Name : CHINNUSAMI CHELLAMUTHU
DISCIPLINE : QA/QC ENGINEER.
LOCATION : CHENNAI,TAMILNADU,INDIA
QUALIFICATION :DIPLOMA IN MECHANICAL ENGINEERING.
:B.TECH ON GOING.
Email ID :adidc1@r.postjobfree.com.
Contact No : +918*********.
COURESEualification level : DIPLOMA IN MECHANICAL ENGINEERING.
Certifications /Training
1. SCWI(SENIOR WELDING INSPECTOR)
2. ASNT LEVEL-2 (RT,UT,MPI,PT,VT)
APPROVAL
1.GASCO : WELDING INSPECTOR.
2.QATAR PETROLUEM : Sr.WELDING INSPECTOR
LANGUAGE : TAMIL,ENGISH,HINDI
PROFILE
1. ORGANIZATION : APPLUS VELOSI (SAIPEM s.p.a)(india)
PROJECT : DUQUM REFINARY PROJECT(OMAN)
DESGINATION : THIRD PARTY INSPECTOR (india)- APPLUS VELOSI A (BALL VALVES,
GATE VALVES,CHECK VALVES, GLOBE VALVES,DBB VALVES,
DBB VALVES, BUTTERFLY VALVES, NEEDLE VALVES ETC..
PERIOD : SEP 2019 to STILL DATE.
2. ORGANIZATION : QATAR PETROLUEM.
PROJECT : HAMAD INTERNATIONAL AIRPORT JET A1 SUPPLY
PIPELINE PROJECT IN QATAR
DESGINATION : THIRD PARTY INSPECTOR-DNV-GL (STRUCTURAL, PIPE LINE
PIPING,EQUIPMENTS TANKS)
PERIOD : FEB 2017 to July 2019 .
3. ORGANIZATION : PETROFAC INTERNATIONAL LLC.UAE
PROJECT : UZ 750 ZADCO ISLAND SURFACE FACILITIES OFF SHORE. (Modular fabrication)
DESGINATION : SR. WELDING INSPECTOR
PERIOD : SEP 2014 – OCT 2016.
4.ORGANIZATION : PETROFAC INTERNATIONAL LLC.UAE
PROJECT : TURKMANISTAN ( GASPLANT)
DESIGNATION : QA/QC welding/Piping/Valves inspector( BALL VALVES, GATE VALVES,
GLOBE VALVES, BUTTERFLY VALVES NEEDLE VALVES ETC..
PERIOD : SEP 2012 TO MAR 2014
5..ORGANIZATION : KHARAFINATIONAL LLC ABUDHABI
PROJECT : HABSHAN 5 PROJECT.
DESIGNATION :QA/QC INSPECTOR.
PERIOD : JULY 2010 TO MAY 2012.
6.ORGANIZATION : PETRON ENGINEERING CONSTRUCTION LTD
PROJECT : PETROLEUM CORPORATION LIMITED (REFINERY)
DESIGNATION : SENIOR QA/QC COORDINATOR.
PERIOD : JUNE 2009 TO MAY 2010
7.ORGANIZATION : BETA INSPECTION SERVICE LTD,DUBAI
PROJECT : DEWA POWER PLANT PROJECT
DESIGNATION : QA/QC ENGINEER.
PERIOD : AUGUST 2008 TO MAY 2009.
8.ORGANIZATION : TRADING AGENCY AND SEVICES.LTD
PROJECT : RAS GAS PLANT PROJECT(OFFSHORE)
DESIGNATION : WELDING INSPECTOR
PERIOD : MAY 2008 TO JULY 2008
9.ORGANIZATION : EMIRATES BUILDING SYSTEM. DUBAI
PROJECT : PETROFAC, GASCo, DUBAI METRI, SAUDI ARAMCO
DESIGNATION : QA/QC inspector QA/QC INSPECTOR
PERIOD : SEP 2006 TO MAR 2008.
10.ORGANIZATION : SYSTEM AND COMPONENTS INDIA LTD
PROJECT : REFRIGERTORS
DESIGNATION : Sr.QC ENGINEER PIPING & WELDING&EQUIPMENTS.
PERIOD : JULY 2004 TO AUG 2006.
11.ORGANIZATION : TARA PORE & COMPANY
PROJECT : DELHI METRO PROJECT
DESIGNATION : QA/QC ENGINEER
PERIOD : AUG 2000 TO JUNE 2004.
