Post Job Free

Resume

Sign in

Engineer oil and gas industry

Location:
Avadi, Tamil Nadu, India
Posted:
December 05, 2020

Contact this candidate

Resume:

Name : CHINNUSAMI CHELLAMUTHU

DISCIPLINE : QA/QC ENGINEER.

LOCATION : CHENNAI,TAMILNADU,INDIA

QUALIFICATION :DIPLOMA IN MECHANICAL ENGINEERING.

:B.TECH ON GOING.

Email ID :adidc1@r.postjobfree.com.

Contact No : +918*********.

COURESEualification level : DIPLOMA IN MECHANICAL ENGINEERING.

Certifications /Training

1. SCWI(SENIOR WELDING INSPECTOR)

2. ASNT LEVEL-2 (RT,UT,MPI,PT,VT)

APPROVAL

1.GASCO : WELDING INSPECTOR.

2.QATAR PETROLUEM : Sr.WELDING INSPECTOR

LANGUAGE : TAMIL,ENGISH,HINDI

PROFILE

1. ORGANIZATION : APPLUS VELOSI (SAIPEM s.p.a)(india)

PROJECT : DUQUM REFINARY PROJECT(OMAN)

DESGINATION : THIRD PARTY INSPECTOR (india)- APPLUS VELOSI A (BALL VALVES,

GATE VALVES,CHECK VALVES, GLOBE VALVES,DBB VALVES,

DBB VALVES, BUTTERFLY VALVES, NEEDLE VALVES ETC..

PERIOD : SEP 2019 to STILL DATE.

2. ORGANIZATION : QATAR PETROLUEM.

PROJECT : HAMAD INTERNATIONAL AIRPORT JET A1 SUPPLY

PIPELINE PROJECT IN QATAR

DESGINATION : THIRD PARTY INSPECTOR-DNV-GL (STRUCTURAL, PIPE LINE

PIPING,EQUIPMENTS TANKS)

PERIOD : FEB 2017 to July 2019 .

3. ORGANIZATION : PETROFAC INTERNATIONAL LLC.UAE

PROJECT : UZ 750 ZADCO ISLAND SURFACE FACILITIES OFF SHORE. (Modular fabrication)

DESGINATION : SR. WELDING INSPECTOR

PERIOD : SEP 2014 – OCT 2016.

4.ORGANIZATION : PETROFAC INTERNATIONAL LLC.UAE

PROJECT : TURKMANISTAN ( GASPLANT)

DESIGNATION : QA/QC welding/Piping/Valves inspector( BALL VALVES, GATE VALVES,

GLOBE VALVES, BUTTERFLY VALVES NEEDLE VALVES ETC..

PERIOD : SEP 2012 TO MAR 2014

5..ORGANIZATION : KHARAFINATIONAL LLC ABUDHABI

PROJECT : HABSHAN 5 PROJECT.

DESIGNATION :QA/QC INSPECTOR.

PERIOD : JULY 2010 TO MAY 2012.

6.ORGANIZATION : PETRON ENGINEERING CONSTRUCTION LTD

PROJECT : PETROLEUM CORPORATION LIMITED (REFINERY)

DESIGNATION : SENIOR QA/QC COORDINATOR.

PERIOD : JUNE 2009 TO MAY 2010

7.ORGANIZATION : BETA INSPECTION SERVICE LTD,DUBAI

PROJECT : DEWA POWER PLANT PROJECT

DESIGNATION : QA/QC ENGINEER.

PERIOD : AUGUST 2008 TO MAY 2009.

8.ORGANIZATION : TRADING AGENCY AND SEVICES.LTD

PROJECT : RAS GAS PLANT PROJECT(OFFSHORE)

DESIGNATION : WELDING INSPECTOR

PERIOD : MAY 2008 TO JULY 2008

9.ORGANIZATION : EMIRATES BUILDING SYSTEM. DUBAI

PROJECT : PETROFAC, GASCo, DUBAI METRI, SAUDI ARAMCO

DESIGNATION : QA/QC inspector QA/QC INSPECTOR

PERIOD : SEP 2006 TO MAR 2008.

10.ORGANIZATION : SYSTEM AND COMPONENTS INDIA LTD

PROJECT : REFRIGERTORS

DESIGNATION : Sr.QC ENGINEER PIPING & WELDING&EQUIPMENTS.

