RESUME

POST APPLIED – CONSTRUCTION MANAGER CIVIL,PROJECTS MANAGER CIVIL FOR ALL OVER INDIA PROJECTS NAME: RAKESH KUMAR PAL

PERSENT ADDRESS –KORUKONDA,RAJAMUNDRY,ANDHRA

PARMANENT ADDRESS- 130, RK PAL,VED CITY,ahmedpur grant (HARIDWAR) Mobile no -910-***-**** adh3gr@r.postjobfree.com TECHNICAL QUALIFICATION:

10Th/ inter mediate with three year civil engineering diploma from government up technical board KL polytechnic roorkee in 1998 year with 22 year experience

TOTAL WORK EXP - 20 year civil construction field as like project,industrial road and building,shopping mall ( refinery reliance j3 projects at Jamnagar, hero Honda projects at haridwar,road with industrial road,

, thermal power plant reliance thermal power roza (sahajanpur), NTPC,BHEL(rihand,anpra ),LNG petrochemical plant, housing project birla at dahej, building & RELIANCE MALL at delhi,industrial road, honda auto industries at haridwar, water supply projects with distribution pipe line at pakkur (Jharkhand ), 150 km IOCL crud oil pipe line with RCP control room building, pilling work up to 1200mm & 20 meter depth with DMC Rig and hydraulic ring with pile load testing vertical load horizontal,pull out test etc,

PERSENTLY WORKING IN : SIMPLEX INFRASTRUCTURE LIMITED AS CONSTRUCTION MANAGER CIVIL AT IOCL PIPE LINE PROJECTS PARADEEP TO HYDERABAD CROUDE OIL PIPE LINE,AND ITS MOV/RCP BUILDING . JOB PROFILE & ROLE: SUPERVISION & EXECUTION OE CONSTRUCTION INDEPENDENTLY HANDLING ALL DAY TO DAY ACTIVITIES OF SITE EXECUTION.

Mobilization of resources, budgeting for the projects well in time. Planning - project / annual budget. Responsible for the Preparation of budget. ResourcesMobilization-Sub-contractors, equipment,material,manpower - with the helpof Project coordinator. Completely responsible for sitemanagement.

Verify P C bills & ensure bill realization from the client. Responsible carry out fieldactivitiesduringerection&Commissioningand work forclosureof contracts. To handle quality related /client complaints during project period. Responsible for project delivery.

Liaisonwitharchitects/managementtoexpeditedetaileddrawingsconsistentwithprojectiveobjectives. Develop work plan for theproject

Ensure completion as per specification

Obtain sets of approval and working drawings.

Responsible for Project Planning and Project Budget in consultation with the coordinator. Planning of resources, arrangement of resources and allocation of resources as per the project plan. Responsible for preparing time cycle charts of major activities of work. Overseeing construction schedule and highlights anticipated delays or deviancies in advance. Preparing of DPR on daily basis.

To ensure the quality standards as per the clients requirement Liaisonwitharchitectsandmanagementtoexpeditedetaileddrawingsconsistent with projectiveobjectives. To verify the bills related to theprojects

DESCRIPTION OF WORK -

(1)MITTAL CONSTRUCTION UNIT MUZAFARNAGAR -1998-1999 WORK- NEW SUGAR MILL CONSTRUCTION WORK AT MUZAFARNAGAR TICOLA SUGAR MILL CIVIL AND MECHNICAL WORK MILL HOUSE,CHIMNEY,MAIN PLANT BOILER HOUSE ETC.

(2) GS JAIN ASSOCIATE P(LTD) & GEOTECH CONSULTANT P(LTD) DELHI TIME; 1999 TO2002

POST- site engineer to site in incharge

Work-pile foundation work and soil testing, Dmc pile, auger pile pile load test all test Work location –ANSAL HOUSING limited gowhati(Assam)-housing project,GANNON D. LIMITED-Nalco aluminium at damanjodi (Orissa), switch yard 132 kv (SUB STATION) WITHauger pile and foundation uppcl at muzaffer nagar(up),BHAGHEERATHA ENGINEEING LIMITED- bridgepilling,Dmrc pile and soil testing at all Delhi

(3)COMPANY NAME–A.N.S LIMITED -DELHI TINE; 2002 TO 2003 WORK – L.N.G PETRONET PLANT AT DEHEJ (GUJRAT)-all piple line foundation with bol 40 km and administration building, road crossing bridge etc, birla housing project at dahej (Gujarat) POST –SR ENGINEER with site execution include billing act 4) COMPANY NAME –G.S DEVELOPER P(LTD)