12.ORGANIZATION : AUTO PRINT MANUFACTURING PRIVATE LTD
PROJECT : TOYO JAPAN PROJECT
DESIGNATION : QA/QC ENGINEER
PERIOD : MAY 1998 TO JULY 2000.
13.ORGANIZATION : DAS LAGER WAY INDIA LTD
PROJECT : WIND MILL TOWER PROJECT
DESIGNATION : QA/QC ENGINEER
PERIOD : JUNE 1995 TO APRIL 1998.
14.ORGANIZATION : AZTEC FABRICATIONS
PROJECT : BHEL
DESIGNATION : PRODUCTION ENGINEER
PERIOD : MAR 1993 TO MAR 1995.
Responsibilities:
ORGANIZATION : APPLUS VELOSI
PROJECT : DQUM REFINARY PROJECT(SAIPEM S.P.A)
DESGINATION : THIRD PARTY INSPECTOR (VALVES/PIPING/WELDING/NDT)
PERIOD : SEP 2019 – AT PRESENT
Key Deliverables
Incoming material inspection and verification of MTC.
ASME31.3 piping, witness of welder qualification.
Reviewing base metal filler metal and flux test Certificate.
Review of,WPS,PQR,WQT, documents.
Witnessing WPS/PQR,WQT, NDT performance.
Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT.
Inspection of for casting,forging (body,bonnet,disc,stem,steat&ring etc..
Reviewing of all doucments procedures like(MTC, hydro,painting NDT( RT,UT,MPT,PT)
Witnessing of final valves inspection Hydrotest,painting&packing,like(ball valves,globe valves,gate valves, check valves etc..
Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing.
Responsible for witnessing PWHT, preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.
Radiography Film Interpretation.
Review of Test pack and Hydro Testing.
ORGANIZATION : QATAR PETROLUEM
PROJECT : HAMAD INTERNATIONAL AIRPORT JET A1 SUPPLY
PIPELINE PROJECT IN QATAR
DESGINATION : QA/QC ENGINEER-DNV-GL (STRUCTURAL, PIPE LINE,PIPING
& TANKS)
PERIOD : FEB 2017 to july 2019 .
Key Deliverables
Onshore transmission pipeline welding as per standard specifies Qatar petroleum requirements and supplement standard API 1104. The pipeline transmission based as per standard around 132kilometres raslafan refinery plant to hamad international airport in Qatar.
Performed various inspections and expediting activities of Pressure Vessel Columns, Heat Exchangers,Skids,Mechanical (Rotating Equipment), Pumps, Compressors, Turbine, Valves,Pipes,Fittings,General Fabrication frams,Structures etc
Verifications of vendor compliances according to purchase order and specifications.
Witnessing the mechanical test required to qualify the materials
Preparation and qualification of WPS, PQR & WPQR as per ASME Sec IX and relevant Project Specification.
Surveillance inspection during the fabrication & welding of Tanks,structural,Pipeline and piping
Preparation of Quality Control Plan, Quality control procedures and method statements.
Receiving inspection of raw materials, welding consumables and bought out materials
Monitor Contractor’s and subcontractor’s work activities for compliance with quality requirement as per QAP/ITP.
Notify the non conformance observed during the inspection and recommending corrective action.
Conversant with ASME Sec VIII, Sec IX, Sec. V, Sec IIA/B/C, API 650, ASME B31.3,B31.4, B31.1, IBR.
Review of radiographic films, monitor and control of weld repair rate by analyzing the repairs.
Witnessing of mechanical testing of simulated plates, fit-up & final inspection of pressure vessel, NDE activity like Ultrasonic Examination, Magnetic Particle examination & Dye Penetrant examination as per Approved procedure & Project Specification
Execution of all intermediate and final Dimensional inspections in fabrication shops as per requirements of the approved drawings & Quality plane.
Checking the correctness of materials being used and ensuring traceability.
Compilation of quality control documents and submission as a final dossier’s to Client.
ORGANIZATION : PETROFAC INTERNATIONAL LLC. UAE
PROJECT : UZ 750 ZADCO ISLAND SURFACE FACILITIES PROJECT (Modular
fabrication OFFSHORE)
DESGINATION : SR. WELDING,PIPING INSPECTOR
PERIOD : SEP 2014 – OCT 2016
Key Deliverables
Incoming material inspection and verification of MTC.