PERIOD : JULY 2004 TO AUG 2006.

11.ORGANIZATION : TARA PORE & COMPANY

PROJECT : DELHI METRO PROJECT

DESIGNATION : QA/QC ENGINEER

PERIOD : AUG 2000 TO JUNE 2004.

12.ORGANIZATION : AUTO PRINT MANUFACTURING PRIVATE LTD

PROJECT : TOYO JAPAN PROJECT

DESIGNATION : QA/QC ENGINEER

PERIOD : MAY 1998 TO JULY 2000.

13.ORGANIZATION : DAS LAGER WAY INDIA LTD

PROJECT : WIND MILL TOWER PROJECT

DESIGNATION : QA/QC ENGINEER

PERIOD : JUNE 1995 TO APRIL 1998.

14.ORGANIZATION : AZTEC FABRICATIONS

PROJECT : BHEL

DESIGNATION : PRODUCTION ENGINEER

PERIOD : MAR 1993 TO MAR 1995.

Responsibilities:

ORGANIZATION : APPLUS VELOSI

PROJECT : DQUM REFINARY PROJECT(SAIPEM S.P.A)

DESGINATION : THIRD PARTY INSPECTOR (VALVES/PIPING/WELDING/NDT)

PERIOD : SEP 2019 – AT PRESENT

Key Deliverables

Incoming material inspection and verification of MTC.

ASME31.3 piping, witness of welder qualification.

Reviewing base metal filler metal and flux test Certificate.

Review of,WPS,PQR,WQT, documents.

Witnessing WPS/PQR,WQT, NDT performance.

Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT.

Inspection of for casting,forging (body,bonnet,disc,stem,steat&ring etc..

Reviewing of all doucments procedures like(MTC, hydro,painting NDT( RT,UT,MPT,PT)

Witnessing of final valves inspection Hydrotest,painting&packing,like(ball valves,globe valves,gate valves, check valves etc..

Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing.

Responsible for witnessing PWHT, preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.

Radiography Film Interpretation.

Review of Test pack and Hydro Testing.

ORGANIZATION : QATAR PETROLUEM

PROJECT : HAMAD INTERNATIONAL AIRPORT JET A1 SUPPLY

PIPELINE PROJECT IN QATAR

DESGINATION : QA/QC ENGINEER-DNV-GL (STRUCTURAL, PIPE LINE,PIPING

& TANKS)

PERIOD : FEB 2017 to july 2019 .

Key Deliverables

Onshore transmission pipeline welding as per standard specifies Qatar petroleum requirements and supplement standard API 1104. The pipeline transmission based as per standard around 132kilometres raslafan refinery plant to hamad international airport in Qatar.

Performed various inspections and expediting activities of Pressure Vessel Columns, Heat Exchangers,Skids,Mechanical (Rotating Equipment), Pumps, Compressors, Turbine, Valves,Pipes,Fittings,General Fabrication frams,Structures etc

Verifications of vendor compliances according to purchase order and specifications.

Witnessing the mechanical test required to qualify the materials

Preparation and qualification of WPS, PQR & WPQR as per ASME Sec IX and relevant Project Specification.

Surveillance inspection during the fabrication & welding of Tanks,structural,Pipeline and piping

Preparation of Quality Control Plan, Quality control procedures and method statements.

Receiving inspection of raw materials, welding consumables and bought out materials

Monitor Contractor’s and subcontractor’s work activities for compliance with quality requirement as per QAP/ITP.

Notify the non conformance observed during the inspection and recommending corrective action.

Conversant with ASME Sec VIII, Sec IX, Sec. V, Sec IIA/B/C, API 650, ASME B31.3,B31.4, B31.1, IBR.

Review of radiographic films, monitor and control of weld repair rate by analyzing the repairs.

Witnessing of mechanical testing of simulated plates, fit-up & final inspection of pressure vessel, NDE activity like Ultrasonic Examination, Magnetic Particle examination & Dye Penetrant examination as per Approved procedure & Project Specification

Execution of all intermediate and final Dimensional inspections in fabrication shops as per requirements of the approved drawings & Quality plane.

Checking the correctness of materials being used and ensuring traceability.

Compilation of quality control documents and submission as a final dossier’s to Client.

