods), auditorium, school, health clinic etc. along with extensive MEP services network and roadworks. This job provided me an opportunity to work with very good site management systems as the company was then awarded ISO-9000 status

Supervised site execution for 03 no. of S+11 residential bldgs. managing various site construction activities.

SHAMA CONSTRUCTIONS PVT LTD, (India)

Site engineer (site in charge)

Mass Housing/Complex for ‘State Reserve Police Force’/Mumbai, India [1994-1995] The project consisted of 06 no. of G + 3 residential buildings constructed as per the ‘seismic load design’ provided me a “not to miss” opportunity to execute the entire project independently leading to successful timely completion of the job in the beginning of my professional career.



Contact this candidate