Structure AWS D 1.1& ASME31.3 piping, witness of welder qualification.
Reviewing base metal filler metal and flux test Certificate.
Review of,WPS,PQR,WQT, documents.
Witnessing WPS/PQR,WQT, NDT performance.
Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT.
Inspection of for fit up, weld visual inspection and final inspection for, CS, LTCS, . SS 316, 316L, Cladded CRA, soild CRA, CuNi etc.
Reviewing of NDT procedures like( RT,UT,MPT,PT)
Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing.
Responsible for witnessing PWHT, preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.
Radiography Film Interpretation.
Review of Test pack and Hydro Testing.
ORGANIZATION : PETROFAC INTERNATIONAL LLC.UAE
PROJECT : TURKMANISTAN (GASPLANT)
DESIGNATION : QA/QC welding/Piping/valves/NDT Inspector
PERIOD : SEP 2012 TO MAR 2014
Key Deliverables
Involved in stage inspection of piping and structures as per drawing
Reviewing base metal filler metal and flux test Certificate
Reviewing QAP,WPS,PQR documents
Inspection of incoming raw materials, erected structures.
Witnessing WPQ,PQR, NDT performance
Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT
Accountable for fit up, welding inspection and final inspection for CRA,CARBON steels, SS 316, 316L etc.
Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing
Responsible for witnessing PWHT,preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.
Radiography Film Interpretation.
Review of Test pack and Hydro Testing.
Inspection of for casting,forging (body,bonnet,disc,stem,steat&ring etc..
Reviewing of all doucments procedures like(MTC, hydro,painting NDT( RT,UT,MPT,PT)
Witnessing of final valves inspection Hydrotest,painting&packing,like(ball valves,globe valves,gate valves, check valves etc..
Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing.
Responsible for witnessing PWHT, preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.
Radiography Film Interpretation.
Review of Test pack and Hydro Testing.
ORGANIZATION : KHARAFINATIONAL COMPANY LLC. ABUDHABI
PROJECT : HABSHAN 5 PROJECT
DESIGNATION :Sr. QA/QC PIPING & STRUCTURAL’S/WELDING INSPECTOR
(GASCOAPPROVED)
PERIOD : July 2010 TO May 2012
Key Deliverables
Involved in stage inspection of piping and structures as per drawing
Reviewing base metal filler metal and flux test Certificate
Reviewing QAP,WPS,PQR documents
Inspection of incoming raw materials, erected structures, rails
Witnessing WPQ,PQR, NDT performance
Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT
Accountable for fit up, welding inspection and final inspection for LTCS, P11,P22 etc. low and high alloy steels, SS 316, 316L etc.
Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing
Responsible for witnessing PWHT,preheating chart, interpose temperature and welder qualification test, by rising NCR,FOR for the technical malpractices.
Radiography Film Interpretation
ORGANIZATION : PETRON ENGINEERING CONSTRUCTION LTD
PROJECT : PETROLEUM CORPORATION LIMITED (shut down REFINERY)
DESIGNATION : SENIOR QA/QC ENGINEER
PERIOD : JUNE 2009 TO MAY 2010
Key Deliverables
Witnessing the PQR, test results, train the welders to follow the WPS effectively through welder orientation programs
Review the test certificate of filler metal and consumable, shielding gases as per WPS
Instrumental in reviewing the mill test certificate of materials being used at site with respect to heat number, material type as per the associated design data and drawings, etc.
Reviewing of welding procedures specification (WPS) and procedure qualification record (PQR)
Responsible for witness to the welder qualification test (6G,4G,3G,2G) and monitoring all parameter as per WPS (current,voltage,traveling speed)
Involved in preparing welder performance test record and welder ID card Monitoring welder performance and discussions with client as well as subcontractors for improvements etc. in production quality
Instrumental in piping inspection with respect to internal and external alignment, root gap bevel angel, Groove angle as per approved drawings, applicable WPS, project specifications
Involved in visual Inspection of welding of pipe and structure as per code requirement
Especially witnessed Nondestructive testing of pipes, piping welds, structural’s: T, K, Y joints etc
ORGANIZATION : DOOSAN HEAVY INDUSTRIES CONSTRUCTION LTD,DUBAI (BETA INSPECTION SERVICE)
PROJECT : DEWA POWER PLANT PROJECT
DESIGNATION : QA/QC ENGINEER.