ORGANIZATION : PETROFAC INTERNATIONAL LLC. UAE

PROJECT : UZ 750 ZADCO ISLAND SURFACE FACILITIES PROJECT (Modular

fabrication OFFSHORE)

DESGINATION : SR. WELDING,PIPING INSPECTOR

PERIOD : SEP 2014 – OCT 2016

Key Deliverables

Incoming material inspection and verification of MTC.

Structure AWS D 1.1& ASME31.3 piping, witness of welder qualification.

Reviewing base metal filler metal and flux test Certificate.

Review of,WPS,PQR,WQT, documents.

Witnessing WPS/PQR,WQT, NDT performance.

Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT.

Inspection of for fit up, weld visual inspection and final inspection for, CS, LTCS, . SS 316, 316L, Cladded CRA, soild CRA, CuNi etc.

Reviewing of NDT procedures like( RT,UT,MPT,PT)

Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing.

Responsible for witnessing PWHT, preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.

Radiography Film Interpretation.

Review of Test pack and Hydro Testing.

ORGANIZATION : PETROFAC INTERNATIONAL LLC.UAE

PROJECT : TURKMANISTAN (GASPLANT)

DESIGNATION : QA/QC welding/Piping/valves/NDT Inspector

PERIOD : SEP 2012 TO MAR 2014

Key Deliverables

Involved in stage inspection of piping and structures as per drawing

Reviewing base metal filler metal and flux test Certificate

Reviewing QAP,WPS,PQR documents

Inspection of incoming raw materials, erected structures.

Witnessing WPQ,PQR, NDT performance

Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT

Accountable for fit up, welding inspection and final inspection for CRA,CARBON steels, SS 316, 316L etc.

Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing

Responsible for witnessing PWHT,preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.

Radiography Film Interpretation.

Review of Test pack and Hydro Testing.

Inspection of for casting,forging (body,bonnet,disc,stem,steat&ring etc..

Reviewing of all doucments procedures like(MTC, hydro,painting NDT( RT,UT,MPT,PT)

Witnessing of final valves inspection Hydrotest,painting&packing,like(ball valves,globe valves,gate valves, check valves etc..

Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing.

Responsible for witnessing PWHT, preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.

Radiography Film Interpretation.

Review of Test pack and Hydro Testing.

ORGANIZATION : KHARAFINATIONAL COMPANY LLC. ABUDHABI

PROJECT : HABSHAN 5 PROJECT

DESIGNATION :Sr. QA/QC PIPING & STRUCTURAL’S/WELDING INSPECTOR

(GASCOAPPROVED)

PERIOD : July 2010 TO May 2012

Key Deliverables

Involved in stage inspection of piping and structures as per drawing

Reviewing base metal filler metal and flux test Certificate

Reviewing QAP,WPS,PQR documents

Inspection of incoming raw materials, erected structures, rails

Witnessing WPQ,PQR, NDT performance

Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT

Accountable for fit up, welding inspection and final inspection for LTCS, P11,P22 etc. low and high alloy steels, SS 316, 316L etc.

Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing

Responsible for witnessing PWHT,preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.

Radiography Film Interpretation

ORGANIZATION : PETRON ENGINEERING CONSTRUCTION LTD

PROJECT : PETROLEUM CORPORATION LIMITED (shut down REFINERY)

DESIGNATION : SENIOR QA/QC ENGINEER

PERIOD : JUNE 2009 TO MAY 2010

Key Deliverables

Witnessing the PQR, test results, train the welders to follow the WPS effectively through welder orientation programs

Review the test certificate of filler metal and consumable, shielding gases as per WPS

Instrumental in reviewing the mill test certificate of materials being used at site with respect to heat number, material type as per the associated design data and drawings, etc.

Reviewing of welding procedures specification (WPS) and procedure qualification record (PQR)

Responsible for witness to the welder qualification test (6G,4G,3G,2G) and monitoring all parameter as per WPS (current,voltage,traveling speed)

Involved in preparing welder performance test record and welder ID card Monitoring welder performance and discussions with client as well as subcontractors for improvements etc. in production quality

Instrumental in piping inspection with respect to internal and external alignment, root gap bevel angel, Groove angle as per approved drawings, applicable WPS, project specifications

Involved in visual Inspection of welding of pipe and structure as per code requirement

Especially witnessed Nondestructive testing of pipes, piping welds, structural’s: T, K, Y joints etc

ORGANIZATION : DOOSAN HEAVY INDUSTRIES CONSTRUCTION LTD,DUBAI (BETA INSPECTION SERVICE)

PROJECT : DEWA POWER PLANT PROJECT

DESIGNATION : QA/QC ENGINEER.