WORK; CLIENT-SHREE RAM FERTILIZER PLANT AT KOTA-PVC RAW MATERIAL PLANT WORK LIKE PILLING

,FOUNDATION WORK BUILDING,STEEL STRUCTURE TRUSS SIDE CALLADING TIME- 29TH AUGUEST - 2003 TO 2005

SR ENGINEER TO SITE INCHARGE –total work like lay out to all billing etc by only one staff me 5) COMPANY NAME –FEED BACK VENTURE P (LTD), DELHI

POST – SR engineer to all in charge

TIME: sep 2005 to aug 2007

WORK- PMC WORK client hero Honda,hero Honda plant new at sidcul haridwar,project cost 345 crore and its part plant 5 nos plant Our work was coordinationwith client and architect and contractor, maincontractorwasB.L KASYAP LIMITED at the all plant or our work all checking lay out, billing quality and all site issue and all drawing study according to our cost 6) COMPANY NAME –AHALUWALIYACONTRACTS(INDIA) LIMITED POST- SR ENGINEER TO SITE INCHARGE TIME; AUG 2007 to SEP 2008

WORK; CLIENT RELINCE –shopping complex mall at vikaspuri (Delhi)I was handle this work starting to all rcc work with all responsibility like layout and foundation bbs,rcc work,contractor billing with time quality andmanagesitecontractorwithall responsibility and managequality.

(7)COMPANY NAME- Apco infratech limited, Lucknow

WORK: RELINCE THERMAL POWER PROJECT AT ROZA-600*2 MW TIME 2008 TO 2009 Post sir engineer to incharge coal handling plant starting to endWork-reliance thermal power project 600*2 MW Main work – Coal handling plant with wagon tripper MB1, MB2, boiler, rail track 8) COMPANY NAME-SIMPLEX INFRASTRUCTURE AT POST CONSTRUCTION MANAGER CIVIL NOW POSTED IOCL PIPE LINE PROJECT AT RAJAMUNDRY IOCL PROJECTS -

COMPLETED WORK AT NTPC –RIHAND THERMAL POWER,BHEL ANPRA THER MAL POWER,RELIANCE REFINERY J3 AT JAMNAGAR GUJRAT,

TIME – 2009 TO CONTINOUS

POST –ALL SITEWORK MANAGE LIKE CONTRACTOR AND LABOUR AND STAFF AND CLIENT WITHQUALITY WITHPROGRESS,CHECKING CLIENT BILL AND CONTRACTOR BILL AND CHECKING FOR CLIENT BILL BEFORE HANDOVER TO CLIENT

WORK – FIRST THERMAL POWER PLANT -600 MW (N.T.P.C AT RIHAND,VARANSASI(UP)-BOILER,POWER HOUS WITHT.G.,PUMP HOUSE -FORBEY CHANEEL, CW DUCT,COLLING TOWER,AND CHIMNNY FOUNDATION ALL WORK WAS HANDLE BY ME LIKE EXECUTION TO END AS CONTRACTOR,LABOUR,STAFF MANAGE AND SITE WORK HANDLING WITH TIME,QUALITYAND COST

2ND THERMAL POWER PROJET 600 MW MAIN CLIENT IS UPPCL 2ND EPC BHEL- ALL WORK EXECUTEBY SIMPLEX AS MAIN PLANT,ESP,BOILER,T.G, POWER,HOUSEBUNKER,CWDUCT,CHANNEL,COLLING TOWER -2 NOS –ALL WORK WITH PILLING BY HYDROLUC RIG,CHIMNNY –FOUNDATION WITH PILLING BY HYDROLIC RIG

Computer skilled – all auto cad, excel, word, net, m.s project for site planning ACADEMIC QUALIFICTION-

High School from U.P. Board Allahabad in1992.

Intermediate from U.P. Board Allahabad in 1994

Technical qualification - three year civil engineering diploma-1998 from k.l.p (roorkee) (up government Technical

.board) roorkee (now is in uttrakhand)

PERSONAL DETAILS

Father's name Bubu ram

Date of birth :

Marital status :

Language known :

Nationality :

2\07\1975

married

Hindi & English

Indian

PHONENO: 910-***-****

Email id:; adh3gr@r.postjobfree.com

Pass port no; E7990431 (rakesh Kumar pal)

Salary dra 16.5 lack

Exp salar (negotiable)

Rakesh kumar pal DATE – 11-10-2020