PERIOD : AUGUST 2008 TO MAY 2009
Key Deliverables
Accountable for inspecting the materials regarding Traceability, Physical condition and drawing requirement
Instrumental in reviewing WPS /PQR / Welder Qualification records
Inspecting Joint Configuration of Fit up prior to weld as per WPS
Responsible for checking alignment/Orientation of pipes as per ISO drawing
Monitoring calibration status of welding machines, Inspection tools,
Witnessing the NDT methods and PWHT process, surveillance of welding parameters/consumables for compliance with WPS.
Responsible for brainstorming the welder about the techniques to improve quality
ORGANIZATION : TRADING AGENCY AND SEVICES.LTD
PROJECT : RAS GAS PLANT PROJECT(OFFSHORE)
DESIGNATION : WELDING INSPECTOR
PERIOD : MAR 2008 TO JULY 2008
Key Deliverables
Involved in stage inspection of piping and structures as per drawing
Reviewing base metal filler metal and flux test Certificate
Reviewing QAP,WPS,PQR documents
Inspection of incoming raw materials, erected structures, rails
Witnessing WPQ,PQR, NDT performance
Review of shielding gases, cutting gases TC, calibration status of machineries of welding and NDT
Accountable for fit up, welding inspection and final inspection for LTCS, P11,P22 etc. low and high alloy steels, SS 316, 316L etc.
Reviewing positive material identification (PMI), and post weld heat treatment (PWHT) and hardness testing
Monitoring welder performance and discussions with client as well as subcontractors for improvements etc. in production quality
Instrumental in piping inspection with respect to internal and external alignment, root gap bevel angel, Groove angle as per approved drawings, applicable WPS, project specifications
Involved in visual Inspection of welding of pipe and structure as per code requirement
Especially witnessed Nondestructive testing of pipes, piping welds, structural’s: T, K, Y joints etc
ORGANIZATION : EMIRATES BUILDING SYSTEM (DUBAI)
PROJECT : PETROFAC, GASCO, DUBAI METRO, SAUDI ARAMCO
DESIGNATION : Sr.QA/QC inspector.
PERIOD : SEP 2006 TO FEB2008
Key Deliverables
Welding Procedures + Welder Qualification & Weld Visual Inspection.
Inspection of incoming paints and abrasives and ensuring it is in accordance with the job specification.
Incoming Material Inspection like, Plate, Pipes, Fittings, Forgings, Valves etc….
Maintaining Material, Inspection, Testing, Project, Production Status.
Monitoring welding consumables as per QC procedures
Weld Visual Inspection as well as Receiving Material Inspection & Review of MaterialTest Certificates.
Stage by Stage fit up& welding inspection like., plates, beam, column. Etc...
Pipe rack structural’s of fabrication and assembly &erection carried out as per specification
Co – Ordinations of NDT Activities & Maintaining Status.
Witness of welding machine calibration.
Carrying out painter qualification test and maintaining the records.
Witnessing blotter paper test (ASTM D 4285) and checking the blasting pressure to ensure it is as specified
Inspection of field activity likemonitoring atmospheric conditions (ASTM E 337), assessment ofsurface cleanliness (ISO 8502-3), and surface profile check (NACE RP0287), proper mixing of paint system, WFT, and DFT as per approvedprocedure.
Carrying out 100% visual inspection for any coating failures and ensuring it is rectified before the materials leave the painting yard.
Witnessing and performing soluble salt contamination tests (ISO 8502-6), DFT Check (SSPC PA2),roper storage of the paint system and abrasives as per the specification.
Performing destructive tests like dolly pull off test ASTM D 4541 if specified.
Doing Vendor / Supplier approval in Quality as well purchase point of view
Preparation of final inspection reports and submission to QA/QC document controller.
ORGANIZATION : SYSTEM AND COMPONENTS INDIA LTD
PROJECT : REFRIGERTORS
DESIGNATION : Sr.QC ENGINEER PIPING & WELDING
PERIOD : JULY 2004 TO AUG 2006
Key Deliverables
Monitoring calibration status of welding machines, Inspection tools, Quivers, Witnessing the welder qualifications.
Inspection of equipments Oil separator, Heat Exchanger, Oil cooler Economizer.