PERIOD : AUGUST 2008 TO MAY 2009

Key Deliverables

Accountable for inspecting the materials regarding Traceability, Physical condition and drawing requirement

Instrumental in reviewing WPS /PQR / Welder Qualification records

Inspecting Joint Configuration of Fit up prior to weld as per WPS

Responsible for checking alignment/Orientation of pipes as per ISO drawing

Monitoring calibration status of welding machines, Inspection tools,

Witnessing the NDT methods and PWHT process, surveillance of welding parameters/consumables for compliance with WPS.

Responsible for brainstorming the welder about the techniques to improve quality

ORGANIZATION : TRADING AGENCY AND SEVICES.LTD

PROJECT : RAS GAS PLANT PROJECT(OFFSHORE)

DESIGNATION : WELDING INSPECTOR

PERIOD : MAR 2008 TO JULY 2008

Key Deliverables

Involved in stage inspection of piping and structures as per drawing

Reviewing base metal filler metal and flux test Certificate

Reviewing QAP,WPS,PQR documents

Inspection of incoming raw materials, erected structures, rails

Witnessing WPQ,PQR, NDT performance

Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT

Accountable for fit up, welding inspection and final inspection for LTCS, P11,P22 etc. low and high alloy steels, SS 316, 316L etc.

Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing

Monitoring welder performance and discussions with client as well as subcontractors for improvements etc. in production quality

Instrumental in piping inspection with respect to internal and external alignment, root gap bevel angel, Groove angle as per approved drawings, applicable WPS, project specifications

Involved in visual Inspection of welding of pipe and structure as per code requirement

Especially witnessed Nondestructive testing of pipes, piping welds, structural’s: T, K, Y joints etc

ORGANIZATION : EMIRATES BUILDING SYSTEM (DUBAI)

PROJECT : PETROFAC, GASCO, DUBAI METRO, SAUDI ARAMCO

DESIGNATION : Sr.QA/QC inspector.

PERIOD : SEP 2006 TO FEB2008

Key Deliverables

Welding Procedures + Welder Qualification & Weld Visual Inspection.

Inspection of incoming paints and abrasives and ensuring it is in accordance with the job specification.

Incoming Material Inspection like, Plate, Pipes, Fittings, Forgings, Valves etc….

Maintaining Material, Inspection, Testing, Project, Production Status.

Monitoring welding consumables as per QC procedures

Weld Visual Inspection as well as Receiving Material Inspection & Review of MaterialTest Certificates.

Stage by Stage fit up& welding inspection like., plates, beam, column. Etc...

Pipe rack structural’s of fabrication and assembly &erection carried out as per specification

Co – Ordinations of NDT Activities & Maintaining Status.

Witness of welding machine calibration.

Carrying out painter qualification test and maintaining the records.

Witnessing blotter paper test (ASTM D 4285) and checking the blasting pressure to ensure it is as specified

Inspection of field activity likemonitoring atmospheric conditions (ASTM E 337), assessment ofsurface cleanliness (ISO 8502-3), and surface profile check (NACE RP0287), proper mixing of paint system, WFT, and DFT as per approvedprocedure.

Carrying out 100% visual inspection for any coating failures and ensuring it is rectified before the materials leave the painting yard.

Witnessing and performing soluble salt contamination tests (ISO 8502-6), DFT Check (SSPC PA2),roper storage of the paint system and abrasives as per the specification.

Performing destructive tests like dolly pull off test ASTM D 4541 if specified.

Doing Vendor / Supplier approval in Quality as well purchase point of view

Preparation of final inspection reports and submission to QA/QC document controller.

ORGANIZATION : SYSTEM AND COMPONENTS INDIA LTD

PROJECT : REFRIGERTORS

DESIGNATION : Sr.QC ENGINEER PIPING & WELDING

PERIOD : JULY 2004 TO AUG 2006

Key Deliverables

Monitoring calibration status of welding machines, Inspection tools, Quivers, Witnessing the welder qualifications.

Inspection of equipments Oil separator, Heat Exchanger, Oil cooler Economizer.

Reviewing of welding procedures specification (WPS) and procedure qualification record (PQR).

