Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Raipur, Chhattisgarh, India
Salary:
12 lakhs per month
Posted:
October 30, 2020

Contact this candidate

Resume:

Resume

Anil Kumar Chouhan

Village – Badekot,

P.O. – Singhara

Thehsil malkhrauda

Distt - Janjgir - Champa

State- chattishgarh

Pin no- 495691

Mobile number +256********* (Uganda)

E mail id adhe6c@r.postjobfree.com

Passport number: G 5334114

Anil Kumar Chouhan

Father's Name : Mr. Resham Lal Chouhan

Date : 22.06.1983

Age : 37Year

Sex : Male

Nationality : Indian

Marital Status : Married

Religion : Hindu

Language Known : Hindi & English (verbal & written)

Academic Qualification : 1] H.S.C. (12th ) from M.P. Board Bhopal in 2001

2] H.S.C. (10 th) from M.P. Board Bhopal in 1998

Technical Qualification 1.DIPLMA IN MECHANICAL ENGINEERING FROM GOVERNMENT POLYTECHNIC college Durg chattishgarh

2.B TECH IN MECHANICAL ENGINEERING FROM KARNATKA OPEN UNIVERSITY MYSORE

3.EXECUTIVE POST GRADUATE PROGRAM IN

THERMAL POWER PLANT OPERATION

SYNERGEM THERMAL POWER PLANT TRAINING INSTITUTE NAGPUR MAHARASTRA

[Recognized by central electricity authority under ministry of power govt. of india]

4.PGDM IN PROJECT MANAGEMENT

MITS DE PUNE

APPEAR FINAL YEAR EXAM WAITING FOR RESULTS

Period since augst 2006

organization M/S TRIVENI ENGINEERING & INDUSTRY LTD.

Sugar Unit Khatauli (U.P)

An Integrated sugar unit factory capacity 15000 TCD 46 MW

Co-generation power plant unit including bagasse based travelling grate boilers

(2x120Ton ) capacity make IJEC JOHN THOMSON.86 kg/cm2 pressure and 515.C temp.

Designation : Junior Engineer (Turbine DCS)

Job Work : worked in power plant as turbine dcs operator, operating

turbine during running season and looking maintenance activity during off season, turbine capacity (1x24MW) Skoda Turbine condensing com extraction,electro hydro governing system checoslavia technology and(1x22MW) Fincantieri. Back pressure turbine, Italian technology.

Job summary eraction of lube oil line, main steam pipe line up to esv flange, turbine extraction line, Acw and Mcw cooling water lines,

High speed and low speed alignment

Turbine cold and hot start up

Oil flushing

Steam blowing with target plate

Trial all pumps and fans

Checking all interlock and turbine protection system

Checking condenser leakage

Oil filter cleaning

Condenser tube cleaning

Organization KAKIRA SUGAR WORKS 1985 LTD (UGANDA)

Madhvani group, east Africa

An integrated sugar unit 7000TCD sugar mill and 28.5 MW Co- generation power plant, boiler capacity 2x50 Tons bagasse fired travelling grate boiler,45kg/cm2 pressure and 495C temp.

Period December 2007 to may 2011.

Designation TURBINE CUM BOILER SUPERVISOR

Job work worked in shift as supervisor shinipon Japanese turbine 21.5 mw plc system and boiler section

Eraction of lube oil line

Condenser lavel check up to bottom turbine casing flange,

Alignment of tg gear box coupling and all.

Vaccum pulling

Check up all motor pumps oil lavel coupling guard etc.

Maintaince of Tg auxilliry system

Oil flushing

Additional activity I know how to do synchronise with grid and generator braker

period since may 2011 to feb 2012

ORGNIZATION M/s skoda power pvt limited

Designation Turbine engineer (service & R & M)

Job Work worked as a field service engineer to take the function responsibility for service activity erection overhaul, up gradation an other service requirement including R & M and EE R&M.110 MW capacity

Job summary knowledge of dismantling, inspection, assembly and commissioning of steam turbine component.

Participate as Regional Service Team Member

Lead execution of retrofit projects

Execute project management and technical advisor duties

Support trouble shooting issues

Work to be performed at customer locations through India,

Timely completion of site/service/inspection reports and other administrative activities

Drive customer satisfaction through commitment to quality

Support business growth initiatives

Prepare timely and accurate technical reports for customer records and reference for future outages

Prepare job planning documents that define in the scope of outages to be performed through engineering instructions, drawings and process instruction

Provide technical direction to skilled labour performing work on customer sites

Maintain strong safety mindset to assure the executed work reflects the technical requirements within company safety standards

PROJECT 1.Rajshree sugar and chemicals ltd,tamilnaducommissioning overhauling and trouble shouting of existing make Skoda turbine and new turbine and also looking spares,

, 22MW condensning cum extraction turbine,air cooled condenser.

2.Dharani sugar and chemicals Ltd, tamilnadu,15 MWcondensning cum extraction turbine,water cooled condenser,

3.Torrent power, Ahemdabad, R and M 110 MW working as project leader erection and commissioning work

Organization KAKIRA SUGAR LTD (UGANDA) east africa

An integrated sugar unit 7500 TCD sugar mill and 51.5 MW Co-gen boiler capacity 2x50 Tons bagasse fired travelling grate boiler,45kg/cm2 pressure and 495C temp.,and 1x160 tons,66kg/cm2 temp515C,turbine 21.2 and 30 MW shinnipon Japanese turbine.

Period feb 2012 to till date

Designation shift superintendent co gen

Job work working in co gen section as a shift incharge and taking care function responsbilty for the operation and maintainance work of 21.5 and 30 MW turbine shinnipon Japanese turbine and ijt boilers 160 tons and 50x2 tons boiler including dm plant etc.

computer skills MS word, MS excel, etc

Current salary : 2500 Dollars CTC

Expected salary : nagoatible as per facility

Notice period : 3 months



Contact this candidate