Reviewing of welding procedures specification (WPS) and procedure qualification record (PQR).
Inspection of Raw materials.
Elaborating and coordinating the welding specifications, and codes/standards
Coordination with the field subcontractors for all welding procedure specifications and procedures qualifications reports
Review course and effects of welding defects and take remedial actions
Coordination with the field subcontractors and the Third Party NDT Inspection Company
Review of the radiographic film and all NDT reports on a daily basis
Auditing of the approved Third Party NDT Inspection Company
Reviewing the inspection and testing methods and procedures for Radiographic, Dye Penetrant, Magnetic Particle, and Ultrasonic inspections
Witnessing of welder qualifications testing and procedures qualification testing
Witnessing any remedial repair welding
Reviewing of the welding summery reports
Checking the hydrostatic test packages for NDT compliance prior to testing
Advising the site subcontractors with regards to welding and testing
Monitor any Post Weld Heat Treatment on site and review the completed test reporting
Selection of welds for non destructive testing
Recording and listing of defective welds
Monitor the control and issue of welding electrodes
Control the QC site welding inspectors
Actively monitor site radiation safety
Review day to day applications for x-raying of welds
Coordinate the issue of nonconformance reports through the site QC manager
Compete site quality instructions to sub contractors when required
ORGANIZATION : TARA PORE & COMPANY
PROJECT : DELHI METRO PROJECT
DESIGNATION : QA/QC ENGINEER
PERIOD : AUG 2000 TO JUNE 2004
Key Deliverables
Review the test certificate of filler metal and consumable, shielding gases as per wps.
Review the mill test certificate of materials being used at site with respect to heat number, material type as per the associated design data and drawings, etc.
Reviewing of welding procedures specification (WPS) and procedure qualification record (PQR).
Witness to the welder qualification test (6G,4G,3G,2G) and monitoring all parameter as per WPS (current,voltage,traveling speed) Successfully reduction of welder repair rate by conducting the welder orientation program
Assured quality by making effective hold points particularly in T, Y, K joints
Successful implementation of routing for documentation for sustainable growth with ISO auditing
Effectively leading the quality control team to reduce loss and increase gain by arranging proper training
ORGANIZATION : AUTO PRINT MANUFACTURING PRIVATE LTD
PROJECT : TOYO JAPAN PROJECT
DESIGNATION : QA/QC ENGINEER
PERIOD : MAY 1998 TO JULY 2000
Key Deliverables
As a part of Inspection all NDT activities are handled.
Plan the inspection activities as per Inspection Plan.
Preparation of Inspection Plan based on the project specification.
Reviewing the Material/Consumables Test Certificate as per code, Customer Specification.
Qualifying the welders, Welding Procedures.
WPS review and testing arrangements based on the time to time project Requirements. Attend
the meeting of shop floor level and clients meeting and vendor development
ORGANIZATION : DAS LAGER WAY INDIA LTD
PROJECT : WIND MILL TOWER PROJECT
DESIGNATION : QA/QC ENGINEER
PERIOD : JUNE 1995 TO APRIL 1998
Key Deliverables
As a part of Inspection all NDT activities are handled.
Plan the inspection activities as per Inspection Plan.
Preparation of Inspection Plan based on the project specification.
Reviewing the Material/Consumables Test Certificate as per code, Customer Specification
Qualifying the welders, Welding Procedures.
WPS review and testing arrangements based on the time to time project Requirements.
Attend the meeting of shop floor level and clients meeting. And vendor development
ORGANIZATION : AZTEC FABRICATIONS
PROJECT : BHEL
DESIGNATION : PRODUCTION ENGINEER
PERIOD : MAR 1993 TO MAR 1995
Key Deliverables
Review of client specification and drawing before marking for Quality plan.
Preparing the daily progressive report, and daily man power report and control the lab our activities.
PERSONAL DETAILS
Date of Birth : 15.05.1971
Nationality : Indian
Marital Status : Married
Passport No : Z3339071
& Validity : Up to 08.08.2026 Issued at Musct-Oman
Address for communication
CHINNUSAMI CHELLAMUTHU
PLOT NO 5, SHRI SAI ILLAM,
THIRUNANDAVANAM 1 ST STREET,
BALAJI NAGAR, PATTABIRAM
CHENNAI 600072,TAMILNADU,INDIA
Email :adidc1@r.postjobfree.com
MOBILE:+918*********.