Inspection of Raw materials.

Elaborating and coordinating the welding specifications, and codes/standards

Coordination with the field subcontractors for all welding procedure specifications and procedures qualifications reports

Review course and effects of welding defects and take remedial actions

Coordination with the field subcontractors and the Third Party NDT Inspection Company

Review of the radiographic film and all NDT reports on a daily basis

Auditing of the approved Third Party NDT Inspection Company

Reviewing the inspection and testing methods and procedures for Radiographic, Dye Penetrant, Magnetic Particle, and Ultrasonic inspections

Witnessing of welder qualifications testing and procedures qualification testing

Witnessing any remedial repair welding

Reviewing of the welding summery reports

Checking the hydrostatic test packages for NDT compliance prior to testing

Advising the site subcontractors with regards to welding and testing

Monitor any Post Weld Heat Treatment on site and review the completed test reporting

Selection of welds for non destructive testing

Recording and listing of defective welds

Monitor the control and issue of welding electrodes

Control the QC site welding inspectors

Actively monitor site radiation safety

Review day to day applications for x-raying of welds

Coordinate the issue of nonconformance reports through the site QC manager

Compete site quality instructions to sub contractors when required

ORGANIZATION : TARA PORE & COMPANY

PROJECT : DELHI METRO PROJECT

DESIGNATION : QA/QC ENGINEER

PERIOD : AUG 2000 TO JUNE 2004

Key Deliverables

Review the test certificate of filler metal and consumable, shielding gases as per wps.

Review the mill test certificate of materials being used at site with respect to heat number, material type as per the associated design data and drawings, etc.

Reviewing of welding procedures specification (WPS) and procedure qualification record (PQR).

Witness to the welder qualification test (6G,4G,3G,2G) and monitoring all parameter as per WPS (current,voltage,traveling speed) Successfully reduction of welder repair rate by conducting the welder orientation program

Assured quality by making effective hold points particularly in T, Y, K joints

Successful implementation of routing for documentation for sustainable growth with ISO auditing

Effectively leading the quality control team to reduce loss and increase gain by arranging proper training

ORGANIZATION : AUTO PRINT MANUFACTURING PRIVATE LTD

PROJECT : TOYO JAPAN PROJECT

DESIGNATION : QA/QC ENGINEER

PERIOD : MAY 1998 TO JULY 2000

Key Deliverables

As a part of Inspection all NDT activities are handled.

Plan the inspection activities as per Inspection Plan.

Preparation of Inspection Plan based on the project specification.

Reviewing the Material/Consumables Test Certificate as per code, Customer Specification.

Qualifying the welders, Welding Procedures.

WPS review and testing arrangements based on the time to time project Requirements. Attend

the meeting of shop floor level and clients meeting and vendor development

ORGANIZATION : DAS LAGER WAY INDIA LTD

PROJECT : WIND MILL TOWER PROJECT

DESIGNATION : QA/QC ENGINEER

PERIOD : JUNE 1995 TO APRIL 1998

Key Deliverables

As a part of Inspection all NDT activities are handled.

Plan the inspection activities as per Inspection Plan.

Preparation of Inspection Plan based on the project specification.

Reviewing the Material/Consumables Test Certificate as per code, Customer Specification

Qualifying the welders, Welding Procedures.

WPS review and testing arrangements based on the time to time project Requirements.

Attend the meeting of shop floor level and clients meeting. And vendor development

ORGANIZATION : AZTEC FABRICATIONS

PROJECT : BHEL

DESIGNATION : PRODUCTION ENGINEER

PERIOD : MAR 1993 TO MAR 1995

Key Deliverables

Review of client specification and drawing before marking for Quality plan.

Preparing the daily progressive report, and daily man power report and control the lab our activities.

PERSONAL DETAILS

Date of Birth : 15.05.1971

Nationality : Indian

Marital Status : Married

Passport No : Z3339071

& Validity : Up to 08.08.2026 Issued at Musct-Oman

Address for communication

CHINNUSAMI CHELLAMUTHU

PLOT NO 5, SHRI SAI ILLAM,

THIRUNANDAVANAM 1 ST STREET,

BALAJI NAGAR, PATTABIRAM

CHENNAI 600072,TAMILNADU,INDIA

Email :adidc1@r.postjobfree.com

MOBILE:+918*********.



Contact this candidate