N.SURESH,
Ambikapuram nagar,
Thiruninravur-602 024.
Thiruvallur District,
Tamilnadu, India.
Mobile (India): +919*********.
E Mail: adiq8x@r.postjobfree.com
A B.tech Civil Engineer having 15 Years of impeccable experience in the specialized projects of URBAN (INFRASTRUCTURE) DEVELOPMENT Includes Construction of Roads and Highways, buildings, Substation and project site works.
PROFESSIONAL COMPETENCY.
Establishing Horizontal and vertical survey control points.
Calculate setting out data and drawing co-ordinates prior to field survey works.
Making as built survey Reports. Attends inspection works with consultants for Approval.
Checking slab edges shuttering before casting and inspection with consultants.
Conducting site surveys in order to obtain or verify information relating to the project design.
Co-ordination with group leaders and Design engineers.
Working closely with other members of staff to produce clear drawings and designs to appropriate standards
ORGANIZATION AND PROJECTS:
1) SOBHA LIMITED, BANGALORE (DECEMBER 2018 TO TILL DATE).
Project
Sobha Lake Gardens, Medahalli
Position
Senior Survey engineer
Project information
Residential project having 9 Blocks (G+18 Floor), Club house, STP, UG Sump, car parking works.
foundation to ground floor conventional shuttering
Ground floor to 18th floor S- FORM Shuttering.
2) SPECIAL TECHNICAL SERVICES (STS) CO WLL, BAHRAIN (SEPTEMBER 2017 TO SEPTEMBER 2018).
Project
Civil works for substation, Transformer rectifier, Bus bar and Harmonic filters in Alba pot line 6 Project.
Position
Senior Land Surveyor
Client
Aluminum Bahrain(alba)
Main contractors
Bechtel,Fuji,Danway
Nature of work
Construction of transformer foundation, Substation buildings, oil pit walls, cable trenches, firewall (12.5m height), oil drain line, Retaining wall, Bus bar raft foundation, precast elements erection.
3) AL YAMAMA, KSA DAMMAM (OCT 2014 TO 10th APRIL 2017).
Project
Ministry of housing-south Dammam
Position
Senior Land Surveyor
Client
Ministry of Housing
Consultant
Saudi Arabian parsons limited
Nature of work
Construction of Collector Roads having total length of 12.5km and width 36.6m and North, south, east, west roads having total length of 9km and width of 50m,Local roads, irrigation and portable water tank and buildings,Sewer and storm line networks, manholes,house connections, Utilities,sidewalk, streetlight networks,substations,Road works(Embankment works, earthwork excavation, asplalt,aggregate base coarse,subbase,selectfill,etc.)
4) OMAN UNITED ENGINEERING SERVICES LLC(AUGUST 2010 TO AUGUST 2014).
A) PERIOD:- FEB 2013 TO AUGUST 2014.
Project
Design and construction of interchanges between Muscat international airport and the Muscat expressway.
Position
Land Surveyor
Consultant
Parsons international
Nature of work
Construction of interchanges, reinforced concrete retaining walls, Earthwork (fill and excavation), Road pavements, storm water drainage, cross drainage works, high fill slope protection with grouted stone riprap.
B) PERIOD:- SINCE NOVEMBER 2011 TO FEB 2013
Project
Construction of Access Road at Madinat Al Sultan Qaboos
Position
Land Surveyor
Client
Government of Oman
Consultant
PARSONS Transportation Group
Nature of work
Construction of 5.2 Km of Asphalt Road on Hill having a maximum cut depth of hill is up to 14 meter with Box and pipe culverts, storm drain ditches.
C) PERIOD: AUGUST 2010 TO OCTOBER 2011.
Project
Construction of Nakhal Roundabout.
Position
Land Surveyor
Client
Ministry of Transportation and Communications
Consultant
National Engineering Services Pakistan and partners
Nature of work
Construction of Round about including dual carriage way of Road for 1 km for the first arm and other arms with single carriage way for 1km on each side. Construction of Box culverts, pipe culverts and catch pits, Foot paths, Street light network and relocation of existing utilities.
5) .PERIOD: APRIL 2007 TO JULY 2010.
Organization
Geo Foundations & Structures Private limited, Chennai.
Project
L&T shipyard cum port,chettinad & sical conveyer projects
Position
Surveyor
Client
Larson and Turbo, Sical,chettinad
Nature of work
Construction of 2.5 km conveyor length both chettinad and sical from shipyard to stockyard. 0.5 km length L&T shipyard construction . (Land piles, marine piles, piles Cap, pedestals, precast elements, anchor bolt works).
6).PERIOD: OCTOBER 2004 TO MARCH 2007.
Organization
NEZ SURVEYS
Projects
National Highway,Railway,Contour,Private Property, Bridges,Khandaleru Reservoir left & Somasila to Khandaleru Flood flow canal
Position
Asst Surveyor
RESPONSIBILITIES:
Ogl levels & topo survey taking along the alignment.
Planning and monitoring day to day program.
Handling GPS, Total Station, Digital Level and all types of Survey Instruments.
Preparations of as built Drawings.
Preparation of Survey Reports.
Quality Assurance.
Preparation of working drawings.
Coordination with external Agencies.
EDUCATIONAL QUALIFICATIONS:-
1).B.tech RVD University
2). Diploma in civil Engineering (DCE), DOTE – Tamilnadu, (First class)
Year of passing: April 2004
OTHER QUALIFICATIONS
I) Computer Knowledge : Microsoft Word, Excel and AutoCAD, ESurvey cadd.
PERSONAL DATA
Date of Birth : 10.07.1985
Sex : Male
Marital Status : Married
Nationality & Religion : Indian & Hindu
Passport No : S7435239
Languages Known : English, Hindi, Tamil, and Telugu.
LICENSE : Holding OMAN (Light), SAUDI ARABIA and INDIA valid Driving licenses.
DECLERATION:-
The above given details are correct and true to the best of my knowledge belief and information.
Yours Faithfully,
Place :
Date :
(N.SURESH).